ML20099A684

From kanterella
Jump to navigation Jump to search
Forwards 10CFR50.46 Margin Utilization Byron & Braidwood Units 1 & 2, Constituting Annual ECCS Evaluation Model Change Rept for Period Ending 910725.Vendor Made No Changes to ECCS Evaluations in Past Yr
ML20099A684
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 07/23/1992
From: Jackson M
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20099A687 List:
References
NUDOCS 9207290351
Download: ML20099A684 (2)


Text

[

N C:mmonw=lth Edison l'

) 1400 Opus Place

__ J Downers Grove, tilinois 60515

\\%,j '

e.) P

~

y.i 4 ih;1 July 23, 1992 1

Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 ATTN: Document Control Desk

Subject:

Byron Nuclear Power Station Units 1 and 2 Braidwood Nuclear Power Station Units 1 and 2 Reporting of ECCS Evaluation Model Changes NRC Docket Nos. 50-454, 50-455, 50-456 and 50-457

References:

1.

Letter from D. L. Taylor (CECO) to T. E. Murley (NRC) dated July 25, 1991.

2.

Letter dated April 20, 1992, S. F. Stimac to T. E. Murley Dr. Murley:

This letter fulfills the annual reporting requirement of 10CFR50.46(a)(3)(11) for Units 1 and 2 of Byron and Braidwood Nuclear Power stations.

Reference 1 transmitted to the NRC the results of the ECCS evaluation models for Byron and Braidwood (and Zion) current through July 25, 1991.

The vendor has not made any changes to the Byron and Braidwood ECCS Evaluations in the past year.

A summary of the 10CFR50.46 Margin Utilizations for each of the subject units is being re-transmitted to you for your records. These are the same results that were transmitted to you in Reference 1.

The re._,ts of the Zion Nuclear Power Station Units 1 and 2 (NRC Docket Nos. 50-295 and 50-304) were transmitted by Reference 2.

That letter fulfills the annual reporting requirement of 10CFR50.46(a)(3)(ii) for Units 1 and 2 of Zion, h\\

2032:1 9207290351 42'0723 PDR ADOCK 05000454 R

PDR

- ~.

--2

~

Because compliance with 10CFR50.46 is maintained with existing PCT penalties, no near term reanalysis is planned for these Units.

i Please direct any questions to this office.

Respectively, j

i

/'/M cd2t Marcia A. J,[ckson Geberic(IssuesAdministrator DRR:kab ZKAB:27:2 Attachment ec:

A. B. Davis - Regional Administrator, Region III R. J. Barrett - PDIII-2 Director, NRR

.R.,M. Pulsifer - Braidwood Project Manager, NRR

.A. H. Hsia - Byron Project Manager, NRR M. A. Caruso - Reactor Systems Section'C:hief, NRR Senior Resident Inspector - Byron Senior Resident Inspector - Braidwood 4

2032:2

^

.. _.