._
GPC EXHIBIT II- #1f
-/[ 3 BOCKHOLD EX. R Interoffice correspondence D
D GeorgiaPower A
'95 001 20 P 3 :26 DATE: March 15, 1990 0FFICE Or TECPE TARY DOCKEl!NG a 0 RVICE RE:
FAVA Microfiltration System Br< A NC H Log: NOV-00424 FROM: George Bockhold Jr.
TO:
W. F. Kitchens A. L. Mosbaugh Today. I received concurrence from the NRC (Ken Brockman) via telecon to place the FAYA system in operation.
The hold tag isolating the system may be released after Operations verifies the following:
1.
Procedures for operating FAVA require an operator to be in attendance for the entire duration of system operation.
2.
All hoses going to and from the system have been checked and meet requirements of Regulatory Guide 1.143.
3.
The cover over the unit is securely fastened when FAVA is in operation to ensure that if a spraying leak develops, it will be contained in the concrete vault.
The NRC asked us to consider the design of the ARB walls and whether or not a design modification should be made to reduce the potential of wall leakage in the event that a hose leak developed and sprayed the walls't Engineering is assigned this action item and j
a REA to Corporate may be appropriate.
N GB/gww 1
xc:
C. K. McCoy 9
NORMS g
ut M 9512200275 950907 e
PDR ADOCK 05000424 o
PDR NUCLEAR REGULATORY COMMISSION Docket No. 50-424!425-OtA-3 EXHIBITNO. D (98 In the matter of Georata Power Co. et af, Vontfe Units 1 & 2 O staff %plicant O intervenor o other O identified graeceived O Rejected Reporter fD Date i ['? /d Witness b*4 8*dk*ll
,