'Ab?
Telephone (412) 393-6000 Nuclear civision P.O. Box 4 Shippingport, PA 15077-0004 September 14, 1984 U. S. Nuclear Regulatory Commission Affice of Inspection and Enforcement Attn: Mr. Thomas T. Martin, Director Division of Engineering and Technical Programs Region 1 631 Park Avenue King of Prussia, PA 19406
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Inspection Report 84-02 Gentlemen:
Inspection Report 84-02 forwarded a Notice of Violation concerning the lack of controls for the Ten-Year ISI Plan for Beaver Valley Unit 1.
In the April 12,1984 reply to this violation (84-02-01) a Plan of Action was presented which culminated in a September 15, 1984 submittal of a controlled and approved Ten-Year ISI Plan.
l We wish to inform you that several delays have occurred in implementing l
our action plan. These delays have impacted our anticipated completion date of September 15, 1984.
Attached is a status for the Plan of Action items originally submitted.
The initial essessment of the work scope has been completed. This assessment revealed that the scope of work is significantly larger than anticipated. As a first step, applicable administrative and implementing procedures have been prepared and are expected to be approved and in effect by October 15, 1984.
These new procedures will be used to control inspections during the Fourth Refueling Outage (4R).
f However, due to the unanticipated increase in the scope of work, a DLC-controlled Ten-Year ISI Plan cannot be compiled at this time.
An inspection plan for those item: requiring inspection during the 4R has been generated by Duquesne Light Company.
This 4R inspection plan will receive appropriate review and approval prior to implementation. The information 8409250358 840914 PDR ADOCK 05000334 i
b()\\
G PDR 4
I Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Inspection Report 84-02 Page 2 obtained during 4R will be incorporated into the compilation of the DLC-controlled Ten-Year Plan.
This document will be completed and approved prior to the Fifth Refueling Outage.
Therefore, we respectfully request an extension until October 15, 1984 for the completion of reviews and procedures and until the beginning of the Fifth Refueling. Outage for completion and submittal of an approved DLC-controlled Ten-Year ISI Plan.
If you have any questions concerning this request, please contact my office.
Very truly yours, J.ICarey Vice President, Nuclear i
Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 Director, Safety Evaluation & Control Virginia Electric & Power Company P.O. Box 26666 One James River Plaza Richmond, VA 23261
l.,.[ f 4 '
My d h 4 s W f Gy,n.
ff,sf G 60L,.'7%f 7.,
deif.4, ". !;-i.
6 N. X,
~
[,hj.
i.
f*
abp
~
e
,, l,
.?
. a).-
..u -
.m. o
-h Status
,J-; ' f y
7:.
7> '
~
Plan of Action for Ten-Year ISI Plan PW
~ ' r j, kh.
4 A.
Existing Ten-Year ISI Plan MW s.#
% i3 e g
w.c..,
1.
The vendor's revised and updated Ten-Year Plan has been obtained.
i ?.U.i..
9m-y(7..
Q, A
B.
DLC Management
- t.,. f.
g'.
_., g, < v w
f 1.
A Nuclear Group Directive (NGD 25) has been written and approved Ke.-7
~l delineating the guidelines for the administration of the BVPS Unit
'.d"'
[g-
- 1 ISI Program (excluding Pumps and Valves).
V2j D?:,.L n.
O.<.
2.
Proposed revisions to the existing Directives (NGD 2 & 10) to reflect the requirements of the ISI Program have been prepared for U
9 review and issuance.
Kp../
&N
~;;.
3.
A draft revision to the QA Manual (0P-11) to reflect the adminis-MM trative scope of the ISI Program described in Nuclear Group Direc-ll4.s-(. ".
tive 25 has been prepared for review and approval.
gk-4.
Approval of the finalized DLC-controlled Ten-Year Plan and submit-3 ll ~
I,('.. i li J ;A tal to the NRC will occur prior to the Fifth Refueling Outage.
sor-
.s m;
C.
DLC-Controlled Ten-Year ISI Plan 9"
g 3 *,.
1 W
7 1.
A unique controlled set of isometric drawings which reflect plant
- h'i& '
p.
..lF s.;
modifications has been completed.
Review and correction of incon-
- ft N.
'.', 7 sistencies is ongoing and will be complete by October 15, 1984.
pa.,.,
/I[g [1 2.
The review of plant modifications relevant to Class I, II, and III
,f-piping to ensure their inclusion into the CLC Ten-Year Plan is gc 4,;
complete.
- sf
, '.t.
., t
'5 3.
Implementing procedures have been draf ted for the administrative g
f control of the Ten-Year ISI Plan. These procedures are expected to 4
e
( e.
be reviewed and approved by October 15, 1984.
.N.., $.
s f
4.
Compilation of the DLC-controlled Ten-Year ISI Plan is in progress.
. !..%y anticipated and the I
f4 The scope of the work is larger than originally (used as an irforma-O task of integrating the vendor's information i
y tion source) is extremely time consuming since it must be g
o:
translated into DLC fonnat for purposes of document control.
y j. '
.I; An inspection plan for those items requiring inspection during the h v.-.)
' f' i Fourth Refueling Outage has been generated by DLC.
This plan
.,j.( l.
i-encompasses those inspections required by the Code.
(.
b; 5.
The 4R inspection plan will receive appropriate review and approval
.q; prior to implementation.
.44E'
-
- f-s J.
y.g.
,;A,
y
- y;;s-
. gs p:. +
%:$ ; f
, ;.Q $ <:qi.
W:;.[ y..7 y. y y f : y. Q ";.
'l yt ( f,. % j } :[.'..[. _, -[., j g, j _ }-Q 3v*;y. f y w.
e 4
4 4
ge b
,,,