.i Omaha Puh!!c Power District 444 South 16th Street Mall Omaha. Nebraska 68102-2247 2M July 22, 1992 LIC-92-222R U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station PI-137 Washington, DC 20555
References:
1.
Docket No. 50-285 2.
Letter from NRC (A. B. Beach) to OPPD (W. G. Gates) dated June 22, 1992 Gentlemen:
SUBJECT:
NRC Inspection Report No. 50-285/92-11 Reply to a Notice of Violation (NOV)
The subject report transmitted a NOV resulting from an NRC inspection conducted April 26 through June 6,1992 at the Fort Calhoun Station (FCS). Attached is the Omaha Public Power District (OPPD) response to this NOV.
In the inspection re ort, the inspector noted a concern with a lack of a questioning attitude personnel in the area at the time of discovery of the violation.
The FCS p ant manager issued a memorandum on June 8,1992 to all badged personnel stressing the need for a questioning attitude in conducting daily activities. As further action in this effort, OPPD has begun administering self-checking training to the Operations, Maintenance, Chemistry, System Engineering and Radiation Protection Departments at FCS.
If you should have any qu'estions, please contact me.
Sincerely 4f/. N Nct617 W. G. Gates Division Manager Nuclear Operations t!Gr,/grc Attachment c:
LeBoeuf, Lamb, Leiby & MacRae J. L. Milhoan, NRC Regional Administrator, Region IV R. P. Mullikin, NRC Senior Resident inspector i
S. D. Bloom, NRC Acting Project Manager l
9207290322 920722 7-w gp g
l
.,s Attachment LIC-92-192R Page 1 REPLY TO A NOTICE OF VIOLATION V10LATION During an NRC inspection conducted on April 26 through June 6,1992, a violation of NRC requirements was identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2. Appendix C, the violatioi) is listed below:
10 CFR Part 50, Appendix B, Criterion XVI, and the Fort Calhoun Quality Assurance Plan, Revision 3 Section 10.4, Paragraph 4.2.5, require, in part, that corrective actions associated with significant conditions adierse to quality shall precluda repetition.
Contrary to the above, the licensee's corrective action to preclude personnel from walking on critical quality element piping failed to prevent recurrence, when, on May 12, 1992, a member of the licensee's craft personnel was identified stepping on the boric acid storage tank piping while insulating piping in that ares.
This is a Severity Level IV violation.
OPPD RESPONSE A.
Tbj Reason for the Violation This violation resulted primarily from carelessness by a craftsperson.
Although fully aware of company policy and limitations for stepping on piping through receipt of a briefing on February 28, 1992 as a result of a similar event, the craftsperson inattentively stepped en the piping.
A contributing factor was also identified. The Fort Calhoun Station (FCS) policies and procedures that contain the limitations for standing and climbing on piping were reviewed. The review revealed some ambiguity and discrepancies among the documents which could result in less than adequate understanding of the limitations by craft personnel.
For example, Standing Orcers G-21 (Modification Control) and M-100 (Conduct of Mainte ance) provided inconsistent guidance on when it was appropriate to stand ca piping or cable tras.
B.
Corrective Steps That Have Been Taken and the Results Achieved OPPD comple'yd a Root Cause Analysis (RCA) of this violation. The current policies regarding climbing on piping, conduit, and cable trays have been reviewed with maintenance personnel at department meetings. In cddition, the FCS plant manager issued a letter on Jur.e 16, 1992 to remove ambiguity in this area until all corrective actions resulting from the RCA could be implemented.
Attachment t.lC-92-222R Page 2 B.
Corrective Sleos That Have Been Taken and the Remlts Achieved j tirwgl The individual who stepped on the pipe and his direct supervis e e been counseled to emphasize the FCS polic', for climbing and standing e piping, and to reinforce the seriousness of their failure to follow FCS policies.
An engineering assessment has also been completed which concluded that the piping associated with this violation was not damaged as a result of the incident.
C.
EqC.tective Steps That Will Be Taken to Avoid Further Violations The following steps will Je taken to prevent recurrence of this violation:
1.
OPPD will revise the FCS Safety Manual to provide a clear policy for personnel climbing and standing on piping, conduit, and cable trays if other means of support are not practical.
For this specific issue, the FCS Safety Manual will become the governing document, This will be completed by September 30, 1992.
w 2.
OPPD will revise Standing Orders M-100 (Conduct of Maintenance),
G-21 (ModiO *ation Control) and 0-1 (Conduct of Operations) to reference di action given in the FCS Safety Manual.
This will be completed by September 30, 1992.
3.
OPPD will revise Standing G-6 (Housekeeping) and G-78 (Observation Program) to add direction for supervisors to increase their awareness on expectations related to this issue.
This will be completed by September 30, 1992.
4.
Af ter the documents noted in Actions 1-3 above are revised, the Training Department will issue required reading "Hotlines" summarizing this information to personnel whose specific work assignments include working around piping, conduit, and cable trays This will be completed by October 15, 1992. Also, followup training will be provided to appropriate personnel.
This training, which g
will reinforce management expectations concerning this issue, will be completed by December 31, 1992.
conduit, and Station policy for climbing and standing on piping, Training.
5.
cable trays will be incorporated into General Employee It will also be incorporated into appropriate continuing training programs. Appropriate lessor. plans will be revised by December 31, 1992.
D_ ate _Whfn Full Comoliance Will Be Achieved D.
a 2
OPPD is presently in full compliance based nn the completed actions listed above.