Responds to NRC Re Violations Noted in Insp Rept 50-346/84-21.Corrective Actions:Fume Hoods in Lab Repaired & Velocity Measurements Taken.Testing Procedure Added to Maint Program
ML20100C015
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/31/1984
From: Crouse R
TOLEDO EDISON CO.
To: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20100B998 List:
References
1-474, NUDOCS 8412050238
Download: ML20100C015 (1)


Text

.g o

-Docket No. 50-346 TOLEDO EDISON License No.'NPF-3 i

RO1AAo P. CAOUSE Serial No. 1-474 vce r**at

%=.r

October 31, 1984 u

i Mr. C. E. Norelius Director of Reactor Projects United States Nuclear Regulatory Commission Region III i

799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Norelius:

)

Toledo Edison acknowledges receipt of your October 2, 1984 letter (Log No.

1-1038), and enclosure Inspection Report No. 50-346/84-21(DRSS).

The inspection report identified no items of noncompliance with NRC re-quirements, however, the inspectors did observe a problem with low air flow in laboratory fume hoods and request a response to what action will be or has been taken to restore air flows to within acceptable limits.

Subsequent to this inspection, Toledo Edison has repaired the laboratory j

fume hoods and velocity measurements were taken on October 17, 1984, with the following results:

Hot Lab (contaminated area) 190 ft/ min.

Hot Lab (clean area) 130 ft/ min.

Cold Lab 135 ft/ min.

Primary Sample Panel 155 ft/ min.

Testing of these hoods were added to the Davis-Besse preventative mainte-nance program.

Very truly yours, RPC:DWB:SGW:nif cc: DB-1 NRC Resident Inspector 8412050239 841119 PDR ADOCK 05000346 G

PDR THE TOLEDO EDISON COMPANY EDISON PLAZA 30J MADISON AVENUE TOLEDO OHIO 43852 NOV 9 1984

.