Forwards GL Parkinson,Bechtel 840918 Proposed Administrative Improvements in Reporting Aspects of Program for Independent Design Review.Proposal Found Satisfactory.Concurrence Sought
ML20098A931
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/19/1984
From: Hall D
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
0982-6, 982-6, L40-84(09-19)-6, L40-84(9-19)-6, U-0724, U-724, NUDOCS 8409250317
Download: ML20098A931 (7)


Text

I I

U-0724 L40-84 (09-19)-6 l

0982-6

/LLINDIS POWER COMPANY

{,;y- )

CLINTCN OER STATICN. P.o. Box 678. cLINTON. ILLINots 61727 I'*

September 19, 1984

. I Docket 50-461

' i 4

i t

g Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer j.

Chief, Licensing Branch No. 2 i:

Division of Licensing U. S. Nuclear Regulatory Commission f.;

Washington,'D. C.

20555 U

Schject: Clinton Power Station, Unit 1 l,

Independent Design Review

Dear Mr. Schwencer:

We have received the attached Bechtel letter of September 18, 1984, (from.Mr. G. L. Parkinson to Mr. J. D. Geier) with proposed administrative improvements in the reporting aspects of the Program Plan for the Clinton Independent Design Review.

t We have reviewed Bechtel's proposal and find it satisfactory. We would appreciate receiving your concurrence, j

S erely yours, s.

D.

. Hall Vice President i

DPH:1m encl.

cc: See attached distribution list 1,.

.. g IC M g o 793, i

N u.a,,

.:Q 8409250317 840919 1

h PDR ADOCK 05000461 6

t l

A PDR

\\

l

..h._

j

~

~

g;

17- 0724 L40- 84 (09-19)-6 0982-6 Clinton Power Station Independent Design Review Standard Distribution List

r
N jI Director of Nuclear Reactor Regulation Richard J. Goddard, Esq.

H-

' Attn: '.Mr. A. Schwencer, Chief Office of the Legal Director

.h' Licensing Branch No. 2 U. S. Nuclear Regulatory Commission it[

Division of Licensing Washington, D.C.

20555 U. S.. Nuclear Regulatory Commission ip Washington, D.C.

20555 Don Ecchison

.g Director, Illinois Department of Ti James G. Keppler Nuclear Safety II Regional Administrator 1035 Outer Park Drive j'

Region.III Springfield, Illinois 62704 d

U. S. Nuclear Regulatory Commission

-799 Roosevelt Road Allen Samelson, Esq.

[

Glen Ellyn, Illinois 60137 Assistant Attorney General T:

Environmental Control Division Byron Siegel-Southern Region Clinton Licensing Project Manager 500 South Second Street

. Mail' Code 416 Springfield, Illinois 62706 U.-S. Nuclear Regulatory Commission Washington, D.C.

20555 Jean Foy Spokesperson, Prairie Alliance Fred Christianson 511 W. Nevada Mail Code V-690 Urbana, Illinois 61801 ENRC Resident Office Clinton Power Station Richard Hubbard R.R.f3, Box 228 MHB Technical Associates y

Clinton, Illinois 61727 1723 Hamilton Avenue -

d Suite K James L. Milhosn San. Jose, California 95125 lSection Chief, Licensing Section,

?l!!

Quality Assurance Branch Gordon L. Parkinson l:

Office of Inspection and Enforcement Bechtel Power Corporation Mail Stop EWS - 305A Fifty Beal Street U. S. Nuclear Regulatory Commission P. O. Box 3965 P

Washington, D.C.

20555 San Francisco, California 94119 Richard C. Knop Roger Heider

.Section Chief

.Sargent & Lundy Engineers Projects Section 1-C 55 East Monroe Street

U. S. Nuclear Regulatory Commission

-Chicago, Illinois 60603

~r 799 Roosevelt Road

'{'

Glen Ellyn, Illinois 60137 L

l

-. ~. - -

N,

.t.-

i Bechtel Power Corporation u

_c~.

riny v. e sumi Sess >tencsctL camomas 0-Me# netrrrrrt P.0 Sov30:15, re F ranc'r.co. CA 94110

i:

