ML20100B716
| ML20100B716 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/15/1995 |
| From: | AFFILIATION NOT ASSIGNED |
| To: | |
| References | |
| OLA-3-I-MOS-246, NUDOCS 9601220061 | |
| Download: ML20100B716 (4) | |
Text
.-
. _ ~ -
f h0$/0h-5
[f-&
1
)
OOC 7IEO NUCLEAR REGULATORY COMMISSION I AHIBITNO.T M b
[ BEG 1N!TA'E No. 101, SIDE A Docke No. 50-424/425 OLA-3 P
1 in the rnener of Georola Power Co. et al. Von 6e Units 1 h 2 2
VOTCE:
[Inaudibl Osten O Appik M**"*a ' ON gis wd Ow W SO
,95 GCI 20 P4 3/
i Dd* 0 W W ""***
3 VOICE:
[Inaudibls
]
0Fnt:F OF r !y 4
002 IINI
. VOICE:
[ Inaudible.)
Eh"N i
came er 4 nro ed he woon):ipg downstairs
- '4 on of cw/W Coming out of the mee 5
VefcEl s
n do l
e rgw.9 (inaudible),make sure that you knew about certain events 6
7 that had happened.
kW f
8 d VOTCIn
[I.::d151c.}-
pvj j
r
[l'1 EOfeBt Okay.
Okay.
And I know Ei.wsdible) and j
9 in 10 it's,[ inaudible) here, but the specific issue was this start
[
CA8/
11 of the A diesel.j And this happened way back a while, but he i
12 wanted to make sure that that information had flowed up 13 because of the discussion, the information flow.
14 h VOICE:
I'm not --
15 6h YOICB:
Is there something besides I'm screwing up 16 and. starting the wrong diesel, is there something --
'The II-- -
M YO3eE:
[ Inaudible.
17 BpcD4R :
L % d:ble'l]
i 18 AW VefcKi When the IIT team was here, I guess they
-fbu wo I:$e abi 19 were at that point [ inaudible) Thursday and Friday, we went 4
20 out to do some testing on the B diesel, okay?
And there was 21 going to be a run of the B diesel.
I may be able to find it 22 here.
I think --
23
-((7yO3ee:
Does it have any historical significance 24 now I guess is the question?
I mean, they mistaken,-
Thecdy--
%l V,03ee:. They started -- they called the control 25 4
I 9601220061 950915 PDR ADOCK 05000424 J
T PDR i
2 1
room and asked them to start the -- I think Stokes was out 2
"[hereand--
3 I'YeTCE:
Yeah.
And they started the wrong diesel.
M VOTCE:
4 They started the wrong diesel.
5 hO VOICE:
Okay.
6
- 5 VOICEt The diesel was run for about a minute or 7
so and shut down.
They realized they had started the wrong B
diesel.
And that was probably somewhere in -- probably 9
[ inaudible.)
Probably this start right here was the one 10 that they were planning on doing, okay?
11 N
"0 ICE:
[ Inaudible.)
b VOICE:
12 And the only significance is that there 13 may have been a quarantine on this diesel at that time.
I 14 don't know that.
That was in the infancy of the development 15 of the quarantine --
~
( h,VI:kICE:
Yeah.
There may or may not have been.
16 17 MMI, VOICE:
[P ible) that timeframe.
i (S
VOI.ce:
I think this was the diesel was still --
18 19 the A diesel was still a diesel we were relying on for -- if l
20 we had another blackout, we would try to start it.
/% voleet 21 In that timeframe.
bdore 6[ VOICIT:
In that timeframe Jef the B diesel.
So I 22 23 don't think -- unless there's some other historical wh 24 significance, I would do nothing with it except for your 25 having the people look at the LER,
60 * #D -
l i
i c
i 1
C ICE.1 Right.
4 i
l 2
"OIO::
(Inaudible}-ccisecticTG i
f 3
Mh:
The interest here was to make sure that 4
managweent knew --
b 5
-Vefelk Okay.
b.uOIc h -- that we made that mistake and we did it 6
i
)
7 when the team was here and that they weren't sure if it was t
l 8
quarantined at that time or not, but there was that i
UJM Ef%
9
[ inaudible.)
That's what this [ inaudible) make sure that 1
10 everybody knew.
W VefcE.
Okay.
f 11 M,
/!+z -vofes:
okay.
one other thing that I'v gotten 12 j
O ghacd (f.u oh ao 9 J
13 (inaudible)pon, too, was in terms of iMiet-ioner-i last week sometime there was an inadvertant App larent1,
14 l
IE 0%
(inaudible)4 ARV.
Were you aware of that?
j 15 h
WOTCf:
I 16 No.
ht VD3eE:
A Unit 1 ARV lifted for approximately four 17
~}k U b yb a3 18 minutes, blev steam up (imad4ble) top of containment.
It 4
j 19 was observed from the windows of the service building by two i
20 individuals who called operations.
They -- operations 1
superintendentormanagercalledtheco0trolroomandthe 21
.Nt hatgg 22 control room was unaware pf the ARV3 That occurred, it N Sch 23 lifted for about four minutes and then apparently receded by 24 itself.
That occurred at the point in time that Unit-1 was 25 being siahed-on and it was probably in the 15th percentilc-Qhsb Hij
}
i
pogyenje or bin b '
1 (inaudible.)
2 I can't tell /ou the date or the time because I 3
don't remember when that was, but when Unit 1 was b' ting l
4 brought back and at the time that we were slakring was about Synch ny 5
the time that that occurred.
Til ask. cynben hf7VOIQE:
FIiiandiye-} gprobably associated with maybe 6
it.>r4 N fit >> w? O rfT>o{. f%babI k"f;'LS Y
i 7
the (inaudible.]
[Ina dible]jand got pressure too high.
7krl) Oe l'f'4 Nim is Or
((:r VOICE:
(Inau ble) temperature mode and they 8
9 didn't see the load rejection and the temperature got up a hvh
/tN<d 10 little high and the [ inaudible) ARV.A That's what it sounds
_17 ni A />$ St' 11 like to me.
I'll check on it, but I don't -- (inaudible)
Jiyihhk 12 necessarily (inaudible.)
[ k VOICE:
I'm not sure if it's significant or not, 13 14 but I think the communications of the event is what's 15 significant and I think the discussions down there 16 stimulated a lot of people.
17 VOICE:
Okay.
Good.
18 (Pause.)
19 (END TAPE NO. 101, SIDE A.
SIDE B NOT RECORDED.)
20 21 i
22 23 24 25
-.