ML20099B440

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Fort Calhoun Station Cycle 14 Core Operating Limits Rept, Revising Section 6.0 & Figure 3 to Reflect Permissible Increase in Linear Heat Rate & Correcting Note on Figure 5
ML20099B440
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/23/1992
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20099B444 List:
References
LIC-92-224R, NUDOCS 9207310160
Download: ML20099B440 (1)


Text

- - - - - - - - _ - _ _ _ _ _ - - -

4

. _ _ _ _ _ . ~ _ _ . . - . . . . _-._._.__.22_._~ ___

Omaha Pub!!c Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 402/636-2000 July 23, 1992 LIC-92-224R V. S. Nuclear Regulatory Commission ATIN: Document Control Desk Mail Station Pl-137 Washington, DC 20555

Reference:

Docket No. 50-285 Gentlemen:

SUBJECT:

Transmittal of Fort Calhoun Station (FCS) Cycle 14 Core Operating L Limit Report (COLR) - Revision 1 ,

In accordance with FCS Technical Specification 5.9.5, attached is a copy of Revision 1 to the FCS Cycle 14 COLR dated June 28, 1992. In Revision 1, Section 6.0 and Figure 3 have been revised to reflect a permissable increase in the linear heat rate and the note on Figure 5 has been corrected.

If you should have any questions, please contact me.

Sincerely, _

hN W W. G. Gates Division Manager Nuclear Operations WGG/sel Attachment c: LeBoeuf, Lamb, Leiby & MacRae J. L. Milhoan, NRC Regional Administrator, Region IV R. P. Mullikin, NRC Senior Resident inspector S. D. Bloom, NRC Acting Project Manager U1.0004 1, 9207310160 920723 f. \ i

\ ,

PDR ADOCK 05000285 g/ ti l p PDR ktVb l 45 5124 Empwpen F op;xmnq j\ \

- __ ___- _-