ML20099H165

From kanterella
Jump to navigation Jump to search
Corrected Amend 182 to License DPR-59,changing Page 78 to Account for Administrative Changes Made in Amend 181
ML20099H165
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/11/1992
From: Mccabe B
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20099H168 List:
References
NUDOCS 9208180163
Download: ML20099H165 (1)


Text

_ - _.

O '

JAFNPP mma TABLE 42-1 m

MINIMUM TEST AND CALIBRATION FREQUENCY FOR PCIS instrument Channel (8)-

Instrument Functional Test Calibration Frequency Instrument Check (4)

O$

co ygm

1) Reactor High Pressure (1)

Once/3 months None (Shutdown Cooling Permissive) eu-

  • d
2) Reactor Low-Low-Low Water Leveb (1)(5)

(15)

Once/ day

3) Main Steam High Temp.

(1)(5)-

(15)

Once/ day

4) Main Steam High Flow (1)(5)

(15)

Once/ day

5) Main Steam Low Pressure (1)(5)

(15)

Once/ day

6) Reactor Water Cleanup High Temp.

(1)

Once/3 months None

7) Condenser Low Vacuum (1)(5)

(15)

Once/ day Logic System Functional Test (7) (9)

Frequency 1)

Main Steam Une isolation valves Once/6 months Main Steam Une Drain Va!ves Reactor Water Samp!o Valves 2)

RHR-Isolation Valve Control Once/6 months J

Shutdown Cooling Valves 3)

Reactor Water Cleanup Isolation Once/6 months 4)

Drywellisolation Valves Once/6 months TIP Withdrawal Atmospheric ControlValves 5)

Standby Gas Treatment System Once/6 months Reactor Building isolation NOTE-See notes following Table 42-5.

i Amendment No. 7/, p!f,1p6,J8T,182 78

. -