OPERATING DATA REPORT DOCKET NO. 50-266 DATE March 6, 1985 COMPLETED BY C. U. KRAUSE TELEPHONE 414 277 2001 OPERATING STAIUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIl 1
. NOTES
- 2. REPORTING PERIOD: FEBRUARY 1985
- 3. LICENSED IHERMAL POWER (MUT): 1518.
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.
- 6. MAXIMun DEPENDABLE CAPACITY (GROSS MWE): 509.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL 10 UHICH RESTRICTED, IF ANY (NET MWE): NOT APFLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 672 1,416 125,496
$l$
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 101,914.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 629.7
- 14. HOURS GENERATOR ON LINE 672.0 1,416.0 99,403.5
@ij
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 802.5 gg
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,017,985 2,143,251 135,092,228 n<
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 349,480 735,920 45,381,160
- 16. NET ELECTRICAL ENERGY GENERATED (MWH) 335,638 706,622 43,172,770 Og
- 19. UNIT SERVICE FACTOR 100.0 100.G 77.2 GHLoc
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 79.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.0 102.9 70.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 100.5 100.4 69.2
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 2.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATIDH OF EACH):
\\-4 Annual refueling outage scheduled to commence April 5, 1985.
M g3
- 25. IF SHUIDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN b
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
DOCKET NO.
50-266'
~ Point Beach' Unit'1 UNIT NAME DATE March 6, 1985 COMPLETED.BY C. W. Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL' MONTH February, 1985 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
498 11 497 21 501 2
497 12 496 22 502 3
498 13 499 23 502 4
499 14 499 24 502 5
498 15 500 25 502 6
498 16 500 26 501 7
497 17 500 27 502 8
496 18 501 28 502 9
497 19 500 29 501 30 10 500 20 31 EQR-28a (01-79)
3B l
I'll 0D 1-2 N
.o 78 8B
)
I D
SF a
te SF co hr ec Nae ~
de ud l
ed Q$eoSC
$ou2 GFEDCBAR M$eoa" I
I ea OOAORRMEs tp dp e e a q o h e m e g fiu n gsoc H
U R
N e r ir u u n i:
- m. ov5t E
I S
ranaletp p
P T
titalem Sg *eetok O
isotine R
S
(
eotronan T
H xnr rgnt L
U raaTy c
i M
T p
lltr eF c
O D
a iaR a
Re N
O iEvie oi en T
W nrens rl ps H
N r
it u
oe S
)
o nr Tr re r
gi ee t
A c
s E
F N
&t t(
Nv e
D
(
e i
e oe b
x Lo x
.n r
P p
in p
t u
O l
c l
a W
a e
a r
E i
n i
y R
fcoo'.'
R av!
n s
n e
)
)
1 E
E 9
D x
8 U
a 5
C m
T gIoCE#
I n
OtG O
3 NS 432lM e
t C
OAMMh a
tuaao Tu htnnd os eouu:
e rmaa P
all ra C
( t en TO eiS vd EM D
xcc e
LP UO p
r nC EL NC lSa to PE IK acm r
T TE
~
I I
ir Rr OE T
na ee NDDN m
cc E
AAN
)
ut BTMO 5
4 ri YEE.
rv SE Sate ee
(
ox Nhtix n
4 C M P 5
a o 0
1 uh U e io h cA 4
r i ri Reoni ec
/ W c n 2
cb Etnsb t
h t 6
2 ei Gs i
i 7
6 t
oft o
7 K 6 B 0ffo n
- r e
I 1o rG 2 a a
6rD 0 u 1 c 1
API 0 s 9 h Ltrn S
)
1 e 8
a Eaes 5 U m
R pt n
a Ear i
Fnru t
it c
1r 1
@y 1
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.:
50-266 Unit Name:
Point Beach Unit 1-Date:
March 6, 1985 Completed By:
C. W. Krause Telephone:
414/277-2001 Unit'l operated at approximately 499 MWe net throughout the period with no load reductions.
Primary-to-secondary steam generator leakage-remains stable at less than 10 gallons per day.
On February 4,.1985,.a seven-day Limiting Condition of Operation was initiated when a control room cleanup fan tripped prematurely during Technical Specification surveillance tests.
- The fan was repaired and then returned to service on February 8, 1985.
Other maintenance performed during the period included repairs to the D406 cable spreading room fire detection panel.
t
OPERATING DATA REPORT DOCKET NO. 50-301 DATE March 6, 1985 COMPLETED BY C. W. KRAUSE TELEPHONE. 414 277 2001 OPERATING STATUS
- 1. UNIT tlAME: POINT BEACH NUCLEAR PLANT UNIT 2
. NOTES
- 2. REPORTING PERIOD: FEBRUARY 1785
- 3. LICENSED THERNAL POWER (MWT): 1518.
