ML20099B879
| ML20099B879 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 07/24/1992 |
| From: | Joshua Wilson TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20099B883 | List: |
| References | |
| NUDOCS 9208030135 | |
| Download: ML20099B879 (2) | |
Text
__
q A
.Termssee Va%y Awuq PoM OHgp gM gg $3dgDgy }gggg }f}?Q
?
J. L. Wilson Vcc Prescent. Seaucph Nuclear hw July 24, 1992 U.S. Nuclear Regulatory Commission ATTN:.-Document Control Desk Washington, D.C.'20555 Gentlemen:
In the Maticr of
)
Docket No. 50-328
. Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SQN) UNIT 2 - REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST (ILRT)
Enclosed is the summary technical report on the containment ILRT for SQN Unit-2 conducted April' 27-29, 1992, in conjunction =with the' Cycle 5-refueling cutage. This report is being submitted for your review in accordance with 10 CFR 50, Appendix J.,Section V.B.1 and V.B.3.
The; subject.ILRT is being reported as a failed test due to local
-leak-rate 1" leakage savings" additions.. As-found leakage through a single penetration'(X-47A).'during the performance of the local leak rate testing prior to_ performance of the ILRT caused the f ailure. Historical = data on leakage through penetration X-47A and penetrations identical to'X-47A demonstrate'that this failure was a~ random occurrence. TVA has.
L determined that alternative corrective measures fully address the l'
. isolated occurrence and that increased surveillance frequency required by
.10 CFR-50,-Appendix J,.would be inappropriate..TVA plans to submit justification for relief from the Appendix J. requirement and a change
. request for.the associated technical specification.
Please-direct questions concerning-this issue to D. V. Goodin at l(615) 843-7734.
Sincerely..
(d 3/14 l
J L. Wilson j
9208030135 930724' *
^'^
j jl f
PDR l
P Apacg 05000328-Enclosure PDR
.cc: See page 2
y -
3 F
U.S., Nuclear-Regulatory Commission Page'2-July _24,:1992 p-cc:
Mr. D. E. laBarge, Project Manager (w/ Enclosure)
U.S. Nuclear Regulatory Commission.
One-White Flint.' North 111555 Rockville Pike Rockville, Maryland 20852 NRC Resident Inspector (w/ Enclosure)
Sequoyah Nuclear Plant 2600;Igou Ferry Road
' Soddy Daisy, Tennessee;37379 Mr. B. A.: Wilson,' Project Chief (w/ Enclosure)
U.S. Nuclear-Regulatory Commission Region II.
~101 Marietta Street, NW, Suite 2900
~ Atlanta.. Georgia 30323 i
g n
l*
-.