s 1

}

Docket.No. 50-277 Attachmentsto Monthly Operating.

Report for October, 1984-REFUELING INFORMATION

\\

1.

Name of facility:

~

. Peach Bottom Unit 2 2.

Scheduled'date for'next refueling shutdown:

April-27,-1984 l

3.

Scheduled date for. restart following refueling:

February 15, 1985' 4.

Will refueling or resumption of operation thereafter require a technical specification change' or other. license amendment?

Yes If. answer is yes, what, in general, will these be?

Technical Specifications to accommodate reload fuel.

Modifications to reactor core operating limits.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Reload 6 license amendment application submitted September 7, 1984.

6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

None expected.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

,R$

(a)

Core - 764 Fuel Assemblies QGsL (b)

Fuel Pool

-1170 Fuel Assemblies, 58 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size-

,o of any increase in licensed storage capacity that has been-ng requested or is planned, in number of fuel assemblies:

The spent-fuel pool storage capacity has been relicensed for 2816 fuel assemblies.

a

~E Itat 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

. September,1990 -(March,1986, with reserve full core discharge)

I

Docket No. 50-278 Attachment to Monthly Operating Report for October, 1984 REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 3 2.

Scheduled date for next refueling shutdown:

March 30, 1985.

3.

Scheduled date for restart following refueling:

June 8, 1985.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes.

If answer is yes, what, in general, will these be?

Technical Specifications to accommodate reload fuel.

Modifications to reactor core operating limits.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

December, 1984 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

None expected.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a)

Core - 764 Fuel Assemblies (b)

Fuel Pool - 1212 Fuel Assemblies, 6 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has-been relicensed for 2816 fuel assemblics.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

September, 1991 (March, 1987, with reserve for full core discharge) t

Docket.Nos. 50-277/50-278 i-Attachment-to. Monthly Operating. Report:for.

[

October,-1984 l-Peach Bottom Atomic Power Station

~

Narrative Summaryiof Operating. Experiences October,-1984 l-

.r L

UNIT 2 Unit 2's Refueling /P'ipe Replacement outage continues.

Replacement'of the nuclear instrument dry. tubes in the reactor, j.

head, spray piping installation, and removal of the recirculation and Residual lleat Removal' piping have been completed.

Fuel channel inspection, positioning and end prepping of the new recirculation pipe installation in the drywell, jet' pump riser safe-end replacements,' and replacement of reactor nuclear instrument detectors are in progress.

The

'D' recirculation pump motor has been removed from the-drywell and the

'A' pump motor has not yet been removed.

UNIT ?

The unit began the month at 96% power due to the 13 Traversing Incore Probe (TIP) machine being out-of-service.

On October 25, load was reduced to 80% power to reduce ~the high off gas radiation' levels of approximately 45,000 uC1/second and mitigate future fuel failures.

After the power reduction, the off gas radiation level was 24,000 uCi/second and the unit ended-the month at 80% power.

l l

i l'

/SLZL

~.,..

AVERAGE DAILY UNIT POWER LEVEL 1

DOCKET NO. 50 - 278

. UNIT PEACH BOTTOM UNIT 3 DATE NOVEMBER 14,198'.

COMPANY PHILADELPHI A ELECTRIC COMPANY-W.M.ALDEN-E NG IN E E R-I N-C HARGE LICENSING SECTION GENERATION O! VISION-NUCLEAR TELEPHONE (215) 641-5022 MONTH OCTOBER 1984 DAY AVERAGE DAILY POWER LEVEL

'OAY AVERAGE DAILY POWER LEVEL IMWE-NET)

(MWE-NET) 1 1004 17 1020 2

1020 18 1020 3

1017 19 1023 4

1023 20 1021 5

1026 21 1020 6

1032 22 1018 7

1028 23 1022 8

1025 24-1019 9

1024 25 994 10 1021 26 844 11 1023 27 845 12 1019 28 844 13 1019 29 837 14 1C19 30 836 15 1019 31 831 16 1021

,' g.

9 S

  • [k.-

a

- 4. !

t T

? 'r f, g

g i

[*J

. =.. -.

s

' AVERAGE DAILY UNIT POWER LEVEL' I DOCKE T NO. 50 - ~ 277.

