ML20098E878
| ML20098E878 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 09/13/1984 |
| From: | Kemper J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| CON-#484-378, REF-PT21-84-467-000 OL, PT21-84-467, PT21-84-467-000, SDR-120, NUDOCS 8410020058 | |
| Download: ML20098E878 (1) | |
Text
%4 PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A, PA.19101 SEP 131984 i m ie4i.4so2 JOHN S MEMPER VtCE PRElf DENT assesmess mome Aeso messancee Dr. Thmas Murley, Director United States Nuclear Regulatory Ccnmission
}Q Office of Inspection and Enforcement, Region I 631 Park Avenue King of Prussia, PA 19406
Subject:
Significant Deficiency Report #120 Final Report on Paul Munroe Electric-Hydraulic Valve Actuator Deficiency Linerick Generating Station, Units 1 and 2 NPC Construction Permit Nos. CPPR 106 and 107
References:
- 1) Interim Report, dated Decmber 22, 1983
- 2) Final Report, dated September 4,1984 File:
QUAL 2-10-2 (SDR #120 and 147)
Dear Dr. Murley:
In our Final Report (Reference 2) on the above subject deficiency, it was stated that all valve actuators will have been corrected and tested to assure proper operation by September 14, 1984.
We have now determined that additional time will be needed to emplete the installation and testing of the valve actuators.
It is now expected that all valve actuators will be corrected and tested to assure proper operation by Septm ber 28, 1984.
If there are any questions on this matter, we would be pleased to discuss them with you.
Sincerely, RTM/dnm/09108407 Copy to: Director of Inspection and Enforement United States Nuclear Regulatory Ccnmission Washington, DC 20555 J. Wiggins, Resident NPC Inspector (Limerick) h0 0