ML20100B687
| ML20100B687 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/07/1995 |
| From: | GEORGIA POWER CO. |
| To: | |
| References | |
| OLA-3-I-MOS-232, NUDOCS 9601190258 | |
| Download: ML20100B687 (1) | |
Text
_
p g$g - g 3 Z_
Tane #3 DOCKETED F
USNRC Side A Date 2 2W
% OcT 20 P3:28 Location: Bockhold's office OFFICE OF EECRETARY 00CKETING & SERVICE B' NiCH l
Bockhold : That's your copy of, uh -
l t
Mosbaugh : Okay Bockhold - the evaluation. Okay. The first goal and accountability was associated with the organizational plan and the way I calculated that it looked to me like a 4.6 when i
you added all the numbers up and appropriately divided.
Mosbaugh : Okay s
Bockhold: it was very objective and there's really not much discussion on it.
t Bockhold : The, uh, next one was associated really with teamwork communication, leadership i
and inter-department site \\ corporate areas OK. I put down the same for you and for Skip. You and Skip achieved peaceful coexistance and the organizations worked effectively together. To achieve complete syntergy more effort will be required.
Mosbaugh: Okay i
Bockhold : Both are fully acceptable.
Mosbaugh: Okay.
Bockhold Goals fully achieved. I guess is the terminology.
Mosbaugh: Okay Bockhold : Basically I combined those for yours and come down evaluation 4.5 overall.
Why don 1 you read your strengths the way I see them.
I l
i i
NUCLEAR REGULATORY COMMISSION I
Docket No. So.424/425-OLA-3 EXHIBITNO. T
- TD l
In the rnatter of Georain Power Co et al.. Vootle Units 1 & 2 A
K 24 O Sta" O Apphcant [ntervenor O Other G
PDR O identif eived O Rejected Aeporter 5(>
+
Date b fI Witness hW5C h. ckbeid