UNIT PEACH BOTTOM UNIT 2 DATE NOVEMBER 14,1984 COMPANY PHILADELPHI A ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING-SECTION

- GENER ATION O! VISION-NUCLE AR.

TELEPHONE (215) 841-5022

' MONTH OCTOBER 1984 0AY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL iM WE -N ET )

'IMWE-NET) 1 0

- 17 0

2 0

18 0

'3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

' 7' O

23 0

B 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

20 0

13 0

29 0

14 0

30 0

.15 0

31 0

14 0

/*

e g

    1. .V

.e

'%E s. !

h

.'**>t t

U!

T t

a t

s

.n I

L-

  • n

T 1

1 Il

}

N$6 bPERATING FATA EEPORT

-4 DOCRET NO. 50 - 278 DATE NOVEMBER 14.1984 COMPLETED BY PHILADELPHI A ELECIRIC COMPANY W.M.ALDEN si E NGI NE E R-I N-CHARCE LICENSING SECTION py GENERATICN DIVISION-NUCLEAR TE LE PHONE 12158 841-5022 s..,

5'

,,j,,p>.

06,9P4 tlNG' 5f ATUS

1. UNii NA*E s PE ACH buiTOM UNii 3 l NOTES: UNII 3 EXPERIENCED l

l I

2.~ REPORTING PER100:

DCTO4ER, 1964:

1

. A LOAO REOUCTION TO 1

.I 1

3. LICEN5ED THERNAL POWERIMWil s 3293 l

LUWER.THE RADI ATION 1

g i

4. NAMEPL ATE RATING' ICR055 MWEl s 1852 l

LEVELS IN THE OFF-GAS.

'l l

'l

5. DESIGN ELECIRIC AL RAIING l NET MWil?

1065 i

L

-),-,.

1 I

6. MAXIMUM OEPEN0 AsLE CAP ACITY (GROSS MWEls 1098

-1 I

-l l

7. MAxlMUN DEPEv0A8,tE CAPACITY INET MWEls 1035

'l I

8.

IF CH ANGE S OCCUR IN CAPACITV RATINGS IliEMS NUM8ER 3 THm0GyH 7 5 SINCE LAST REPORT. GIVE HEASDN5

9. P,0WER LEVEL TO WHICH RESTRICTED. IF ANY INET MWEls
10. RE ASONS FOR RESTRICTIONS. IF ANY P

THIS MONTH YR-TO-0 ATE CUMUL A II VE 11.: HOUR 5 IN REPDkilNG PERIOD 745 7.320 86.424

12. NUM8ER OF HOURS RE ACTOR WA$ CRi flC AL 745.0 -

6.429.8 63.229.6 V.

13. RE AC TOR RE SERVE SHulDOWN H3URS 0.0 0.0 0.0
14. HOURS GENER A TOA DN-LINE 745.0 6.359 4 61.675.6
15. UNST Rf5ERVE $NuiDOWN HOURS 0.0 0.0 0.0
16. CAQ55 THERMAL ENERGY CENERATED IMWHI 2.257.320 20.051.343 181.089.648
17. GR055 ELECTRICAL ENERGY GENERATED IMWHI 758.480 6.697.7hd 59.512.640
18. NET ELECTRICAL NEP.GY CENERATED IMWHI 733.679 6.483.227

$7.147.012 3

19. UN!i SERVICE. F ACION 100.0 E6.9 71.4
20. UNii AVAILA83LITY F ACTDR 100.0 86.9 71.4
21. UNIT CAPAcl1Y F Acl0A IU51NG MOC NE T) 95.2 85.6 63.9

22. uNii CAPACITY F ACTOR FUSING OER NEil 92.5 83.2 62.5

23. UNIT FDRCEO QUI AGE R ATE 0.0 10.5 7.6
24. 5HUTDOWN5 $CHE0utE0 DVER hEXT 6 MONTH 5 ITYPE DATE. AND DURATION OF EACHis 1.i

'25. IF SHUTDOWN AT E ND OF REPORT PERIDO. ESTIMATED DATE OF STARTUP s

!]'

26. UN!is IN TEST STATUS (PRIDR TO COMMERCIAL OPERATIONis FORECAST ACHIEVED INITIAL CRlilCAlliY

'sj e.

