ML20099H888
| ML20099H888 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/06/1985 |
| From: | Thompson H Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20099H890 | List: |
| References | |
| NUDOCS 8503190522 | |
| Download: ML20099H888 (4) | |
Text
'
'o; UNITED STATES
[g g
NUCLEAR REGULATORY COMMISSION E
WASHINGTON, D. C. 20555 s
E
%,...../
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MlfNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-424 V0GTLE ELECTRIC GENERATING PLANT, UNIT 1 AMENDMENT TO CONSTRUCTION PERMIT Amendment No. 5 Construction Pernit No. CPPR-108 1.
The Nuclear Reculatory Commission f he Commission) has found that:
t A.
The application for amendment to the Vogtle Electric Generating Plant, Unit 1, Construction Permit No. CPPR-108 filed by the Georgia Power Company acting for itself, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia, dated January 11, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations as set forth in 10 CFR Chapter I; B.
The issuance of this amendment will not he inimical to the common defense and security or to the health and safety of the public; and C.
The issuance of this amendment is in accordance with 10 CFR Part 51. of the Commission's regulations, and all applicable reouirements have been sa ti s fie~d.
2.
Accordingly, Construction Permit No. CPPR-108 is changed as follows:
A.
Change paragraph 3 to read:
3.
This parmit shall be deemed to contain and be subject to the con-ditions specified in Sections 50.54 and 50.55, of said reculations; is subfect to all apolicable provisions of the Act, and rules, regulations, and orders of the Commission now or hereafter in effect, as modified by duly authorized exemptions; and is subiect to the conditions specified or incorporated below:
B.
Change paragraph 3.C. to read:
C.
This construction permit authorizes tha applicant to construct tha facility described in the application (as modified by duly authorized 8503190522 850306 PDR ADOCK 05000424 A
-2
. exemptions) and in the hearing record, in accordance with the principal architectural and engineering criteria and environmental protection commitments set forth therein.
3.. This amendment is effective as of the date.of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Tu2 '
ll2Tt' L Hugh L. Th fnpson, Jr., Director
$f Division of Licensing S
Office of Nuclear Reactor Regulation 4
Date of Issuance: March 6, 1985 k
p now
[,cf
^
o UNITED STATES g
g NUCLEAR REGULATORY COMMISSION D.
E WASHINGTON, D. C. 20555 1;
5
,o GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-4?5 V0GTLE ELECTRIC GENERATING PLANT, UNIT 2 AMENDMENT TO CONSTRUCTION PERMIT Amendment No. 5 Construction Permit No. CPPR-109 1.
The Nuclear Reculatory Comission (the Commission) has found that:
A.
The application for amendment to the Vogtle Electric Generating Plant, Unit 2, Constructinn Permit No. CPPR-109 filed by the Georgia Power Company acting for itself, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia, dated January 11, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations as set forth in 10 CFR Chapter I; B.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and C.
The issuanca of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied.
2.
Accordingly, Construction Permit No. CPPR-109 is changed as follows:
A.
Change paragraph 3 to read:
3.
This parmit shall be deemed to contain and be subject to the con-ditions specified in Sections 50.54 and 50.55, of said regulations; is subject to all applicable provisions of the Act, and rules, regulations, and orders of the Commission now or hereafter in effect.
as modified by duly authorized exemptions; and is subject to the conditions specified or incorporated below:
B.
Change paragraph 3.C. to read:
C.
This construction permit authorizes the applicant to construct the facility described in the application (as modified by duly authorized
_2 exemptions) and_in the hearing record, in accordance with the principal architectural and engineering criteria and environmental protection commitments set forth therein.
- 3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION kp QL L L.
.s Hugh L.
hompso, Jr., Director g Division of Licensing q
g Office of Nuclear Reactor Regulation i
Date of Issuance:
March 6, 1985 P
4 4
I' i
I 4
9