ML20099G845
| ML20099G845 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 05/07/1984 |
| From: | Boyer V PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| OL-A-095, OL-A-95, NUDOCS 8411270458 | |
| Download: ML20099G845 (3) | |
Text
-
4 APPL Ex.95
~
p s
MEF: 4*[
/
n== =,
)fr. Dcyte Grier, Directer ll-b United States Nuclear Reguistory Cornissic.n 1
MC 9GS4,%y Office of Inspection and Enforcesant, Rs2 on I i
g A licssaancu DoccTr:ta a 631 Ptrk Avenue King of Prussia. PA 19406 Q ~~3nsc g
I h
\\
Subject:
USNRC IE;I Letter dated May 10, 1978 dl 4 Re: Site Inspection of March 30 and April 3-7, 1974 Inspection Report No. 50-332/78-03 Limerick Generating Station - Units 1 6 2 7
l
)
Pile:
Qual 1-2-2 (352/18-031 4
Dear Mr. Grier In response to the subject letter regarding an itoa identified during the subject inspection of construction activities authorized by MRC License Nos. CPPR-146 and -107, we transmit herewith the followi ng:
O i
Attachment I - Response to Appendiz A
{';
F
. Should you have ar.y questions concerning this ites, we would be pleased to discuss them with you.
Sincerely,
- G Yf V. S. Boyer
/'.JC:JJP:crs v Attachment bec:
R. H. Elias, Sechtel J. S. Xemper E. J. Bradley G. White E. C. Xistner H. R. Waltert/ Local File (2) #
J. J. Clarey R. A. Mulford J. M. Corcarsn 4
W. J. Johnson i
Project File (2)
W en y
PDR Q
- v... n 2.:
- e :. s. u.. ::, :. i.-
.c I
'n.
ATTACEMINT I (V~T
.f Easconse'cc Iten of Nonce =clianca Infrae: ion 10CFR 5'0, Appendix 3, Criterion V, statas, in part, ths::
"Activi:tas affec:ing quality shall be prescribed by documen:ed instructions, proceduras, or drawings...and shall be accomplished in accordance with these instructions, procedures, or drawings."
The Lisarick PSAR, Appendix D",
Quality Assurance Program, Paragraph D.6.4, s:staa, in part, that: "Bechtel Construction Department...is responsible for construction of the plant to approved anginaaring specifications, drawings, and procedures..."
Liquid Pana: rant Test Proceduie !??T-340-39-02, Revision 0 of the Peabody Testics, Inc., a testing subcontractor for the 3echtal Construction Department, states, in part, that "Any indication in excess of the acceptance standards (1/16") which is believed to be nonzalavant, shall be regarded as a defect and shall be re-examined to verify whether or not actual defacts are present."
ro Contrary to :he above, on April 7, 1973, a liquid penetran:
parformed on pips vald H3C-183-1-FW-8 resultad in developed cast
(_;
indications in excess of the acceptance standard o' 1/16" and 1:
was not verified if actual datects vara present.
Resoonse On April 11, 1978 a liquid panatrant :ast was again performed on pipe wald H3C-133-1-FW-8.
The tas: was performed by a j
qualified exa=inar and was witnessea by evo persona qualified to SNT-TC-1A Level III and by the Auchbrized Inspector.
Natcher the i
axaminar nor the witnessaa observed any indications which excaaded
~
the acceptanca standard of 1/16".
The raport of this test, which states that the vald is acceptable, is on file.