ML20100A124

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1985
ML20100A124
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/28/1985
From: Fay C, Krause C
WISCONSIN ELECTRIC POWER CO.
To:
NRC
References
NUDOCS 8503250338
Download: ML20100A124 (8)


Text

'

OPERATING DATA REPORT DOCKET NO. 50-266 DATE March 6, 1985 COMPLETED BY C. U. KRAUSE TELEPHONE 414 277 2001 OPERATING STAIUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIl 1

. NOTES

2. REPORTING PERIOD: FEBRUARY 1985
3. LICENSED IHERMAL POWER (MUT): 1518.
4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE): 497.
6. MAXIMun DEPENDABLE CAPACITY (GROSS MWE): 509.
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL 10 UHICH RESTRICTED, IF ANY (NET MWE): NOT APFLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 672 1,416 125,496

$l$

12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 101,914.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 629.7
14. HOURS GENERATOR ON LINE 672.0 1,416.0 99,403.5

@ij

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 802.5 gg
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,017,985 2,143,251 135,092,228 n<
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 349,480 735,920 45,381,160
16. NET ELECTRICAL ENERGY GENERATED (MWH) 335,638 706,622 43,172,770 Og
19. UNIT SERVICE FACTOR 100.0 100.G 77.2 GHLoc
20. UNIT AVAILABILITY FACTOR 100.0 100.0 79.8
21. UNIT CAPACITY FACTOR (USING MDC NET) 103.0 102.9 70.4
22. UNIT CAPACITY FACTOR (USING DER NET) 100.5 100.4 69.2
23. UNIT FORCED OUTAGE RATE 0.0 0.0 2.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATIDH OF EACH):

\\-4 Annual refueling outage scheduled to commence April 5, 1985.

M g3

25. IF SHUIDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN b

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

DOCKET NO.

50-266'

~ Point Beach' Unit'1 UNIT NAME DATE March 6, 1985 COMPLETED.BY C. W. Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL' MONTH February, 1985 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

498 11 497 21 501 2

497 12 496 22 502 3

498 13 499 23 502 4

499 14 499 24 502 5

498 15 500 25 502 6

498 16 500 26 501 7

497 17 500 27 502 8

496 18 501 28 502 9

497 19 500 29 501 30 10 500 20 31 EQR-28a (01-79)

3B l

I'll 0D 1-2 N

.o 78 8B

)

I D

SF a

te SF co hr ec Nae ~

de ud l

ed Q$eoSC

$ou2 GFEDCBAR M$eoa" I

I ea OOAORRMEs tp dp e e a q o h e m e g fiu n gsoc H

U R

N e r ir u u n i:

m. ov5t E

I S

ranaletp p

P T

titalem Sg *eetok O

isotine R

S

(

eotronan T

H xnr rgnt L

U raaTy c

i M

T p

lltr eF c

O D

a iaR a

Re N

O iEvie oi en T

W nrens rl ps H

N r

it u

oe S

)

o nr Tr re r

gi ee t

A c

s E

F N

&t t(

Nv e

D

(

e i

e oe b

x Lo x

.n r

P p

in p

t u

O l

c l

a W

a e

a r

E i

n i

y R

fcoo'.'

R av!

n s

n e

)

)

1 E

E 9

D x

8 U

a 5

C m

T gIoCE#

I n

OtG O

3 NS 432lM e

t C

OAMMh a

tuaao Tu htnnd os eouu:

e rmaa P

all ra C

( t en TO eiS vd EM D

xcc e

LP UO p

r nC EL NC lSa to PE IK acm r

T TE

~

I I

ir Rr OE T

na ee NDDN m

cc E

AAN

)

ut BTMO 5

4 ri YEE.

rv SE Sate ee

(

ox Nhtix n

4 C M P 5

a o 0

1 uh U e io h cA 4

r i ri Reoni ec

/ W c n 2

cb Etnsb t

h t 6

2 ei Gs i

i 7

6 t

oft o

7 K 6 B 0ffo n

- r e

I 1o rG 2 a a

6rD 0 u 1 c 1

API 0 s 9 h Ltrn S

)

1 e 8

a Eaes 5 U m

R pt n

a Ear i

Fnru t

it c

1r 1

@y 1

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.:

50-266 Unit Name:

Point Beach Unit 1-Date:

March 6, 1985 Completed By:

C. W. Krause Telephone:

414/277-2001 Unit'l operated at approximately 499 MWe net throughout the period with no load reductions.

Primary-to-secondary steam generator leakage-remains stable at less than 10 gallons per day.

On February 4,.1985,.a seven-day Limiting Condition of Operation was initiated when a control room cleanup fan tripped prematurely during Technical Specification surveillance tests.

- The fan was repaired and then returned to service on February 8, 1985.

