Text
.
'/f L h-Interoffice Correspondence DO@
Georgia Power A D
95 0:120 P4 :42 gr ecCRETARY DATE:
June 21, 1990 gy SERVICE C
Bk/SCit RE:
FAVA Microfiltration System Log:
NOH-01230 FROM:
'R.
L.
LeGrand TO:
G.
Bockhold, Jr.
The. prerequisites stated in your letter, Log:
NOV-00424 of March 15, _1990, for the operation of the FAVA Microfiltration System have i
.been verified.
The prerequisites were satisfied as follows:
1.
FAVA system operating procedure T-0PER-90-1, Revision 2,
Step 2.1.5 requires "An operator should be in attendance at the system controls for the entire duration when the sytem is operating."
2.
All hoses going to and from the system were checked as properly installed by Temporary Modification #A90-001 and hydrostatically tested to the requirements of Regulatory Guide 1.143 by MWO
- A9000081.
Both the installation checks and the hydrostatic test were satisfactory.
3.
FAVA system operating procedure T-OPER-90-1, Revision 2,
Step 3.5 requires, as a prerequisite, "The top cover is securely fastened to the FAVA Filter Skid."
In addition to the above requirements, the demineralizer operating procedure (13290-c) which is used in conjunction with the FAVA Oystem operating procedure requires "The Alternate Radwaste Building (ARB) roll up door must remain closed while process equipment is operating unless the ARB is continuously manned and a Continuous Air Monitor is in operation."
l Please contact me at extension 3380 if you require further information regarding FAVA system installation or operating status.
REL/bh xc:
NORMS NUCLEAR REGULATORY COM' MISSION EXHIBITNO. [' b 1 Docket No. 50-424/425-OLA-3 in the matter of Georale Power Co. et al., gatie Units 1 & 2 2210202 950915 OMW WM O RsW W_%