Submits fitness-for-duty Program Data for 6-months Ending 920630.Two Incidents of Individuals Carrying Unopened Container of Alcoholic Beverage Onto Plant Property Noted. Nominal Weekly Testing Frequency Increased
ML20099G914
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/11/1992
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-92-093, CON-NRC-92-93 VPNPD-92-281, NUDOCS 9208180020
Download: ML20099G914 (3)


Text

_

Wisconsin 1 Electnc POWER COMPANY 231 w Menon 90 rw 204& uwuee w 532m t4 W212M5 VPNPD-92-281 10 CFR 26.71 FRC-92-093 August 11, 1992 U.

S.

NUCLEAR RFGULATORY COMMISSION Document Control Desk Mail Station F1-137 Washington, D.

C.

20555 Gentlemen:

DOCKETS 50-266 AND 50-301 j

FITNESS-FOR-DUTY (FFD) PROGRAM EQJET BEACH NUCLEAR PLANT, UNITS 1 AND 2 In accordance with 10 CFR 26.71(d), we are providing herewith the Fitness-for-Duty Perform &nce Data for the six-month period ending June 30, 1992.

No events reportable under 10 CFR 26.73(a) occurred during this period.

In addition, there were no positive tests for any substance.

We continued our quarterly program review meetings which involve key personnel responsible for administering the FFD Program.

These individuals reviewed data, measures of program effectiveness, audit findings, and written procedures.

Procedures were revised as necessary, based on these reviews.

We are providing, as an att.aehment to this letter, the standard form summarizing our FFD Program results'for the past six months.

This information indicates that the work force at Point Beach Nuclear Plant continues to be virtually drug-and alcohol-free.

There were two incidents of individuals carrying an unopened container of alcoholic beverage onto hisconsin Electric property at Point Beach Nuclear Plant.

Both containers were discovered by Security Officers during entry searches at the gate house.

Botb incidents were fully investigated, and appropriate actions were

-taken.

Wisconsin Electric has raised the nominal weekly testing frequency of our unannounced testing program.

Testing at Point Beach Nuclear Plant is now conducted nominally three times per week.

Testing of badged personnel headquartered at locations other than the plant is nominally five times per week.

This change was possible due to the hiring of a nurse for per:nanent assignment at the plant and due.to accommodations to the FFD Program by the 9208180020 920811 I

I PDR ADOCK 05000266 Qfqk R

PDR

,U d subsWuqofHicmin utem (1xpvMkvr

~

NRC-Document Control Desk

' August-11, 1992 Page 2 Wisconsin Electric Medical Department.

The annualized rate of testing after the first six months of the unannounced testing program is 106%.

Wisconsin Electric now reports data on contractor personnel by distinguishing between lono-and short-term contractor personnel.

Long-term contractor personnel are those who are hired for an undefined term or'who remain in an unannounced testing program, even when not badged at a licensed site.

This includes individuals employed as security officers and employees of the Institute for Nuclear Power Operations.

All other contractor personnel are classified as short term.

Sincerely,

/

/

g Bob Link Vice President Nuclear' Power

, Attachment Copies to NRC Regional' Administrator, Region III NRC Resident Inspector

7,.

.l*~,

y x

3 Fitness for Duty Program Performance Data i

Personnel Subject to 10CFR 26 WISC0f1 SIN ELECTRIC-POWER COMPANY JUNE 30, 1992 comonw 6 er* Em

?.4 POINT BEACH NUCLEAR PLANT locason w h f84 (414) 221-2698 THOMAS R. EELLS '

a_.,

Cutotts: Screen' Confirmation (ng'ml)

$1 Appendix A to 10CFR 26 Marijuana..

/-

Amphetamines

/

/

Cocaine

/

Phencyclidine

/

/

. Opiates

/

Alcohol (% BAC)

/

L l--

Long-Term Short-Term 1

Testing Flesults :

Ucensee Employees Contractor Personnel Contractor Personnel p

Average Number witt 1

- Unescorted Access -

596 77 329 i

Categories Tested Positive Tested Positive Tested.

' Positive I

Preaccess 158 0

1 0

229 0

Y

Post accident ~

0 0

0 0

0 0

Q' LObserved behavior 0

0 0

0 0

0-aMom F

-474-0

??

O R7 0

L l:

' Follow up -

0 0

0 0

-0 0-Other' O

O O

n n

0 l-Totat 582 0

23 0

316-0 REV.1/92 L