Forwards Rev 27A to Jm Farley Nuclear Plant Security Plan. Encl Withheld
ML20098C928
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/05/1995
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9510100389
Download: ML20098C928 (2)


Text

.

Southern Nuclear Ooorating Company Post Office Box 1295 Birmingnam. Alabama 35201 SAFEGUARDS INFORMATION (TIIIS PAGE IS DECONTROLLED IF ATTACIIMENT I IS REMOVED)

Southern Nudear Operating Company o.v. uo,.y Vice President the Southem electnC System Faney Project October 5, 1995 10 CFR 50.54 Docket Numbers:

50-348 50-364 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant (FNP)

Revision 27A to the FNP Security Plan Ladies and Gentlemen:

In accordance with 10 CFR 50.54(p), Southern Nuclear Operating Company submits Revision 27A to the FNP Security Plan. In accordance with 10 CFR 50.4(b)(4), the signed original and three copies are being sent to the Document Control Desk, and two copies are being sent to the appropriate Regional Office.

On September 7,1995, the NRC issued the final rule for Changes To Nuclear Power Plant Security Requirements Associated With Containment Access Control. Per the rule change, the deletion of this requirement decreases the regulatory burden for nuclear power plants without degradation of physical security, and without compromising the physical protection oflicensed activities against radiological sabotage. Southern Nuclear has reviewed the deletion of posting a guard at the entrance to containment during periods of frequent access and determined that it does not decrease the safeguards effectiveness of the FNP Security Plan. Therefore, by the authority of 10 CFR 50.54(p), to support the Unit 1 Refueling Outage that started on September 16,1995, Revision 27A made changes to the FNP Security Plan associated with containment access control during times of frequent access.

Please note that the information contained in Attachment 1 is safeguards information, and should be withheld from public disclosure in accordance with 10 CFR 73.21.

If there are any questions, please advise.

Respectfully submitted, ji.e f Dave Morey DRC/maf:sp-r-27a. doc cc list and attachment list: See next page.

h h'

SAFEGUARDS INFORMATION g; p -

(THIS4*A#p.,1HS DECONTROLLED IF ATTACHMENT I IS REMOVED) 7 9510100389 951005 PDR ADOCK 05000348 A

. PDR

i SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF NITACHMENT I IS REMOVED)

I U. S. Nuclear Regulatory Commission Page 2 cc:

U. S. Nuclear Regulatorv Commission. Washincton. D.C.

Mr. B. L. Siegel (w/0)

Document Control Desk (w/3)(Nore cons insvernweta/eramien)

U. S. Nuclear Renulatory Commission. Renion II Mr. S. D. Ebneter, Regional Administrator (w/2) (Nors: coatadas safer==*Ia/er== dea)

Mr. T. M. Ross, Senior Resident inspector (w/0)

Attachments

1. Amended Plan Pages (Nore coatadasss/<ravela/ormadoal
2. Description and Justification of Changes
3. Insertion Instructions 1

SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF ATTACHMENT I IS REMOVED)