5...
OPERATING DATA REPORT DOCKET NO. 050-0331 9 ATE 03-15-85 COMPLETED BY Kenneth S. Putnam TELEPHONE 319-851-7456 OPERATING STATUS Notes
- 1. Unit Name Duane Arnold Energy Center
- 2. Reportino Period February, 1985
- 3. Licensed Thermal Power. (MWt):
1658
- 4. Nameplate Rattnq (Gross MWe): __ 565
' 5. Deslan Electrical Rating (Not MWe):
538
- 6. Maximum Dependable Capacity (Gross MWe):
545
'7. Maximum Dependable Capacity (Net MWe):
515
- 8. If Changes Occur in Capacity Ratinos (Items Number 3 Through 7) Since the Last Report, Give Reasons:
- 9. Power Level to Which Restricted, if Any (Net MWe):
Maximum attainable power approximately 795,
- 10. Reasons For Restrictions, if Any:
Coastdown due to fuel depletion.
This Month Yr-to-Date Cumu lati ve
- 11. Hours in Reporting Period 672.0 1416.0 88344,0
- 12. Number of Hours Reactor Was Critical 29.8 773.8 63362.5
- 13. Reactor Reserve Shutdown Hours 0
0 150.3
- 14. Hours Generator On-Line 29.1 773.1 61620.8
- 15. Unit Reserve Shutdown Hours 0
0 0.0
- 16. Gross Thermal Energy Generated (MWH) 30900 1005468 77465403
- 17. Gross Electrical Energy Generated (MWH)
'0264 335850 25923204
- 18. Net Electrical Energy Generated (kWH) 9507 313653 24269804
- 19. Unit Service Factor 4.3 54.6 69.8
- 20. Unl t Aval tabl 18 ty Factor 4.3 54.6 69.8
- 21. Unit Capacity Factor (Using MDC Net) 2.7 43.0 53.3
- 22. Unit Capaci ty Factor (Using DER Net) 2.6 41.2 51.1
- 23. Unit Forced Outage Rate 0
0 16.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Continued refuel outaae.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
End of May 1985
) M (9/77) 32 g g g
/
a
=
2
7
+.
W.'
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-0331 UNIT Duane Arnold Energy Center DATE 03-15-85 COMPLETED BY Kenneth S. Putnam TELEPHONE 319-851-7456 MONTH February, 1985 DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 373 17 0
~ 2.
12 18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 14 0
30 15 0
31 16 0
INSTRUCTIONS On this format, list the average dally unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole mecewett.
(9/77)
(
1 9
/
S F N
7 1
.o 7
)
S F co h r e c d e u d 0
D l
2 a
e
/
t d
0 e
2
/
8 5
2 e
H GF E DCB A R H;2o e
- - - - - - - - e S
OO A OR R ME a t p dp e e a q s h e meg f iu o or i r u u n i n i,
r a n a l
e t p :
(
t it a l
e m E i s ot i n e 3gsOC x ot r on a n 6
p n r rg n t 4
2 3gCn l
a a Ty c
al t r eF U
i i a R a
9 N
n E vie ol I
)
r en s rl T
r i t u
o n r T r R
S N
r g
e e i
E H
C y s8 P
U
(
c s
(
a E
& t t E O
T x
i x
R D
p L o p
T O
l i n l
W a
c a
M N
e 4
O S
i I
k +* p c,- O.
