Provides NRC W/Notification of Completion of GL 89-10, Safety Related Motor-Operated Valve Testing & Surveillance - 10CFR50.54(f)
ML20100A360
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/29/1995
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-10, NUDOCS 9601050129
Download: ML20100A360 (2)


Text

. _ -

_ _... ~.. -

~

- Station Support Department -

d' 1

.v PECO ENERGY reco e e 9v cor a v Nuclear Group Headquarters 965 Chesterbrook Boulevard Wayne, PA 19087 5691 December 29,1995 i

Docket No. 50-278 -

l License No. DPR-56 F

U. S. Nuclear Regulatory Commission

. ATTN: Document Control Desk l Washington, D. C. 20555 7

L l

Subject:

Peach Bottom Atomic Power Station, Unit 3 i

Generic Letter 89-10, " Safety Related Motor-Operated Valve Testing and Surveillance - 10CFR 50.54 (f)"

NRC Notification of Completion of items Contained in First Paragraph of item i.

References:

1)

Letter from D. R. Helwig (PECO Energy Company) to NRC dated December 28,1989 2)

Letter from D. R. Helwig to NRC dated March 16,1992 3)

Letter from G. A. Hunger, Jr. (PECO Energy Company) to NRC dated April 14,1994 i

i 4)-

Letter from G. A. Hunger, Jr. (PECO Energy Company) to NRC dated August 2,1995 i.

l

Dear Sir:

I

.NRC Generic Letter (GL) 89-10 " Safety Related Motor-Operated Valve Testing and Surveillance - 10CFR 50.54 (f)," item m, requires licensees to notify the NRC in writing

.within 30 days after the actions described in the first paragraph of item i of the GL have been completed. The purpose of this letter is to provide the NRC with notification that these actions were completed on December 29,1995, for Peach Bottom Atomic Power Station (PBAPS) Unit 3 valves in accordance with PECO Energy

-96olo5o129 951229 PDR ADOcK oSooo278 P

PDR

.g(p{ipl U0U025

December 29,1995 Page 2 Company's (PECO Energy) commitments as documented in the referenced letters. A GL 89-10 program completion report is being prepared and will be available for review.

In response to GL 8910, PECO Energy developed and implemented a program to verify the design basis capahi!ity of motor operated valves (MOVs) within the scope of the GL program. The GL 89-10 program MOVs at PBAPS Unit 3 have been tested and setup with the best available data.

PECO Energy has made a significant commitment of resources toward implementing the GL 89-10 program at PBAPS. Completion of the program involved more than a five year effort. Future program changes deemed necessary in response to emerging issues and newly available data will be handled under the provisions of 10CFR50.59.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, b.

G. A. Hunger, vr.

Director - Ucensing cc: