ML20098F141

From kanterella
Jump to navigation Jump to search
Rev 1 to Procedure Bap 200-A2-10, Position Description, Shift Advisor
ML20098F141
Person / Time
Site: Byron  Constellation icon.png
Issue date: 08/20/1984
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20098F127 List:
References
BAP-200-A2-10, NUDOCS 8410020374
Download: ML20098F141 (3)


Text

BAP 200-A2-10 Revision 1.

POSITION DESCRIPTION SHIFT ADVISOR REPORTS TO:

Shift Engineer SUPERVISES:

None FUNCTIONAL RELATIONSHIPS:

Shift Control Room Engineer, Auxiliary Service Foreman, Maintenance Foreman, I.M. Foreman, Electrical Foreman, Tech Staff Engineers, Rad Chem Foreman, Stationmen Foreman.

BASIC FUNCTIONS:

Assist the Shift Engineer with his duties and is responsible for all duties assigned to him by the Shif t Engineer, provide advice and recommendations on plant operations to the Shift Engineer.

PRIMARY RESPONSIBILITIES:

1.

Maintain in-depth knowledge of plant and equipment status by reviewing:

a.

S. E. Shift Turnover Forms b.

Control Room and S. E. Log c.

Main Control Board Lineups 2.

Review, assess, observe and/or assist in significant plant evolutions as directed by the Shift Engineer, including startup procedures.

3.

Assist in resolving Tech Spec related problems.

4.

Participate in shift turnover and shif t briefings.

5.

Monitor procedures in use by the shift.

6.

Assist in other tasks as assigned by the Shif t Engineer.

7.

The Shif t Advisor does not have the autority to order plant shutdown.

PRINCIPAL WORKING RELATIONSHIPS:

1.

Shift Engineer - provide advice on plant evolutions.

2.

Shift Control Room Engineer - assists in coordination of plant evolutions.

3.

Auxiliary Services Foreman - helps coordinate primary and secondary plant evolutions.

4.

Tech Staff Engineers - assists / advises in resolution of plant generic operating problems.

APPROVED 841002y74840924NA AUG S 01984

$" ^ (4410P)

8. O -

r-

BAP 200-A2-10 Revision 1

.5.

Rad Chem Foreman - provides assistance / advice to maintain radiological and chemical specs.

MEASUREMENT YARDSTICKS:

1.

Feedback from maintenance personnel.

2.

Feedback from Shif t Engineer.

3.

Feedback from Shif t operators, 4

h o

2

]

1 APPROVED AUG 201994 B. O. S. R. -(4410P) rwm

Appendix D Revised Shift Advisor Training Program Procedures