Forwards Inservice Insp Ninety-Day Rept,Beaver Valley Power Station Unit 2 for Period 901115-920507. Results of Neutron Flux Thimble Tube Insps,Per NRC Bulletin 88-009 Also Encl
ML20099F173
Person / Time
Site: Beaver Valley
Issue date: 08/04/1992
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20099F176 List:
References
IEB-88-009, IEB-88-9, NUDOCS 9208120164
Download: ML20099F173 (1)


Text

Deaver Whey Powe' SWon

$h,pgwng[txt PA it077 0004 v$,U7.,, c,,

August 4, 1992 m m sm U.

S.

Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Third Refueling Outage Inservice Inspection Report This letter forwards the Unit 2 Third Refueling Outage Inservice Inspection Report.

The following examination results are documented in the attached report:

ASME Code Class 1,

2, and 3 components for which ASME XI, Article IWA-6230 requires a 90 day-report.

Included are the results of the neutron flux thimble tube inspections satisfying NRC Bulletin 88-09.

Steam generator tube inspections for which Technical Specification 4.4.5.5 requires a special report.

These examinations are part of Interval 1, Period 2 of the Unit 2 inservice inspection schedule.

The inspections were performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code, 1983 edition through Summer 1983 addenda.

If you have any questions, please contact Steve Sovick at (412) 393-5211.

Sincerely,

[

D.

Sieber Attachment cc:

Mr. L. W. Rossbach, Sr. Resident Inspector Mr.

T. T. Martin, NRC Region I Administrator Mr.

A.

W. De Agazio, Project Manager l

Mr.

M.

L. Bowling (VEPCO) (w/o attachment)

)

p$geigggggoj88

,<}(

2 a

- --