Other maintenance performed during the period included repairs to the D406 cable spreading room fire detection panel.

t

OPERATING DATA REPORT DOCKET NO. 50-301 DATE March 6, 1985 COMPLETED BY C. W. KRAUSE TELEPHONE. 414 277 2001 OPERATING STATUS

1. UNIT tlAME: POINT BEACH NUCLEAR PLANT UNIT 2

. NOTES

2. REPORTING PERIOD: FEBRUARY 1785
3. LICENSED THERNAL POWER (MWT): 1518.
4. NAMEPLATE RATING (GROSS MUE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE): 497.
6. HAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.
8. IF Cs# AGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

h0T APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED,-IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 672 1,416 110,281
12. NunBER OF HOURb REACTOR WAS CRITICAL 672.0 1.416.0 97,388.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 207.1
14. HOURS GENERATOR ON LINE 672.0 1,416.0 95,725.4 l
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 198.1
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,015,875 2,118,985 133,871,957
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 345,750 720,460 45,360,600 l
18. NET ELECTRICAL ENERGY GENERATED (MWH) 331,154

.689,850 43,201,255

19. UNIT SERVICE FACTOR 100.0 100.0 86.8
20. UNIT AVAILABILITY FACTOR 100.0 100.0 87.0
21. UNIT CAPACITY FACTOR (USING HDC NET) 101.6 100.4 79.8
22. UNIT CAPACITY FACTOR (USING DER NET) 99.2 98.0 78.8
23. UNIT FORCED OUTAGE RATE 0.0 0.0 1.3
24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE l

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN 1

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 1

r. _. _.

DOCKET NO.

50-301 UNIT NAME Point Beach Unit 2 DATE March 6, 1985 COMPLETED.BY C. W.'Krause TELEPHONE-414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH February, 1985 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY I

POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

492 11-492 21 495 2

494 12 492*

22 495 3

494 13 493 23 495 4

495 14 492 24 495 5

495 15 492 25 494 6

496 16 493 26 494 7

492 17 494 27 494 8

493 18 493 28 499 9

492 19 493 29 10 470 20 492 30 31 EQR-28a (01-79)

f40D 1-2 N

.o 78 8B

)

D SF a

te SF co hr ec Ege-de ud e

led Q:3geac

~Dgu2 Megoc" GFEDCBAR 1

1- - - - - - -

ea OOAORRMEs tp dp e e a q o h e m e g fiu n Ceejo" M

U R

N e r ir u u n i:

)cU. geSw c E

I r a n a le tp o

P T

titalem Ao>C geto O

isotine R

S

(

eotronan T

H xnr rgnt L

U roaaTy c

i M

T lltr eF c

O D

a iaR a

Re N

O iEvie oi en T

W nrens rl ps H

N r

it u

oe S

)

o nr Tr re r

gi ee t

A c

s E

F N

&t t(

Nv e

D

(

b e

i e

.o e x

Lo x

n r

P p

in p

t u

O l

c l

a W

a e

a r

E y

i n

i R

u syvP n

s n

)

e

)

R o'e 1

E 9

E D

8 x

U 5

a C

m T

0oayae9 I

n o

e O

3 NS 432lM e

t C

OAMMh a

tuaao Tu htnnd os eouu:

e rmaa P

all ra C

t en TO

(

eiS vd EM D

xcc e

LP UO p

r nC EL NC lSa to PE IK acm r

HT TE ir Rr OE T

na ee NDDN m

cc E

AAN

)

ut BTMO 5

ri YEE.

rv Sate ee SE

(

ox Nhtix n

.C M P 5

4 1

a o 0

uh Ueioh cA 4

r i

ri Reoni ec

/ W c n 3

cb Etnsb t

h t

0 2

ei Gs i

i 7

1 t

oft o

7 K 6 B

0ffo n

- r e

I 1o rG 2 a a

6rD 0 u 1 c 1

API 0 s 9 h Ltrn S

)

1 e

8 a

Eaes 5

U m

R pt n

a Ear i

Fnru t

it c

] r 2

@y

P.

}-

NARRATIVE

SUMMARY

OF OPERATING. EXPERIENCE Docket No.:

50-301

' Unit Name:

Point Beach Unit 2 Date:

March 6, 1985-Completed By:

C. W. Krause Telephone:

414/277-2001 Unit 2 operated at approximately 493 MWe net throughout the period with no significant load reductions.

Primary-to-secondary steam-generator leakage remains stable at less than 10 gallons per day.

Maintenance work during the period included repairs to the charging pump drain system and minor work to the Unit 2 "A"

residual heat. removal pump for investigation of oil con-sumption.

i

e e

l Wlsconsin Electnc eomcourm 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 March 11, 1985 Director of Nuclear Regulatory Operations U. S. NUCLEAR REGULATORY COMMISSION Washington, D.

C.

20555 Gentle:nen:

MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, fcr the calendar month of February 1985.

Very truly yours, dd4j Vice President-Nuclear Power C. W. Fay Attachments Copies to J.

G. Keppler - NRC, Region III NRC Resident Inspector R.

S. Cullen - PSCW M

f f

ib

.-