N n
n n
)
s
)
T A
g yICe H
N C
e 1
nm D
oO3C EgtOb E
F P
xa e
O m
b W
i r
E n
u R
a a
t r
R i
R y
E o
e D
n p E c U
o v a 1
C r e a 9
T' t n 5 8
I t "
5 O
N S
3 4 3 2 M
1
- - - - e gguF W OA M Mt ge t u a a h h t n n o e ou u d r m a a :
(
a l
l OOE OgtL E t x i S O
p cc ge l
r T CD U D a S a e oa n o i c.m mt i c l
n r ep et k
)
a p
l e
.m h e
' N t o t a
n e 0 m N'
e d 3
e.o 5
4 3 b 1
D 1 y 5
u E
0E E f E 9
a x
1 v n ox K
8 n
0 h
6 e t r i C
8 e
5 e
5 h
i 1 n r a
5 n
0 b
)
ty P b u
1 n
A i
r i s
e r
0 t
R S e t e
7 t
n 3
e h p 4
h o
3 1
p ea G 5
l 1
oer -
S r t a I
6
.S d
a t s t n E
m i s P
n e
(
f o t u
e L on r t
r S
E r u
n a
o R
oc a
v u
)
L f t m
r i
i C
c F cD o e
e i e a n n
l n t s t
es a e
e r
( e N
U s
D R
E G
d s
d n
r n
c s
e a
r k
n o V
a n
of r
I e
o i
m S
r t
a M
b i
t n t
c o n
c ei t
g m
e p t C
u n
u p
s a i
u s
n r P
y d
c n
I a
a N
l a
I p
r S
6 O
l v
e d e 1
5 I
u en n r 3
t h
4 T
b s
vi a p 3
E t
7 P
e u
ib 0
e I
r r
s r s n R
o n u u
I d
n 1
0 I
n 5
C d
t et r
5 e
8 S
n h
o sg 0
K E
a a
eI t d n r
5 9
D n
rC l
i A
8 y1 n
i p P f
et b 3 w
d mH o wa
.~
5 o
l o
o 1
d e d
l cf g f c on N
e n r
u o
n oe u
3 t o a
b d
i r
t D 0
eh e
e e r s e l
p t
r l
i al s k t ep e u a l
au cI t ml n
n d p o p r o; a oe a
a e e r eo DUD CT g
g h r d rt e
e c
y B
B S
H sev l
T a
E N
V C
E s
N N
n r
A O
o e
N P
i k
E M
t a
T O
a e
N C
l r
I o
B A
s M
I m
e u
n D
m u
i E
a c
b T
e a
r A
t V
u L
S T
E s
s R
n u
I u
i r
C r
Y a
o P
o T
M T
H T
E F
A S
/
9 O
J A
M s
re M
k E
a T
e l
S r
o Y
B o
S P
mu n
m u
o a
c i
e a
s t
V s
S e
s r
n u
I p
i r
C p
a o
P u
M T
H S
i on E
l T
o A
c D
n O
E.
g,.
Docket No. 055-0331 Unit Duane Arnold Enerov Ctr Date 03-15-85 Completed by Kenneth S. Putnam Telephone 319-851-7456 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE 02/01/85.
At 0000 hour0 days <br />0 hours <br />0 weeks <br />0 months <br />s-the plant was In normal operation at 425 MWe (gross).
02/02/85 AT 0507 hours0.00587 days <br />0.141 hours <br />8.382936e-4 weeks <br />1.929135e-4 months <br /> the main generator was taken off line.
At 0548 hours0.00634 days <br />0.152 hours <br />9.060847e-4 weeks <br />2.08514e-4 months <br /> the reactor was driven su bc ri ti ca l.
At 1845 hours0.0214 days <br />0.513 hours <br />0.00305 weeks <br />7.020225e-4 months <br /> all control rods were fully inserted. After shutdown a spurious Reactor Protection System trip was experienced due to a f ai led LPRM (resulting in APRM 155 trip) at 2351 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.945555e-4 months <br />.
(LER 85-04) 02/03/85 At-0402 hours the reactor vessel head vents were opened placing the plant in cold shutdown.
02/05/85 AT 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br /> the mode switch was placed in the refuel position.
02/07/85' The reactor vessel head bolts were detensioned.
02/09/85 The removal of the reactor vessel head was completed by 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />.
02/10/85 At 0145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br />.the steam dryer was removed from the vessel.
02/15/85 At 2io7 hours, defueling of the reactor vessel commenced.
02/16/85 Personnel erroneously utlllzed an Internally contaminated hose to flush a nonradioactive floor drain.
The effluent from the drain is routed to a holding tank.
Sampling of the tank confirmed no detectable contamination.
02/19/85 The reactor vessel was fully defueled by 0940 hours0.0109 days <br />0.261 hours <br />0.00155 weeks <br />3.5767e-4 months <br />.
(Normal DAEC refueling practice is' full core defuel to spent fuel pool.)
02/22/85 Plannod comprehensive refuellnq outage Inspection of the HPCI 3-tu r bi ne discovered cracked reversing chambers.
This problem has been reported previously in DAEC-unique reports.
(LER 85-07 pendino)
}
02/28/85 At the end of the month the refuel outage continued with the vessel defueled.
I e
F_.
6-fe;
\\,
pf V 3 ep
/
e.