4: h,,

September 18,1S84 lII Bt.I-15 L

if II Hr. J. D'. Geter

},

Illinois Power company

)

500 South 27th Street-

j

Decatur, 1111001s 52525 i

o

Subject:

Clinton Power Station, Independent Design Review

~ Illinois Power Company - Job Ho. 15478-003

!_0R Schedule and Planning

~

Dear Mr. Galer:

b We have reviewed the schedule for completion of the Independent Design Review (IDR) for the Clinton Power Station in light of the changes in scope made in the process of obtaining the recent approval of the Program Plan. Without altering the scope technical content or level of detail of the approved Plan, we propose Implementation as described below, o

'We are currently planning our effort, including any required nanpower

e l;

increases, so that we will he able to issue the Final Report i

approximately December 15, 1984, Although we would not issue a previous l

" draft" Report, we would plan to receive coments frec Illinois Power campany (IP), the Nuclear Regulatory Comission (NRC) and the public on l;.

the Final Report and to respond to such caments promptly.. The response will include, if necessary, ira le that we be able to cmilete suchsu piements and/or rev Report. We think it is des ll response by January 15, 1985. Accordingly, we suggest t1at a public li stating be held on the Final Report approxir.ately two weeks after it is l :'

1ssued, and that any Written coments be submitted to us within a week after the public meeting.

i-In order that IP, the HRC and the puhlic be able to review the Final i;

Report prcmptly, M recommend an ir. proved mechanism for making available information concerning the progress of the 10R. Instead of the single interim report contemplated by the Prograin Plan, we plan to provide three interim reports at approximately monthly intervals beginning October 1, R-1984.

t l

l L

j

Bechtel Power Corporation Mr. J. D. Gator Septsaber 18, 1984 Page TWO i-

~!:

r The outline of such monthly reports is attached. As you will note each

.ij' 4

report will contain a narrative description of the status of each of the

'li discrete tasks being performed and Appendices A and B will contain 1;

detailed infomation as to the results of the IDR effort to data, i.e., a ll summary of all Potential Observation Reports and copies of each

'[

_ Observation Report and resolution thereof. The basic purpose of these interim reports will be to provide meaningful information, while the IDR j

is takihg place, as to both the manner in which the IDR is being

?

wrformed and the specific details of any deficiencies being identified O

y Bechtel. This should enable IP and the NRC to provide additional guidance, as appropriate, during the condact of the IDR to assure the quality of the final product. It should also greatly facilitate the abflity of IP, NRC and the public to review the Final Report within the i

-W period we suggest, i-To assure that the objectives described abine are met, we also propose that a public meeting be scheduled approximately 10 days after the isguance of each interim report.

'de 'believe that the foreboing steps will irtprove the ability of IP, NRC and the public to contri ute constructively to techtel's perforsonce of the IDR. We would welecce your ccurents and suggestions, 7

7

-j.

Ye truly yours, i

M+

F t

Charles Dick Programs Manager

i, CD
see o

' Service List (See attached Distribution List) l; cet i

I d

0107C m

e r

-*a

-e+-+

ev-

  • .e-..

e i.ee-g-a.

g ee c-

.. s

^ -

e DRAFT DUT1.INE I:

i Progress Report i i Clinton Station IDR di i;-

M 1, Simnary

'jl Highlights of matters covered below Z, General j'

Introduction jI

Background

7 Activities li Observations I

3. Program status Task 1: Design Requirements Tast 2: Design Adequacy Task 3: Design Process Task 4: Ceneral Assessment Horizontal Review Walkdowns t
4. Veetings

~'I

5. Document.s Revtewed Appendix A - Potential Observation Resort Sutnmary 1

i B - Observation Re i

C - (Other Items) ports and Resolutions 3:

f.f

,Ii

~

. -l.

i 8

4

?

e 0077C CWD 9/10/84-1 e

.e4w w.

ge gu.

.-ewe

=

wa..-

7-0931 L40-84(08-27)L Clinton Power Station Independent Design Review Standard Distribution List

.c, j

Director of Nuclear Rasetor Rasuistion Don Etchison Atta Mr. A. $chwencer, Chief Director, U linois Depart.nent of Licensing Branch 50. 2 Nuclear Safsty

!)! !

i

-Division of Licsasing 1035 Outer Park Drive

?

