Application for Amend to Licenses NPF-4 & NPF-7,revising Tech Spec 3.0.5 to Take Action within 2 H When Sys,Train, Component or Device & Corresponding Normal or Emergency Power Sources Inoperable.Fee Paid
ML20098F758
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/28/1984
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML20098F759 List:
References
177, NUDOCS 8410030342
Download: ML20098F758 (4)


Text

-

c=. y;..

VIRGINIA ELECTRIC. AND PownB COMPANY RIcumown,VrmOINIA 20261

. w. L. srewaarr vie e

.-September 28,~1984

- Necs.am oramasso..

Mr.' Harold R.:Denton, Director Serial No. 177 L0ffice of Nuclear Reactor Regulation N0/JHL:aca Attn:. Mr. James R.' Miller, Chief.

Docket Nos. 50-338 Operating Reactors-Branch No. 3 50-339

' Division of Licensing.

License Nos. NPF-4

-U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.-1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGES

'Pur'suant to 10 CFR 50.90,.the Virginia Electric and Power Company requests an.

! amendment, in the form of changes to ' the Technical Specifications.

to-Operating License Nos. NPF-4 and NPF-7 for North Anna Unit Nos. I and-2.

The:. proposed Technical ~ Specification changes will revise-Technical-

Specification ' 3.0.5.~

The specific changes will be to take' action within 2~'

hours when a-system, subsystem,

train, component or device and its corresponding normal or-emergency power sources are inoperable and all its fredundant systems, subsystems,-trains, components and_ devices are inoperable.

~

~

The action taken so the. applicable LCO does not apply is to place the unit in:

1.

At least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, l

2.

At least HOT SHUTDOWN within the following 6 hou.s, and.

l 3.

At least COLD SHUTDOWN.within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

L

?

These proposed Technical ' Specifications are requested because the current Technical Specifications are more restrictive than other Technical Specification LCO's'for similar situations where 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> were allowed to be in at-least' HOT STANDBY.

The changes will allow greater operating flexibility and provide additional time for repairs prior to having to shutdown the unit.

The. proposed Technical Specification changes for North Anna Unit No. I'are'

.-provided in Attachment 1.

The proposed Technical Specification changes for.

i North Anna l Unit No. 2. are provided in Attachme,t 2.

A discussion of the proposed Technical'Specificat' t changes is provided in Attachment 3.

~

t

~

pg,

841'0030342 840928

!~

\\ )@p p

PDR ADOCK 05000338 h\\

P PDR e

4 t

f)5II 4-Harold R. Denton

-VinoinA EtscTasc Axo Powsm COMPANY TO This request'has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff.

It has been determined that this_ request does not involve an unreviewed safety question as defined in 10 CFR 50.59 and :it does not pose a significant hazards consideration as defined in 10 CFR 50.92.

We L have reviewed' this - request in accordance with the criteria in 10 CFR 170.12.-

A voucher check in the amount of $150 is enclosed as an application fee.-

Very truly yours,

"'*~s, W. L. Stewart Attachments 1.

Proposed Technical Specification Changes - Unit 1 2.

Proposed Technical Specification Changes - Unit 2

3.

Discussion of Proposed Technical Specification Changes

4. ' Voucher Check for $150 cc:

Mr. James P. O'Reilly Regional Administrator

' Region II

'Mr. M. W. Branch NRC Resident Inspector f

North Anna Power Station Mr. Charles Price Department of Health 105 Governor Street Richmond, Virginia 23219 f

l[

5

W

\\

i t

CCMMONWEALTH OF VIRGINIA )

)

CITY OF RICHMOND

)

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by W.

L.

Stewart who is Vice President Nuclear Operations, of the Virginia Electric and Power Company.

He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

S 0

Acknowledged before me this.2Y day of viaM 19 %Y My Connission expires:

<A-A6 19 Pi b~

b M W%

Notary Public (SEAL) 4 s/ col

W'..

.w e

e r

e

~...

e ATTACIMENT 1 4

0

-