Letter, Individual 14-Day Notice of Consideration of Issuance of Amendment, Revise TS 5.5.9, Steam Generator (SG) Program, for One-Time Extension of SG Tube Inspection Until Next Unit 2 Refueling Outage (Exigent Circumstances)
ML20098F289
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 04/10/2020
From: Scott Wall
Plant Licensing Branch III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Wiebe J
References
EPID L-2020-LLA-0069
Download: ML20098F289 (17)


Text

April 10, 2020 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNIT 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING (EXIGENT CIRCUMSTANCES) (EPID L-2020-LLA-0069 [COVID-19])

Dear Mr. Hanson:

The U.S. Nuclear Regulatory Commission (NRC) has forwarded the enclosed Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing, to the Office of the Federal Register for publication.

This notice relates to your application dated April 6, 2020 (Agencywide Documents Access and Management System Accession No. ML20097J188), in which you request a one-time extension of steam generator tube inspections for Braidwood Station, Unit 2. If you have any questions, please contact Joel Wiebe at 301-415-6606.

Sincerely,

/RA/

Scott P. Wall, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-457

Enclosure:

Notice of Consideration cc: Listserv

ENCLOSURE FEDERAL REGISTER NOTICE

[7590-01-P]

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-457; NRC-2020-0089]

Exelon Generation Company, LLC; Braidwood Station, Unit No. 2 AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment application; opportunity to comment, request a hearing, and petition for leave to intervene.

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Renewed Facility Operating License No. NPF-77, issued to Exelon Generation Company, LLC, for operation of the Braidwood Station, Unit No. 2. The proposed amendment would provide a one-time extension of steam generator tube inspections to allow the inspections to be conducted after three operating cycles instead of after the current required two operating cycles. The amendment is necessary to avoid conflicts with the Centers for Disease Control and Prevention recommendations regarding social distancing to prevent the spread of the COVID-19 virus. The amendment also avoids a possible scenario in which expertise required to conduct the inspections is lost because of COVID-19 infections.

DATES: Submit comments by [INSERT DATE 14 DAYS FROM DATE OF PUBLICATION IN THE FEDERAL REGISTER]. Requests for a hearing or petition for leave to intervene must be filed by [INSERT DATE 60 DAYS FROM DATE OF PUBLICATION IN THE FEDERAL REGISTER].

ADDRESSES: You may submit comments by any of the following methods:

Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0089. Address questions about NRC docket IDs in

Regulations.gov to Jennifer Borges; telephone: 301-287-9127; e-mail:

Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.

Mail comments to: Office of Administration, Mail Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program Management, Announcements and Editing Staff.

For additional direction on obtaining information and submitting comments, see Obtaining Information and Submitting Comments in the SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Joel S. Wiebe, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-6606, e-mail: Joel.Wiebe@nrc.gov.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC-2020-0089 when contacting the NRC about the availability of information for this action. You may obtain publicly-available information related to this action by any of the following methods:

Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0089.

NRCs Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 2

301-415-4737, or by e-mail to pdr.resource@nrc.gov. The proposed license amendment request, dated April 6, 2020, seeking a one-time extension of steam generator tube inspections to allow the inspections to be conducted after three operating cycles, is available in ADAMS under Accession No. ML20097J188.

B. Submitting Comments Please include Docket ID NRC-2020-0089 in your comment submission.

The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.

If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.

II. Introduction The NRC is considering issuance of an amendment to Renewed Facility Operating License No. NPF-77, issued to Exelon Generation Company, LLC, for operation of the Braidwood Station, Unit No. 2, located in Will County, Illinois.

The proposed amendment would provide a one-time extension of steam generator tube inspections to allow the inspections to be conducted after three operating cycles instead of after the current required two operating cycles.

3

The licensee states that the Centers for Disease Control and Prevention has issued recommendations advising isolation activities (e.g., social distancing, group size limitations, self-quarantining, etc.) to prevent the spread of the COVID-19 Virus. The nature of the steam generator inspections conflicts with the recommendations in that they require workers to be in close proximity to each other in a hot and radiological environment that increases the likelihood of individuals contracting COVID-19 and potentially inducing a rapid spread. Additionally, these inspections require a specialty vendor that maintains unique and complex qualifications. Losing resources due to a virus spread would cause a situation where the proper technical knowledge would not be available to satisfactorily complete this work (minimal 14-day isolation and likely to be more than one individual based on having to work in close proximity for the work).

Based on an initial review , the NRC staff finds that exigent circumstances exist under 10 CFR 50.91(a)(6). The licensee and Commission need to act quickly and time does not permit a 30-day prior comment period because the plant would be prevented from resuming operations following the refueling outage occurring after the current operating cycle that ends in April 2020. Also, the licensee could not have anticipated the social distancing recommendations associated with the public health emergency caused by the COVID-19 virus and made a timely application for the proposed amendment.

Therefore, the NRC staff is providing a 14-day notice period for public comment pursuant to 10 CFR 50.91(a)(6)(i)(A).

