Responds to IE Bulletin 78-02 Re Terminal Block qualification.Ninety-five Percent of balance-of-plant Equipment Will Be Completed by Sept 1985 & NSSS Equipment Data Will Be Available by 850430
ML20099L195
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/15/1984
From: Martin T
Public Service Enterprise Group
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-78-02, IEB-78-2, NUDOCS 8412010046
Download: ML20099L195 (2)


Text

. v. &

Public Service Electric and Gas Cornpany Thomas J. Martin 80 Park Plaza, Newark, NJ 07101 201-430-8316 Mailing Address: P.O. Box 570, Newark, NJ 07101 Vice President Engineering and Construction November 15, 1984 Dr. Thomas E.

Murley, Administrator U.S.

Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Dr. Murley:

NRC IE BULLETIN 78-02 TERMINAL BLOCK OUALIFICATION HOPE CREEK GENERATING STATION Our March 27, 1978, reply to Bulletin 78-02 stated that unprotected terminal blocks will not be used in tha systems which must function in a post-accident environment.

It was noted in Region I Inspection Report 50-354/82-01 that events subsequent to the Inspector's last review of this Bulletin required that panels inside containment be vented to prevent collapse in a post-accident environment, thus exposing the terminal blocks.

PSE&G has an on-going Equipment Qualification Program which meets the requirements of 10CFR50.49 and NUREG 0588.

Terminal blocks for Hope Creek are subject to qualification in accordance with this program.

For terminal blocks located in vented panels or other vented enclosures, the environment inside the enclosure will be the basis for qualification.

The Equipment Oualification Program is expected to be completed by September 1985 with 95% of the balance of plant equipment and all of the NSSS equipment data available by April 30, 1985.

Should additional information be required prior to completion of the Equipment Oualification Program, we will be pleased to discuss it with you.

Very truly yours, 6

J.

Martin sp G

/5 //

~- - "

Dr. Thomas E.

Murley 2

C Office of Inspection & Enforcement Division of Reactor Construction Inspection Washington, D.C.

20555 NRC Resident Inspector - Hope Creek P.O.

Box 241 Hancocks Bridge,.New Jersey 08038 I