Part 21 Rept Re Slippage of Raceway Support Bolted Strut Fittings.Retrofit of Fittings Will Be Completed Prior to Fuel Load for Seabrook Station.Identified Tray Support Mods Will Be Incorporated Upon Resumption of WPPSS-1 Const
ML20099L219
Person / Time
Site: Seabrook, 05000000, Washington Public Power Supply System
Issue date: 11/26/1984
From: Kreider H
UNITED ENGINEERS & CONSTRUCTORS, INC.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-84-539-000 PT21-84-539, PT21-84-539-000, NUDOCS 8412010052
Download: ML20099L219 (3)


Text

.,

U; 30 South 17th Street&-constructc= linc. DENVER EcwEtoN Post Office Box 8223 November 26, 1984 "" fo','ti,.

Philadelphia, PA 19101 ..ttsy ,oRos Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

SUBJECT:

10 CFR 21 Report of a Potential Defect Related to Public Service Company of New Hampshire - Seabrook Station and Supply System - WNP 1 On August 7, 1981, UE6C submitted a report of a potential de-feet pertaining to slippage of raceway support bolted strut fittings.

UE&C has since submitted four status reports, the last on December 6, 1983. In those reports, specific actions and programs adopted for the satisf actory resolution of the problem were presented. This report summarizes the progress made toward the completion of those programs.

For the WNP Unit 1, the review activities for the cable tray supports have been completed. The review confirmed that only a limited number of modifications were required because of design conservatisms.

Due to the construction deferment, modifications are postponed.

Design review activities for Seabrook Station have been-completed. The review indicates that retrofits are required. The specification of these retrofit activities and the actual retrofit will be completed prior to fuel load.

In summary, all design activities relating to the original fitting deficiency are completed and programs to implement any necessary modifications formally identified and all progress monitored. We assume that any follow-up activities will be monitored by your regional inspec-tors. Therefore, we do not plan to issue any future progress reports on the subject deficiency. If you have any questions, please do not hesitate to confact us.

Very truly yours, 8412020052 841126 DR ADOCK 05000443 PDR

. G. Kreider Vice President - Power cc: Regional Director USNRC - Region 1 Regional Director USNRC - Region 5 ((N TELEPHONE 215 422-3000 Twx 7104701257 TELEX 83 4203

'll l TELECOPIER 215 422 3049

/ f f A Heyth.en Company ]

1

- q.

l r

ATTACHHENT I

. BOLTED STRUT FITTINGS SLIPPAGE PROBLEH A. ' ACTIONS TAKEN DECEMBER 6, 1983 TO DATE l' . .Seabrook Station

a. Engineering design calculations, utilizing the documented -

test results, to determine the required retrofits are

- complete for both the cable tray- and conduit support activities. To minimize the number of changes required, the recommended modifications are being reviewed against actual field conditions.- The resulting calculations and drawing release is continuing, but at a reduced rate due to the project slowdown..

b. Retrofit of cable tray support fittings with insufficient capacity was begun but was curtailed in April,1984.
2. WNP-1 UNIT
a. Structural evaluations which identified necessary modifi-cations for the cable tray supports are complete. lRie -

results of these evaluations are documented in a report entitled " Seismic Analysis and Qualification of Seismic Category I Cable Tray Systems" (Report No.

6702-C-EE-3E-01-F, Rev. 1; March 30, 1984).

b. Structural adequacy has been confirmed for. the conduit supports. No additional action'is required.

h f

L ATTACHMENT 1 (Continued) Page 2 B. REMAINING ACTION ITEMS

1. Seabrook Station Completion of the retrofit calculations and drawings identify-ing the required cable tray and conduit support fitting is continuing. Retrofit of the fittings will be completed prior to fuel load.
2. WNP-1 UNIT Incorporate the identified tray support modifications upon resumption of plant construction.

,....