INI TI AL ELECTRICITY f

COMMERCI AL OPERATION g-ids t

l.hd '

Mb

3 4

s.

,3 :. e;

~

OPERATirG b4TA REPORT zu.

+

- DOCKE T No. 50 - 277 '

~

^

DAT E NOVEM8ER 14.1984 '

COMPLETE 0 BY PHILADELPHIA ELECTRIC COMPANY'

.W.M.ALDEN ENGINEER-IN-CHARGE LICEN51NG SECTION GENERATION DivlSION-NUCLEAR TELEPHONE 12151 848-5022 OPERATING STAIUS.

'1. UNIT NAMER PE ACH SOTTOM UNIT 2 l N0iE58 UNIT 2 - CONTINUED ITS -

- I g

3

. ~..

2. REPORTING PERIDO: - OCT04ER. 1984 l-SCHEDULEO 5 HUT 00WN FOR

' I

.. l g

.3. LICENSEO THERMAL POWEntMWils.

3293

'l liS sixth REFUELING AND.

1 l

- g

' 4. NAMEPLATE RAllNG l GROSS MWEl s

'1152 1

. MAINTENANCE OUTAGE.

l l

8

.-5. DE 51GM ELECIRICAL RAllNG INET MWE l s 1065-l l

1 I

6. MANIMUN DEPENOA8LE C APACITY lGR055 MWEls 1098 l

l' j

l

7. MAxlMUN DEPENDA8LE CAPACIIT.lNET MwEls 1051 l

I

8. IF CHANGES OCCUR 'IN CAPACITY RATINGS IITEMS NUM80R 3 THROUGH 71 SINCE LAST REPORT. GIVE kE A50N5:
9. POWER' LEVEL 10 WHICH RESIRICTED. 'IF ANY INET MWEls.

lo. RE ASONS FOR RESTRICTIONS. IF ANV8 -

THIS MONTH VR-TO-DATE CUMULATIVE El. HOURS IN REPORTING Ph4100 745 7.320 90.528

12. NUMBE R OP h00R $ RE A C TOR W AS CRI T I C AL 0

2.584.7 e.2.283.6

43. REACTOR RESERVE SHUTOOWN HOUR $

0.0 0.0 0.0

14. Hour 5 GENERATOR ON-LINE.

0.0 2.544.8 60.556.6

45. UNIT RESERVE ' 5 HUT 00WN HOUR $

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED IMWHI O

7.865.391 178.420.0u1

17. GROS $ ELECTRICAL ENERGY GENERATED IMWHI O

2.547.570 58.718.660

18. NE T E LECTRIC AL ENERGY GENERATED IMWHI

-4.733 2.433.538 56.269

19. UNIT SERVICE FAC TOR 0.0 34.8 66.9
20. UNIT AVAIL A8ILI F Y F ACTOR U.0 34.6 66.9
21. UNIT CAPAC liY FACTOR ' LOSING MOC NE TI 0.0 31.6 59.1
22. UNIT CAPACliY FACTOR tuSING OER NETI 0.0 -

31.2 58.4

23. UNIT FonCEO OUTAGE R ATE 0.0 4.4 12.5
24. 5Huf 00WN5 scree 0uLED OVER NExi' 6 MONTHS ETYPE. DATE AND OURAfl0N OF EACHit

' SCHEDULED SHuiOOWN FOR REFUELING AND MAINTENANCE.

5 FARTED 4/27/84

. 25. IF 5Huf00WN AT END OF. REPORT PERIOD. ESTIMATED DATE OF '5TARTUPs 02/15/85 J6. UN!!$ IN TE5I' 5f AIUS (PRIOR 10 COMMERCI AL OPERATIONl t FORECAST ACHIEVED INiilAL CRITICALliY

~

INITIAL ELECTRICITY COMMERCI AL OPERAi!0N

  • NEGATIVE VALUE AEPORTED FOR CONSIsiENCY WITH FEDERAL ENERGY MEGULATORY COMMIS$10N NEPORTS.

e

'i.

