ML20099H165
| ML20099H165 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 08/11/1992 |
| From: | Mccabe B Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20099H168 | List: |
| References | |
| NUDOCS 9208180163 | |
| Download: ML20099H165 (1) | |
Text
_ - _.
O '
JAFNPP mma TABLE 42-1 m
MINIMUM TEST AND CALIBRATION FREQUENCY FOR PCIS instrument Channel (8)-
Instrument Functional Test Calibration Frequency Instrument Check (4)
O$
co ygm
- 1) Reactor High Pressure (1)
Once/3 months None (Shutdown Cooling Permissive) eu-
- d
- 2) Reactor Low-Low-Low Water Leveb (1)(5)
(15)
Once/ day
- 3) Main Steam High Temp.
(1)(5)-
(15)
Once/ day
- 4) Main Steam High Flow (1)(5)
(15)
Once/ day
- 5) Main Steam Low Pressure (1)(5)
(15)
Once/ day
- 6) Reactor Water Cleanup High Temp.
(1)
Once/3 months None
- 7) Condenser Low Vacuum (1)(5)
(15)
Once/ day Logic System Functional Test (7) (9)
Frequency 1)
Main Steam Une isolation valves Once/6 months Main Steam Une Drain Va!ves Reactor Water Samp!o Valves 2)
RHR-Isolation Valve Control Once/6 months J
Shutdown Cooling Valves 3)
Reactor Water Cleanup Isolation Once/6 months 4)
Drywellisolation Valves Once/6 months TIP Withdrawal Atmospheric ControlValves 5)
Standby Gas Treatment System Once/6 months Reactor Building isolation NOTE-See notes following Table 42-5.
i Amendment No. 7/, p!f,1p6,J8T,182 78
. -