Rev 1 to Procedure Bap 200-A2-10, Position Description, Shift Advisor
ML20098F141
Person / Time
Site: Byron  Constellation icon.png
Issue date: 08/20/1984
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20098F127 List:
References
BAP-200-A2-10, NUDOCS 8410020374
Download: ML20098F141 (3)


Text

BAP 200-A2-10 Revision 1.

POSITION DESCRIPTION SHIFT ADVISOR REPORTS TO: Shift Engineer SUPERVISES: None FUNCTIONAL RELATIONSHIPS:

Shift Control Room Engineer, Auxiliary Service Foreman, Maintenance Foreman, I.M. Foreman, Electrical Foreman, Tech Staff Engineers, Rad Chem Foreman, Stationmen Foreman.

BASIC FUNCTIONS:

Assist the Shift Engineer with his duties and is responsible for all duties assigned to him by the Shif t Engineer, provide advice and recommendations on plant operations to the Shift Engineer.

PRIMARY RESPONSIBILITIES:

1. Maintain in-depth knowledge of plant and equipment status by reviewing: -
a. S. E. Shift Turnover Forms
b. Control Room and S. E. Log
c. Main Control Board Lineups
2. Review, assess, observe and/or assist in significant plant evolutions as directed by the Shift Engineer, including startup procedures.
3. Assist in resolving Tech Spec related problems.
4. Participate in shift turnover and shif t briefings.
5. Monitor procedures in use by the shift.
6. Assist in other tasks as assigned by the Shif t Engineer.
7. The Shif t Advisor does not have the autority to order plant shutdown.

PRINCIPAL WORKING RELATIONSHIPS:

1. Shift Engineer - provide advice on plant evolutions.
2. Shift Control Room Engineer - assists in coordination of plant evolutions.
3. Auxiliary Services Foreman - helps coordinate primary and secondary plant evolutions.
4. Tech Staff Engineers - assists / advises in resolution of plant generic operating problems.

APPROVED 841002y74840924NA

$" ^ AUG S 01984 (4410P) 8. O - r-

BAP 200-A2-10 Revision 1

.5. Rad Chem Foreman - provides assistance / advice to maintain radiological and chemical specs.

MEASUREMENT YARDSTICKS:

1. Feedback from maintenance personnel.
2. Feedback from Shif t Engineer.
3. Feedback from Shif t operators, 4

h o

2

]

1 APPROVED AUG 201994 B. O. S. R.

-(4410P) rwm

Appendix D Revised Shift Advisor Training Program Procedures