ML20098D030
| ML20098D030 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/03/1995 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19311B870 | List: |
| References | |
| NUDOCS 9510110061 | |
| Download: ML20098D030 (1) | |
Text
y Station Suppirt DegetmInt 10 CFR 50 Appendix E Section V
~
V, "PECO ENERGY c
ecco e"e ar o-a "v Nuclear Group Headquarters 965 Chesterbrook Boulevard Wayne, PA 19087-5091 October 3,1995 Docket Nos. 50-277 50 278 Ucense Nos. DPR 44 DPR 56 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Peach Bottom Atomic Power Station, Units 2 and 3 Emergency Plan Implementing Procedures
Dear Sir:
Enclosed is a revision to the Emergency Response Procedures (ERPs) for Peach Bottom Atomic Power Station, Units 2 and 3. The enclosed revision is being submitted in accordance with 10 CFR 50 Appendix E, and 10 CFR 50.4. The following procedure is enclosed:
ERP-110 App.1 Rev.41,
" Emergency Notification Telephone List' ERP 800 Rev. 4,
" Maintenance Team Leader (MTL)"
ERP-810 Rev 8,
" Maintenance Group' in accordance with 10 CFR 2.790(a)(6), we request that the enclosed procedure, ERP-110, Appendix 1, Revision 41, be withheld from public disclosure since it contains personnel names and telephone numbers. Public disclosure of this procedure could constitute an unwarranted invasion of the personal privacy of those employees.
If you have any questions concerning this submittal, or require additionalinformation, please contact us.
Sincerely, f.
G. A. Hunger, Wr.,
g Director - Licensing
'g i
l Enclosure cc:
T. T. Martin, Administrator, Region I, USNRC (2 copies) 8hg W. L. Schmidt, USNRC Senior Resident Inspector, PBAPS i
n
..9510110061 951003 PDR ADOCK 05000277
=
, F_ _.
.. -.