Before any issuance of the proposed license amendment, the NRC will need to make the findings required by the Atomic Energy Act of 1954, as amended (the Act), and NRC's regulations.

Pursuant to 50.91(a)(6) of title 10 of the Code of Federal Regulations (10 CFR) for amendments to be granted under exigent circumstances, the NRC has made a 4

proposed determination that the license amendment request involves no significant hazards consideration. Under the NRCs regulations in 10 CFR 50.92, this means that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed one-time change will defer the Steam Generator (SG) inspection to be performed after three operating cycles. This change does not physically change the SGs, the plant or the way the SGs or plant are operated. This change does not change the design of the SG. Inspection frequencies and inspection activities are not an initiator to a Steam Generator tube rupture accident, or any other accident previously evaluated. As a result, the probability of an accident previously evaluated is not significantly increased. The SG tubes inspected by the SG Program continue to be required to meet the SG Program performance criteria and to be capable of performing any functions assumed in the accident analysis. As a result, the consequences of any accident previously evaluated are not significantly increased.

Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The proposed one-time change will defer the Steam Generator (SG) inspection to be performed after three operating cycles. The proposed change does not alter the design function or operation 5

of the SGs or the ability of an SG to perform the design function.

The SG tubes continue to be required to meet the SG Program performance criteria. An analysis has been performed which evaluates all credible failure modes. This analysis resulted in no new or different kind of accident then has been previously evaluated. The proposed change does not create the possibility of a new or different kind of accident due to credible new failure mechanisms, malfunctions, or accident initiators that [were] not considered in the design and licensing bases.

Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No.

The proposed one-time change will defer the Steam Generator (SG) inspection to be performed after three operating cycles. The proposed change does not change any of the controlling values of parameters used to avoid exceeding regulatory or licensing limits.

The proposed change does not affect a design basis or safety limit, or any controlling value for a parameter established in the UFSAR [Updated Final Safety Analysis Report] or the license.

Therefore, the proposed change does not involve a significant reduction in a margin of safety.

The NRC staff has reviewed the licensees analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the license amendment request involves a no significant hazards consideration.

The NRC is seeking public comments on this proposed determination that the license amendment request involves no significant hazards consideration. Any comments received within 14 days after the date of publication of this notice will be considered in making any final determination.

6

Normally, the Commission will not issue the amendment until the expiration of the 14-day notice period. However, if circumstances change during the notice period, such that failure to act in a timely way would result, for example, in prevention of either resumption of operation or shutdown of the facility, the Commission may issue the license amendment before the expiration of the 14-day notice period, provided that its final determination is that the amendment involves no significant hazards consideration.

The final determination will consider all public and State comments received. If the Commission takes this action, it will publish in the Federal Register a notice of issuance.

The Commission expects that the need to take this action will occur very infrequently.

III. Opportunity to Request a Hearing and Petition for Leave to Intervene Within 60 days after the date of publication of this notice, any persons (petitioner) whose interest may be affected by this action may file a request for a hearing and petition for leave to intervene (petition) with respect to the action. Petitions shall be filed in accordance with the Commissions Agency Rules of Practice and Procedure in 10 CFR part 2. Interested persons should consult a current copy of 10 CFR 2.309. The NRCs regulations are accessible electronically from the NRC Library on the NRCs Web site at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed, the Commission or a presiding officer will rule on the petition and, if appropriate, a notice of a hearing will be issued.

As required by 10 CFR 2.309(d) the petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements for standing: (1) the name, address, and telephone number of the petitioner; (2) the nature of the petitioners right to be made a party to the proceeding; (3) the nature and extent of the petitioners property, financial, or other interest in the 7

proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the petitioners interest.

In accordance with 10 CFR 2.309(f), the petition must also set forth the specific contentions which the petitioner seeks to have litigated in the proceeding. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner must provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing. The petitioner must also provide references to the specific sources and documents on which the petitioner intends to rely to support its position on the issue. The petition must include sufficient information to show that a genuine dispute exists with the applicant or licensee on a material issue of law or fact. Contentions must be limited to matters within the scope of the proceeding. The contention must be one which, if proven, would entitle the petitioner to relief. A petitioner who fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at least one contention will not be permitted to participate as a party.

Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene. Parties have the opportunity to participate fully in the conduct of the hearing with respect to resolution of that partys admitted contentions, including the opportunity to present evidence, consistent with the NRCs regulations, policies, and procedures.

Petitions must be filed no later than 60 days from the date of publication of this notice. Petitions and motions for leave to file new or amended contentions that are filed after the deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 10 CFR 8

2.309(c)(1)(i) through (iii). The petition must be filed in accordance with the filing instructions in the Electronic Submissions (E-Filing) section of this document.

If a hearing is requested, and the Commission has not made a final determination on the issue of no significant hazards consideration, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to establish when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, then any hearing held would take place before the issuance of the amendment unless the Commission finds an imminent danger to the health or safety of the public, in which case it will issue an appropriate order or rule under 10 CFR part 2.

