5...

OPERATING DATA REPORT DOCKET NO. 050-0331 9 ATE 03-15-85 COMPLETED BY Kenneth S. Putnam TELEPHONE 319-851-7456 OPERATING STATUS Notes

1. Unit Name Duane Arnold Energy Center
2. Reportino Period February, 1985
3. Licensed Thermal Power. (MWt):

1658

4. Nameplate Rattnq (Gross MWe): __ 565

' 5. Deslan Electrical Rating (Not MWe):

538

6. Maximum Dependable Capacity (Gross MWe):

545

'7. Maximum Dependable Capacity (Net MWe):

515

8. If Changes Occur in Capacity Ratinos (Items Number 3 Through 7) Since the Last Report, Give Reasons:
9. Power Level to Which Restricted, if Any (Net MWe):

Maximum attainable power approximately 795,

10. Reasons For Restrictions, if Any:

Coastdown due to fuel depletion.

This Month Yr-to-Date Cumu lati ve

11. Hours in Reporting Period 672.0 1416.0 88344,0
12. Number of Hours Reactor Was Critical 29.8 773.8 63362.5
13. Reactor Reserve Shutdown Hours 0

0 150.3

14. Hours Generator On-Line 29.1 773.1 61620.8
15. Unit Reserve Shutdown Hours 0

0 0.0

16. Gross Thermal Energy Generated (MWH) 30900 1005468 77465403
17. Gross Electrical Energy Generated (MWH)

'0264 335850 25923204

18. Net Electrical Energy Generated (kWH) 9507 313653 24269804
19. Unit Service Factor 4.3 54.6 69.8
20. Unl t Aval tabl 18 ty Factor 4.3 54.6 69.8
21. Unit Capacity Factor (Using MDC Net) 2.7 43.0 53.3
22. Unit Capaci ty Factor (Using DER Net) 2.6 41.2 51.1
23. Unit Forced Outage Rate 0

0 16.8

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Continued refuel outaae.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

End of May 1985

) M (9/77) 32 g g g

/

a

=

2

7

+.

W.'

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-0331 UNIT Duane Arnold Energy Center DATE 03-15-85 COMPLETED BY Kenneth S. Putnam TELEPHONE 319-851-7456 MONTH February, 1985 DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 373 17 0

~ 2.

12 18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 14 0

30 15 0

31 16 0

INSTRUCTIONS On this format, list the average dally unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole mecewett.

(9/77)

(

1 9

/

S F N

7 1

.o 7

)

S F co h r e c d e u d 0

D l

2 a

e

/

t d

0 e

2

/

8 5

2 e

H GF E DCB A R H;2o e

- - - - - - - - e S

OO A OR R ME a t p dp e e a q s h e meg f iu o or i r u u n i n i,

r a n a l

e t p :

(

t it a l

e m E i s ot i n e 3gsOC x ot r on a n 6

p n r rg n t 4

2 3gCn l

a a Ty c

al t r eF U

i i a R a

9 N

n E vie ol I

)

r en s rl T

r i t u

o n r T r R

S N

r g

e e i

E H

C y s8 P

U

(

c s

(

a E

& t t E O

T x

i x

R D

p L o p

T O

l i n l

W a

c a

M N

e 4

O S

i I

k +* p c,- O.

N n

n n

)

s

)

T A

g yICe H

N C

e 1

nm D

oO3C EgtOb E

F P

xa e

O m

b W

i r

E n

u R

a a

t r

R i

R y

E o

e D

n p E c U

o v a 1

C r e a 9

T' t n 5 8

I t "

5 O

N S

3 4 3 2 M

1

- - - - e gguF W OA M Mt ge t u a a h h t n n o e ou u d r m a a :

(

a l

l OOE OgtL E t x i S O

p cc ge l

r T CD U D a S a e oa n o i c.m mt i c l

n r ep et k

)

a p

l e

.m h e

' N t o t a

n e 0 m N'

e d 3

e.o 5

4 3 b 1

D 1 y 5

u E

0E E f E 9

a x

1 v n ox K

8 n

0 h

6 e t r i C

8 e

5 e

5 h

i 1 n r a

5 n

0 b

)

ty P b u

1 n

A i

r i s

e r

0 t

R S e t e

7 t

n 3

e h p 4

h o

3 1

p ea G 5

l 1

oer -

S r t a I

6

.S d

a t s t n E

m i s P

n e

(

f o t u

e L on r t

r S

E r u

n a

o R

oc a

v u

)