~

9 o-4 g-O-

w

+---.a6 r;'N M

"'ta^-

9 -1 M F-TM 1-

'%w?-*

-T""

-'--t--

t--tt-*

'TF-^

T'T'97Y'

4 UNIT SHJTDOWNS AND POWER REDUCTIONS DOCKET NO. SD - 277 UNIT NAME PEACH BOTTOM UNIT 2 DATE NOVEMBER 14,1984' REPORT MONTH DCTOBER, 1984 COMPLETED BY PHILADELPHI A ELECTRIC COM ANY W.M.ALDEN E NGIN E E R-IN-C HA R GE '

LICENSING SECTIDN GENERATION DIVISION-NUCLE AR TELEPHONE (215) 841-5022

.1 l

l l

1 METHDD OF l LICENSEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE l-lTYPElDURATION IREASONI SHUTTING DOWN!

EVENT

l. CODE'l CODE l ACTION TO 1.DATE i (1)I (HOURS)I (2).1 REACTOR 13) l REPORT
  • 1 (4) l (5) l P REVE NT - R ECURRENCE

=-

I I

I I

l i

I I

I l 843001 i S I 744.0 1

C i 1

1 NA I RC 1 FUELXX l SHUTDO WN FDR ITS SIXTH REFUELING OUTAGE.

1-1 I ----- :

I

-1 I

I I

l l

l 744.0 I

I i

l l

l (1)

(2)

(3)

(4) f FO'CED.

REASON METHOD EXHIBIT G - INSTRUCTIONS

> SCHE DULED A-EQUIPMENT FAILURE (EXPL AIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - M ANUAL SCRAM.

ENTRY SHEETS'FDR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT ILER)

D - REGUL ATORY RE STRICTION 4 - OTHER (EXPL AIN)

FILE INUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ACMINISTRATIVE (5)

G - OPER ATIONAL ERRDR (EXPLAIN)

H - OTHERIEXPLAIN)

EXHIBIT I - SAME SDURCE a

~

m v

UNIT SHUTOOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 273

_ - _ = - -

UNIT NAME PEACH SOTTOM UNIT 3 DATE NOVEMBER 14,1994 REPORT NONTh 2C TOS ER, 1984 COMPLETE 3 SY PHILADELPHIA ELECTRIC COMPANY W.M.ALOEN' ENGINEER-IN-CHARGE LICENSING SEC TION GENERATION OIVISION-MUCLE AR -

TELEPHONE (215) 841-5022 1

I I

l l METHOD OF 1 LICENSEE ISYSTEMI COMPONENTI C AUSE AND CORRECTIVE I

( Tf PEl0URATIONI REASONI SHUTTING 00WN!

EVENT-l CODE I CODE I,

ACTION TO No.1 OATE I (111 (HOURSil (23 l REACTOR (31 i REPOR T # l (4) l (5) l PREVENT RECURRENCE

- =__

l I

I I

I I

I I

I 9 1 841025 i S1 0

i B l I

N/A l MS

-l N/A I

LOAD REQUCEO TO LOWER RADI ATION LEVELS I

I I

I I

I i

1 1

IN THE OFF-GAS.

I I

I --- -- I I

I I

l i

I I

1 0

I I

I I

I I

t (1)

(21 (31 (4)

F - FORCEO REASON METH00 EXHISIT G - INSTRUCTIONS S - SCHECULEO A - EQUIPMENT F AI LURE - ( EXPL AIN )

1 -fMANUAL FOR PREPARATION OF DATA B - M AINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOM ATIC SCR AM.

EVENT REPORT ( LERI-0 - REGULATORY RESTRICTION 4 - OTHER (EXPL AINI FILE (NUREG-01611-E - OPERATCR TRAINING + LICENSE.EXAMIN ATION F - ADMIN ISTR ATIVE (5)

G - OPERATION AL ERROR (EXPLAINI H - O THER(EXPLAIN I EXHISIT I - SANE SOURCE s

i e

O t

r r.

a PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O., BOX 8699 PHILADELPHIA. PA.19101 1215)841-4000 November 16, 1984 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention:

Document Control Desk

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating Report File:

GOVT 1-1-5 Gentlemen:

Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of October, 1984 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.

Very truly y ur W. T.

Ullrich Superintendent Nuclear Generation Division Attachment cc:

Dr. T.

E. Murley, NRC l

Mr.

A. R. Blough, NRC Site Inspector l

Mr. Stan P. Mangi, Dept. of Envir. Resources Mr.

P. A. Ross, NRC INPO Records Center l

I

($'f? t r