A State, local governmental body, Federally-recognized Indian Tribe, or agency thereof, may submit a petition to the Commission to participate as a party under 10 CFR 2.309(h)(1). The petition should state the nature and extent of the petitioners interest in the proceeding. The petition should be submitted to the Commission no later than 60 days from the date of publication of this notice. The petition must be filed in accordance with the filing instructions in the Electronic Submissions (E-Filing) section of this document, and should meet the requirements for petitions set forth in this section, except that under 10 CFR 2.309(h)(2) a State, local governmental body, or Federally-recognized Indian Tribe, or agency thereof does not need to address the standing requirements in 10 CFR 2.309(d) if the facility is located within its boundaries.

9

Alternatively, a State, local governmental body, Federally-recognized Indian Tribe, or agency thereof may participate as a non-party under 10 CFR 2.315(c).

If a hearing is granted, any person who is not a party to the proceeding and is not affiliated with or represented by a party may, at the discretion of the presiding officer, be permitted to make a limited appearance pursuant to the provisions of 10 CFR 2.315(a).

A person making a limited appearance may make an oral or written statement of his or her position on the issues but may not otherwise participate in the proceeding. A limited appearance may be made at any session of the hearing or at any prehearing conference, subject to the limits and conditions as may be imposed by the presiding officer. Details regarding the opportunity to make a limited appearance will be provided by the presiding officer if such sessions are scheduled.

IV. Electronic Submissions (E-Filing)

All documents filed in NRC adjudicatory proceedings, including a request for hearing and petition for leave to intervene (petition), any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities that request to participate under 10 CFR 2.315(c), must be filed in accordance with the NRCs E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR 46562; August 3, 2012). The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Detailed guidance on making electronic submissions may be found in the Guidance for Electronic Submissions to the NRC and on the NRC Web site at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below.

10

To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by e-mail at hearing.docket@nrc.gov, or by telephone at 301-415-1677, to (1) request a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign submissions and access the E-Filing system for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a petition or other adjudicatory document (even in instances in which the participant, or its counsel or representative, already holds an NRC-issued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket.

Information about applying for a digital ID certificate is available on the NRCs public Web site at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit adjudicatory documents. Submissions must be in Portable Document Format (PDF). Additional guidance on PDF submissions is available on the NRCs public Web site at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the time the document is submitted through the NRCs E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The E-Filing system also distributes an e-mail notice that provides access to the document to the NRCs Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the document on 11

those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before adjudicatory documents are filed so that they can obtain access to the documents via the E-Filing system.

A person filing electronically using the NRCs adjudicatory E-Filing system may seek assistance by contacting the NRCs Electronic Filing Help Desk through the Contact Us link located on the NRCs public Web site at https://www.nrc.gov/site-help/e-submittals.html, by e mail to MSHD.Resource@nrc.gov, or by a toll-free call at 1 866-672-7640. The NRC Electronic Filing Help Desk is available between 9 a.m. and 6 p.m., Eastern Time, Monday through Friday, excluding government holidays.

Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing stating why there is good cause for not filing electronically and requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) first class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing adjudicatory documents in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to 12

use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists.

Documents submitted in adjudicatory proceedings will appear in the NRCs electronic hearing docket which is available to the public at https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the Commission or the presiding officer. If you do not have an NRC-issued digital ID certificate as described above, click cancel when the link requests certificates and you will be automatically directed to the NRCs electronic hearing dockets where you will be able to access any publicly available documents in a particular hearing docket. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or personal phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. For example, in some instances, individuals provide home addresses in order to demonstrate proximity to a facility or site. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission.

13

For further details with respect to this action, see the application for license amendment dated April 6, 2020.

Attorney for licensee: Tamra Domeyer, Associate General Counsel, Exelon Generation Company, LLC, 4300 Winfield Road, Warrenville, IL 60555.

NRC Branch Chief: Nancy L. Salgado.

Dated April 10, 2020.

For the Nuclear Regulatory Commission.

Scott P. Wall, Senior Project Manager, Plant Licensing Branch III, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.

14

SUBJECT:

BRAIDWOOD STATION, UNIT 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING (EXIGENT CIRCUMSTANCES) (EPID L-2020-LLA-0069 [COVID-19])

DATED APRIL 10, 2020 DISTRIBUTION:

PUBLIC RidsACRS_MailCTR Resource RidsNrrDorlLpl3 Resource RidsNrrLASRohrer Resource RidsNrrLAJBurkhardt Resource RidsNrrPMBraidwood Resource RidsRgn3MailCenter Resource ADAMS Accession Nos.:

LTR (NRR-106) ML20098F289 FRN (ADM-012) ML20098F215 *via email OFFICE NRR/DORL/LPL3/PM* NRR/DORL/LPL3/LA* OGC (NLO)*

NAME JWiebe SRohrer (JBurkhardt for) MYoung DATE 04/09/2020 04/08/2020 04/09/2020 OFFICE NRR/DORL/LPL3/BC* NRR/DORL/LPL3/PM*

NAME NSalgado JWiebe DATE 04/10/2020 04/10/2020 OFFICIAL AGENCY RECORD