ML20098G365

From kanterella
Jump to navigation Jump to search
Forwards River Bend Station,Louisiana General & Parish Radiological Emergency Response Plans,Dec 1983,Regional Assistance Committee Consolidated Comments
ML20098G365
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/27/1984
From: Krimm R
Federal Emergency Management Agency
To: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20098G366 List:
References
NUDOCS 8410040449
Download: ML20098G365 (1)


Text

.

N g

[*

s -Federal Eiaergency Management Agency I

Washington, D.C. 20472 b

o o

SEP 2 7 rgga MEMORANDUM FOR: Edward L. Jordan Director, Division of Emergency Preparedness and Engineering

Response

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission FROM:

Assistant Associate Director Office of Natural and Technological Hazards Programs

SUBJECT:

Interim Finding on Offsite Radiological Emergency Response Plans for the River Bend Station Attached is a copy of the Fedcral Emergency Management Agency's (FEMA) Interim Finding on the adequacy of the Louisiana Peacetime Radiological Response Plan (Revision V) site-specific to the River Bend Station. The Interim Finding Report was prepared by the FEMA Region VI staff. The Louisiana State Plan as well as the Parish Plans of East Baton Rouge, East Feliciana, Pointe Coupee, West Baton Rouce, and West Feliciana, all dated December 1983, were reviewed by the FEMA Region VI staff and the Regional Assistance Committee.

The Plans were reviewed against Section II, Planning Standards and Evaluation Criteria, NUREG-0654/ FEMA REP-1, Rev.1 (A-P).

The inadequate. elements ' discovered by the review of the State and Parish Plans have been furnished to the State of Louisiana by letter for comment and/or cr/rection. A meeting has been tentatively scheduled later this

-month with the State of Louisiana and Parish officials to discuss and resolve the elements found to be inadequate. Our Regional Office will maintain close liaison with the State of Louisiana to ensure that inadequate elements are corrected to our satisfaction. A schedule of corrective actions will be provided to you as soon as possible after this meeting.

A further review of adequacy on the State and Parish Plans will be made once the Regional Assistance Committee completes its review of the corrections to the plans.