ML20099L303
| ML20099L303 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/28/1985 |
| From: | Mcdonald R ALABAMA POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20099L307 | List: |
| References | |
| NUDOCS 8503200558 | |
| Download: ML20099L303 (2) | |
Text
__
M;lling Addrsss Alabama Power Company
[
600 North 18th Street fy Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald j
Senior Vice President Flintridge Building
/\\labama POWCf
- es; em m e, a Februa ry 28, 1985 1
Docket Nos. 50-348 50-364 Dr. J.- Nelson Grace Regional Administrator U. S. Nuclear Regulatory Comission Suite 2900 101 Marietta~ Street, N.W.
Atlanta, GA 30323 RE:
Joseph M. Farley Nuclear Plant Radioactive Effluent Release Report
Dear Dr. ' Grace:
The Joseph M. Farley Nuclear Plant Semi-Annual Radioactive Effluent i
Release Report for the period of July 1,1984 through December 31, 1984, is herewith submitted in accordance with the Unit 1 and Unit 2 Technical Specifiations, Section 6.9.1.8.
Included with this submittal as required by Technical Specification 6.13.2 is documentation of changes made to the Farley Nuclear Plant Process Control Program. Also enclosed l
1s a revised 2nd quarter joint frequency distribution table for the effluent report previously submitted for the period of January 1,1984 through June 30, 1984.
l
-If you have any questions, please advise.
Yours very t ly, I
i R. P. Mcdonald
. RPM /KWM: sam Enclosures-(2) xc: Director Office of Nuclear Reactor Regulation Di rector
-Office of Inspection and Enforcement
.Mr. L. B. Long Mr. G. F. Trowbridge
/
Mr. W.- H. Bradford Mr. E. A. Reeves ~
- 1 1
8503200558-850228 PDR ADOCK 05000348 R
pm f ((fQ$
x
APPENDIX A SEMI-ANNUAL EFFLUENT RELEASE REPORT July 1,1984 through December 31, 1984 1
,