O. S. Ma 9 =e Regulatory Comatission Springfisid, Ininois 62704 l;i,

Washington, D.C.

20555 Allen Samelson Esq.

I. '.

James 0. Rappler Assistant Attocney General ji Regional Administrator Environmental Control Division Southern Region 1;[

Region III 500 South Second Straat

^

U. S. Rucisar Regulatory Cossaission

-799 Ecosevelt Road Springfield, Illinois 62706

l. ?

Clan Ellyn, Ulinois 60137 Jean Foy Byrna Siegel 8pokespersen, Prairie Alliance Clinton Licensing Prt. ject Managar 511 W. Nevada Mail Code 416 Urbana, I ninois $1601

^

U. S. Nuclaar Regulatory Commission Washington, D. C. 20555 Richard Bubbard ME3 Technical Associatas Fred Christianson 1723 Hamilton Avenue Mail Code V-690 Suite K I

-NRC Residenc Office San Jose, California 95125 Clinton Power Station R.R. f3. Box 228 Roger Haider Clinton. T111nois 61727 Sargent & Lundy Engineers D

55 East Monroe Street i

James L. M11hoan Chiesso, Iu incia 60603 Section Chist, Licensing section Quality Assuranca Branch William C. Cerstner Office of Inspection and Enforcement Executive Vice President t

- Mail 5 top EWS - 303A Illinois Power Company U. 5. Nucisar Regulatory Corsaission 500 3. 27th' Street

[

Washington, D.C.

20555 Deestur, Ininois 62325 tj Richard C. Enop Donald P. Hall Section Chiaf Vica President Projects Section 1-C Illinois Power Company

- U. S. Nuclear Regulatory Commission Clinton Power Statron 799 Roosevelt Road P. O. Box 678 Clasi111yn. Ininois 60137 Clinton, I111acis 61727 Richard J. Coddard. Esq.

Julins D. Geier Asaistant to the Vice President Office of the LaSal Director

,l U. S. Nuclear Regulatory Commission Illinois Power Company Washington, D.C.

20555 Clinton Power station P. O. Boz 675 Clinton, nitnois '61727 m.a. m

- e w, m -+

-dWT M+

e#--m aw + h# ee4.ber seuih p=+

wp.,>.,

7_

. g gg m, gg,,_m

.,,g

?

w-a--ere+-tg gg------wwg.gg9-e

-,-.-,-y-.-,.

pmaw+-

g

---.,-g,,,,,-%

,., -g,--y--y o,e-spi,-g %mww emvei,y--o,eeye--e, - -

pe we.

v

,.www.w,.,,,,,ysw--w-.e-ww--w,-p-a,ee-ev-,--

i F-0921 14044(08-27)

Daniel I, b rborn Director, Licanaing and Nuclear configuration l

Clinton Power Station P. C. Rex 627 Clinton, Illinois 61727 i,

Sheldon A. Zabal, Esq.

Schiff Hardin fr Waita 7200 saars Tower Chicago. Illinois 60606 Charles D. Fox, Esq.

Schiff Hartin & Waits 7200 saars Tower Chicago, Illinois 60606 9

Maurica AXsirad Newman & Holtzinger, P.C.

1023 Connecticut Avenue, N.W.

Washington. D.C.

20036

. F.obert Brodsky Basic Enargy Technology Associates. Inc.

Rosslyn Center, suite 5:s 1700 N. Moora Streat Arlington,' Virginia 22209 after 9/24/S4:

5031-A Backlick Rd.

F, O. Box 1207 Annandale. Virginia 22003 l ;

i l-9 em e

e l'

O e

i

=eeng.++m.

ee

    • =

= =*

e

=g.e 4.,q

.em e

e e -m

<y S.e-#ee=

6% P ep*W99

  • Eu'***

1-y',r y

y,-

pm-----,---m-

,,.g37g.p,

,,,.,.,r--gy,,-.

,,*,,,,,,,,,,.,,,g.,.g.,,,,,,-,g,,,

-.twwww ego--=&,e-ww

-