L f t m

r i

i C

c F cD o e

e i e a n n

l n t s t

es a e

e r

( e N

U s

D R

E G

d s

d n

r n

c s

e a

r k

n o V

a n

of r

I e

o i

m S

r t

a M

b i

t n t

c o n

c ei t

g m

e p t C

u n

u p

s a i

u s

n r P

y d

c n

I a

a N

l a

I p

r S

6 O

l v

e d e 1

5 I

u en n r 3

t h

4 T

b s

vi a p 3

E t

7 P

e u

ib 0

e I

r r

s r s n R

o n u u

I d

n 1

0 I

n 5

C d

t et r

5 e

8 S

n h

o sg 0

K E

a a

eI t d n r

5 9

D n

rC l

i A

8 y1 n

i p P f

et b 3 w

d mH o wa

.~

5 o

l o

o 1

d e d

l cf g f c on N

e n r

u o

n oe u

3 t o a

b d

i r

t D 0

eh e

e e r s e l

p t

r l

i al s k t ep e u a l

au cI t ml n

n d p o p r o; a oe a

a e e r eo DUD CT g

g h r d rt e

e c

y B

B S

H sev l

T a

E N

V C

E s

N N

n r

A O

o e

N P

i k

E M

t a

T O

a e

N C

l r

I o

B A

s M

I m

e u

n D

m u

i E

a c

b T

e a

r A

t V

u L

S T

E s

s R

n u

I u

i r

C r

Y a

o P

o T

M T

H T

E F

A S

/

9 O

J A

M s

re M

k E

a T

e l

S r

o Y

B o

S P

mu n

m u

o a

c i

e a

s t

V s

S e

s r

n u

I p

i r

C p

a o

P u

M T

H S

i on E

l T

o A

c D

n O

E.

g,.

Docket No. 055-0331 Unit Duane Arnold Enerov Ctr Date 03-15-85 Completed by Kenneth S. Putnam Telephone 319-851-7456 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE 02/01/85.

At 0000 hour0 days <br />0 hours <br />0 weeks <br />0 months <br />s-the plant was In normal operation at 425 MWe (gross).

02/02/85 AT 0507 hours0.00587 days <br />0.141 hours <br />8.382936e-4 weeks <br />1.929135e-4 months <br /> the main generator was taken off line.

At 0548 hours0.00634 days <br />0.152 hours <br />9.060847e-4 weeks <br />2.08514e-4 months <br /> the reactor was driven su bc ri ti ca l.

At 1845 hours0.0214 days <br />0.513 hours <br />0.00305 weeks <br />7.020225e-4 months <br /> all control rods were fully inserted. After shutdown a spurious Reactor Protection System trip was experienced due to a f ai led LPRM (resulting in APRM 155 trip) at 2351 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.945555e-4 months <br />.

(LER 85-04) 02/03/85 At-0402 hours the reactor vessel head vents were opened placing the plant in cold shutdown.

02/05/85 AT 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br /> the mode switch was placed in the refuel position.

02/07/85' The reactor vessel head bolts were detensioned.

02/09/85 The removal of the reactor vessel head was completed by 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />.

02/10/85 At 0145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br />.the steam dryer was removed from the vessel.

02/15/85 At 2io7 hours, defueling of the reactor vessel commenced.

02/16/85 Personnel erroneously utlllzed an Internally contaminated hose to flush a nonradioactive floor drain.

The effluent from the drain is routed to a holding tank.

Sampling of the tank confirmed no detectable contamination.

02/19/85 The reactor vessel was fully defueled by 0940 hours0.0109 days <br />0.261 hours <br />0.00155 weeks <br />3.5767e-4 months <br />.

(Normal DAEC refueling practice is' full core defuel to spent fuel pool.)

02/22/85 Plannod comprehensive refuellnq outage Inspection of the HPCI 3-tu r bi ne discovered cracked reversing chambers.

This problem has been reported previously in DAEC-unique reports.

(LER 85-07 pendino)

}

02/28/85 At the end of the month the refuel outage continued with the vessel defueled.

I e

F_.

6-fe;

\\,

pf V 3 ep

/

e.

