ML20099H950

From kanterella
Jump to navigation Jump to search
Forwards Semiannual fitness-for-duty Rept for Jan-June 1992
ML20099H950
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/11/1992
From: Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2079, NUDOCS 9208200008
Download: ML20099H950 (5)


Text

_ __

c CENTERDOR ENERGY Donald C. Shelton 300 Madtson Avenue Vice President Nuclear Toledo, OH 436520)01 D e Besse (419)249-2300 Docket Number 50-346 Ideense Number NFF -3 Serial Number 2079 August 11, 1992 United States Nuclear Regulatory Commission Doc'atNnt Control Desk Vesnwg on, D. C.

20555

Subject:

femiannual Fitness-For-Duty Report January - June 1992 Gentlemen:

Pursuant to 10 CFR 26.71(d) " Record Keeping Requirements", Toledo Edison hereby submits its Se_miannual Fitness-For-Duty (FFD) report for the period of January - June 1992 for Davis-Besse Nuclear Power Station, Unit 1. provides Toledo Edison's FFD Program Performance Data. The data

. form is an industry standard developed by Nuclear Management and Resources Council to provide the information required by 10 CFR 26.71(d). Attachment 2 provides a summary of management actions taken by Toledo Edison based on positive FFD results, presumptive positives, and a list of FFD event reports

-submitted by Toledo Edison.

If you have any questions, please contact Mr. R. V. Schrauder, Manager -

Nuclear Licensing, at (419) 249-2366.

c Very tr

yours, j

,Q GAB /dle attachments cc:

A. B. Davis, Regional Administrator, NRC Region III J. B. Hopkins, NRC/NRR DB-1 Senior Project Manager V. Ievis, NRC Region III, DB-1 Senior Resident Inspector Utility Radiological Safety Board

' ^ 30B300000 920811

~

~

9 PDR ADOCK 05000346 R

PDR-g/

f Operatng Companies

(

\\\\

Cleveland fiecmc illuminonng Toledo Ed: son

Docket Number 50-346 License Number NPF-3 Serial Number 2079 Toledo Edison's Fitness-For-Duty Report January - June 1992

Docket Number 50-346 License Number NPF-3

' Serial Number 2079 Pase 1 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 Toledo Edison June 30, 1992 4

Covery 8 Wars Enone Davis-Besse Locason Robert W. Schrauder (419) 249-2366 Contact Narne Prene (mouos erse cose)

Cutoff s: ScreerVConfirmaton (rg'ml)

O Appendix A to 10CFR 26 Marijuana 50/15 Amphetamines 1000/500

/

Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300 300 Alcohol (% BAC) 0.04

/

/

Lorn-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personal Average Number witt Unescorted Access I

1222

-N/A 179 Categories Tested Positive Tested Positive Tested Positive Pre 4 x ess 42 0

33 0

o Post accident 0

0 0

0 cu!

Observed behavior 3

o o

o Random 780 0

31 O

Follow-up 13 0

0 0

Other 13 0

0 0

Total 851 0

64 0

REv.1/92

Docket 11 umber 50-346 1.leense Nurnber 14PT-3 Serial Number 2079 At t ac htne nt 1 Page !t 3

44 i

E N

K L

3l,

o e

o o

o o

o o

a a

j g

o o

o o

$, Ll 0

o o

o uh e

e o

o p

i G

l O

O O

O i

0 o

o o

o E

a B

=-

k b

8 o

E E

l 4

e 3

3 to

_ - - \\s m

a i

=

n I

Decket Numbar 50-346 License Number NPF-3

_, Serial Number 2079

' Attachment 2 Page 1 TOLEDO EISON'S MANAGEMENT ACTIONS RELATING TO FITNESS-FOR-DUTY Toledo Edi Contractor Personnti Personnel Referred to EAP O

O Hanagement Sanetions 0

0 J

Toledo Edison does not perform onsite initial drug-screening test.

Therefore,

-no management actions on unconfirmed presumptive positive result from drug testing..

TOLEDO EDISON'S FITNESS-FOR-DUTY REPORTS

. Voluntary Reports-Investigation of 11oatth -and Iluman Services certified Laboratory (Serial 1-)88, dated June 25, 1992) 4 d

.. - ~ ~,..

...m.

.,_.,,-._,..._,,.,......_,_.,,.,.,,.m.

, -.,...,,..