Forwards Reactor Containment Bldg Integrated Leak Rate Test Sequoyah Nuclear Plant Unit 2, Conducted on 920427-29.ILRT Being Reported as Failed Test Due to Local leak-rate Leakage Savings Additions
ML20099B879
Person / Time
Site: Sequoyah 
Issue date: 07/24/1992
From: Joshua Wilson
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20099B883 List:
References
NUDOCS 9208030135
Download: ML20099B879 (2)


Text

__

q A

.Termssee Va%y Awuq PoM OHgp gM gg $3dgDgy }gggg }f}?Q

?

J. L. Wilson Vcc Prescent. Seaucph Nuclear hw July 24, 1992 U.S. Nuclear Regulatory Commission ATTN:.-Document Control Desk Washington, D.C.'20555 Gentlemen:

In the Maticr of

)

Docket No. 50-328

. Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SQN) UNIT 2 - REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST (ILRT)

Enclosed is the summary technical report on the containment ILRT for SQN Unit-2 conducted April' 27-29, 1992, in conjunction =with the' Cycle 5-refueling cutage. This report is being submitted for your review in accordance with 10 CFR 50, Appendix J.,Section V.B.1 and V.B.3.

The; subject.ILRT is being reported as a failed test due to local

-leak-rate 1" leakage savings" additions.. As-found leakage through a single penetration'(X-47A).'during the performance of the local leak rate testing prior to_ performance of the ILRT caused the f ailure. Historical = data on leakage through penetration X-47A and penetrations identical to'X-47A demonstrate'that this failure was a~ random occurrence. TVA has.

L determined that alternative corrective measures fully address the l'

. isolated occurrence and that increased surveillance frequency required by

.10 CFR-50,-Appendix J,.would be inappropriate..TVA plans to submit justification for relief from the Appendix J. requirement and a change

. request for.the associated technical specification.

Please-direct questions concerning-this issue to D. V. Goodin at l(615) 843-7734.

Sincerely..

(d 3/14 l

J L. Wilson j

9208030135 930724' *

^'^

j jl f

PDR l

P Apacg 05000328-Enclosure PDR

.cc: See page 2

y -

3 F

U.S., Nuclear-Regulatory Commission Page'2-July _24,:1992 p-cc:

Mr. D. E. laBarge, Project Manager (w/ Enclosure)

U.S. Nuclear Regulatory Commission.

One-White Flint.' North 111555 Rockville Pike Rockville, Maryland 20852 NRC Resident Inspector (w/ Enclosure)

Sequoyah Nuclear Plant 2600;Igou Ferry Road

' Soddy Daisy, Tennessee;37379 Mr. B. A.: Wilson,' Project Chief (w/ Enclosure)

U.S. Nuclear-Regulatory Commission Region II.

~101 Marietta Street, NW, Suite 2900

~ Atlanta.. Georgia 30323 i

g n

l*

-.