9, r 1,

Docket No. 050-0331

'y i

234 s

Unit Duane Arnold Eneroy Ctr f

"I +,

date 03-15-85 f'

Completed by Kenneth Putnam i

~'$r Telephone 319-851-7456 7

si*

y t,

REFUEllNG I N FOj M A T I'ON s

1 Name of. facility.d+.

V..

'q A.

Duane Arnold Energy Center

/

/

2

. Scheduled date fs'r next refueling shutdown.

A.

Currently in progress.

~

3.

$cheduled.date for restart following refuelino.

A.

May, 1985 4

Will refueling or ~ resumption: of operation ~thereafter require a technical speci fication change or other li censo amendment?

'l

5 Yes.

.a A.

Reload _llconse submittal.

s y f 0b N w. fuel bundles being introduced for B.

A d d i t i on~a l MAPLHGR curves Cycle 8

's C.

Revised Spent Fuel Storage rochnical Spectfications.

g ;,,

D.

Supplemental Rhload License submittal for Cycle 8 Lead Test Fuel Assemblies including MAPLHGR curves.

7i 5.

Scheduled date(s) for submitting proposed licensing action and 1

' supporting Information.

s

.A.

Submitted C.

Submitted a

R.

Submitted D.

Submitted 6

Important IIcensing considerations associated with refueling, e.g.,

new or different-fuel design or supplier, unreviewed design or pe'r f orma n c e analysis methods, si gni fi cant changes In fuel deslon, new operatino procedures.

5 GE Lead' test assembIles whlch Incorporate advanced fuel desions will be loaded for Cycle 8 7

The number of fuel assemblies (a) In the core and (b) In the spent fuel storage pool.

A.

a).

O b) 961

c_

2 s.

s.

  • , w se e-Docket No. 055-0331 l

Unit Duane Arnold Eneroy Ctr Date 03-15-85 Completed by Kenneth S.

Putnam Telephone 319-851-7456 REFUELING INFORMATION (Continued) 8.-

The present IIconsed spent fuel pool storage capacity and the size of any' increase In'llconsed storage capacity that has been requested or is planned, in number of f uel. a s sembl i es.

A.

2050 9

The projected date of the last refueling that can be discharged to the s ('

~

spent fuel pool assuming the present licensed capacity.

A.

1998

>(

~s e

C1

IJ,s y.4.,,

y.

w v

I lowa Electric Light and Ibwer Company March:15, 1985 DAEC-85-0217 Director, Office of Inspection and F'nforcement U. S. Nuclear Regulatory Commission

Washington, D..C.

20555-Attn: ' Document Control Desk

Subject:

Duane Arnold Energy Center Docket.No. 50-331 Op. License DPR-49 February, 1985 Monthly Operating Report

Dear.. Sirs:

'Please find enclosed 12 copies of the Duane Arnold Energy Center Monthly

~

Operating Report for February,1985.

The report has been prepared in accordance with

the.quidelines of Requiatory. Guide 1.16 and distribution has been made in accordance with DAEC Technical Specifications, Appendix A, Section 6.11.1.c and Regulatory Guide 10.1.

Very truly yours, r

Daniel L. Mineck

. Plant-Superintendent - Nuclear Duane Arnold Energy Center DLM/KSP/kp*

- Enclosures

File A-118d, TE-5

. 'cc : : Director, Office of Inspection Mr. Phillip Ross and Enforcement U. S. Nuclear Regulatory Commission U.- S. Nuclear Regulatory Commission Maryland National Bank B1dg.

-Region III

. Washington, D. C.

20555 799 Roosevelt Road Glen Ellyn, -IL - 60137.(1)

NRC Resident Inspector Director, Office of Management.and Mr. Dennis Murdock Program Analysis Central Iowa Power Cooperative

~

U. S. Nuclear Regulatory. Commission Box 2517 Washdoton, D. C. 20555 =(1)

Marion, IA 52302 U. S. Nuclear Regulatory Commission Mr. George Toyne, Gen. Mar.

ATTN: Mr. M. Thadani Corn Relt Power Cooperative Phillips Bido.-

Box 508 Washington, D. C. 20555 Humboldt, IA 50548 INPO Records Center:

A

1100 Circle 75 Parkway; 1

Suite 1500

.t Atl anta,-- GA' $0339 t

t Ge'un'rtel wfity

  • IM. lien,\\ 331
  • Cani.sr it.nphis, itmin 5240G
  • 319/3984811 g

~

2 _

L__