- 4. NAMEPLATE RATING (GROSS MUE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.
- 6. HAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.
- 8. IF Cs# AGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
h0T APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED,-IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 672 1,416 110,281
- 12. NunBER OF HOURb REACTOR WAS CRITICAL 672.0 1.416.0 97,388.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 207.1
- 14. HOURS GENERATOR ON LINE 672.0 1,416.0 95,725.4 l
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 198.1
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,015,875 2,118,985 133,871,957
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 345,750 720,460 45,360,600 l
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 331,154
.689,850 43,201,255
- 19. UNIT SERVICE FACTOR 100.0 100.0 86.8
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 87.0
- 21. UNIT CAPACITY FACTOR (USING HDC NET) 101.6 100.4 79.8
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.2 98.0 78.8
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 1.3
- 24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE l
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN 1
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 1
r. _. _.
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE March 6, 1985 COMPLETED.BY C. W.'Krause TELEPHONE-414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH February, 1985 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY I
POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
492 11-492 21 495 2
494 12 492*
22 495 3
494 13 493 23 495 4
495 14 492 24 495 5
495 15 492 25 494 6
496 16 493 26 494 7
492 17 494 27 494 8
493 18 493 28 499 9
492 19 493 29 10 470 20 492 30 31 EQR-28a (01-79)
f40D 1-2 N
.o 78 8B
)
D SF a
te SF co hr ec Ege-de ud e
led Q:3geac
~Dgu2 Megoc" GFEDCBAR 1
1- - - - - - -
ea OOAORRMEs tp dp e e a q o h e m e g fiu n Ceejo" M
U R
N e r ir u u n i:
)cU. geSw c E
I r a n a le tp o
P T
titalem Ao>C geto O
isotine R
S
(
eotronan T
H xnr rgnt L
U roaaTy c
i M
T lltr eF c
O D
a iaR a
Re N
O iEvie oi en T
W nrens rl ps H
N r
it u
oe S
)
o nr Tr re r
gi ee t
A c
s E
F N
&t t(
Nv e
D
(
b e
i e
.o e x
Lo x
n r
P p
in p
t u
O l
c l
a W
a e
a r
E y
i n
i R
u syvP n
s n
)
e
)
R o'e 1
E 9
E D
8 x
U 5
a C
m T
0oayae9 I
n o
e O
3 NS 432lM e
t C
OAMMh a
tuaao Tu htnnd os eouu:
e rmaa P
all ra C
t en TO
(
eiS vd EM D
xcc e
LP UO p
r nC EL NC lSa to PE IK acm r
na ee NDDN m
cc E
AAN
)
ut BTMO 5
ri YEE.
rv Sate ee SE
(
ox Nhtix n
.C M P 5
4 1
a o 0
uh Ueioh cA 4
r i
ri Reoni ec
/ W c n 3
cb Etnsb t
h t
0 2
ei Gs i
i 7
1 t
oft o
7 K 6 B
0ffo n
- r e
I 1o rG 2 a a
6rD 0 u 1 c 1
API 0 s 9 h Ltrn S
)
1 e
8 a
Eaes 5
U m
R pt n
a Ear i
Fnru t
it c
] r 2
@y
P.
}-
NARRATIVE
SUMMARY
OF OPERATING. EXPERIENCE Docket No.:
50-301
' Unit Name:
Point Beach Unit 2 Date:
March 6, 1985-Completed By:
C. W. Krause Telephone:
414/277-2001 Unit 2 operated at approximately 493 MWe net throughout the period with no significant load reductions.
Primary-to-secondary steam-generator leakage remains stable at less than 10 gallons per day.
Maintenance work during the period included repairs to the charging pump drain system and minor work to the Unit 2 "A"
residual heat. removal pump for investigation of oil con-sumption.
i
e e
l Wlsconsin Electnc eomcourm 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 March 11, 1985 Director of Nuclear Regulatory Operations U. S. NUCLEAR REGULATORY COMMISSION Washington, D.
C.
20555 Gentle:nen:
MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, fcr the calendar month of February 1985.
Very truly yours, dd4j Vice President-Nuclear Power C. W. Fay Attachments Copies to J.
G. Keppler - NRC, Region III NRC Resident Inspector R.
S. Cullen - PSCW M
f f
ib
.-