9, r 1,
Docket No. 050-0331
'y i
234 s
Unit Duane Arnold Eneroy Ctr f
"I +,
date 03-15-85 f'
Completed by Kenneth Putnam i
~'$r Telephone 319-851-7456 7
si*
y t,
REFUEllNG I N FOj M A T I'ON s
1 Name of. facility.d+.
V..
'q A.
Duane Arnold Energy Center
/
/
2
. Scheduled date fs'r next refueling shutdown.
A.
Currently in progress.
~
3.
$cheduled.date for restart following refuelino.
A.
May, 1985 4
Will refueling or ~ resumption: of operation ~thereafter require a technical speci fication change or other li censo amendment?
'l
- 5 Yes.
.a A.
Reload _llconse submittal.
s y f 0b N w. fuel bundles being introduced for B.
A d d i t i on~a l MAPLHGR curves Cycle 8
's C.
Revised Spent Fuel Storage rochnical Spectfications.
g ;,,
D.
Supplemental Rhload License submittal for Cycle 8 Lead Test Fuel Assemblies including MAPLHGR curves.
7i 5.
Scheduled date(s) for submitting proposed licensing action and 1
' supporting Information.
s
.A.
Submitted C.
Submitted a
R.
Submitted D.
Submitted 6
Important IIcensing considerations associated with refueling, e.g.,
new or different-fuel design or supplier, unreviewed design or pe'r f orma n c e analysis methods, si gni fi cant changes In fuel deslon, new operatino procedures.
5 GE Lead' test assembIles whlch Incorporate advanced fuel desions will be loaded for Cycle 8 7
The number of fuel assemblies (a) In the core and (b) In the spent fuel storage pool.
A.
a).
O b) 961
c_
2 s.
s.
- , w se e-Docket No. 055-0331 l
Unit Duane Arnold Eneroy Ctr Date 03-15-85 Completed by Kenneth S.
Putnam Telephone 319-851-7456 REFUELING INFORMATION (Continued) 8.-
The present IIconsed spent fuel pool storage capacity and the size of any' increase In'llconsed storage capacity that has been requested or is planned, in number of f uel. a s sembl i es.
A.
2050 9
The projected date of the last refueling that can be discharged to the s ('
~
spent fuel pool assuming the present licensed capacity.
A.
1998
>(
~s e
C1
IJ,s y.4.,,
y.
w v
I lowa Electric Light and Ibwer Company March:15, 1985 DAEC-85-0217 Director, Office of Inspection and F'nforcement U. S. Nuclear Regulatory Commission
- Washington, D..C.
20555-Attn: ' Document Control Desk
Subject:
Duane Arnold Energy Center Docket.No. 50-331 Op. License DPR-49 February, 1985 Monthly Operating Report
Dear.. Sirs:
'Please find enclosed 12 copies of the Duane Arnold Energy Center Monthly
~
Operating Report for February,1985.
The report has been prepared in accordance with
- the.quidelines of Requiatory. Guide 1.16 and distribution has been made in accordance with DAEC Technical Specifications, Appendix A, Section 6.11.1.c and Regulatory Guide 10.1.
Very truly yours, r
Daniel L. Mineck
. Plant-Superintendent - Nuclear Duane Arnold Energy Center DLM/KSP/kp*
- Enclosures
- File A-118d, TE-5
. 'cc : : Director, Office of Inspection Mr. Phillip Ross and Enforcement U. S. Nuclear Regulatory Commission U.- S. Nuclear Regulatory Commission Maryland National Bank B1dg.
-Region III
. Washington, D. C.
20555 799 Roosevelt Road Glen Ellyn, -IL - 60137.(1)
NRC Resident Inspector Director, Office of Management.and Mr. Dennis Murdock Program Analysis Central Iowa Power Cooperative
~
U. S. Nuclear Regulatory. Commission Box 2517 Washdoton, D. C. 20555 =(1)
Marion, IA 52302 U. S. Nuclear Regulatory Commission Mr. George Toyne, Gen. Mar.
ATTN: Mr. M. Thadani Corn Relt Power Cooperative Phillips Bido.-
Box 508 Washington, D. C. 20555 Humboldt, IA 50548 INPO Records Center:
A
- 1100 Circle 75 Parkway; 1
Suite 1500
.t Atl anta,-- GA' $0339 t
t Ge'un'rtel wfity
- IM. lien,\\ 331
- Cani.sr it.nphis, itmin 5240G
- 319/3984811 g
~
- 2 _
L__