Responds to NRC Re Violations Noted in Insp Repts 50-424/84-17 & 50-425/84-17.Corrective Actions: Pullman/Kenith-Fortson Welding Technique Sheets Reviewed & Revised to Reflect Requirements of Welding Procedures
ML20098A439
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/13/1984
From: Foster D
GEORGIA POWER CO.
To: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20098A431 List:
References
GN-405, NUDOCS 8409250011
Download: ML20098A439 (2)


Text

..=

r. ,, x, , c. e wd

. R: 1""e3%*"' &#

Waynesboro,'Georg'a 30830

  1. - Tetephone 404 554 9961. Ext 3360
  • 404 724 8114. Emt. 3360 b

D. o. Foster Vice President and Protect General Manager F)e southem eWT."C sr Me'n Vogt!e Prciect August 13, 1984 United States Nuclear Regulatory Commission Office of Inspection and Enforcement File: X7BG10 Region II - Suite 3100 Log: GN-405 101 Marietta Street Atlanta, Georgia 30303

Reference:

50-424/84-17, 50-425/84-17 Attention: Mr. R. C. Lewis The Georgia Power Company wishes to submit the following information concerning the violations discussed in your inspection report 50-424/84-17 and 50-425/84-17:

Violation 50-424, 425/84-17-01, " Failure to Adequately Control Welding"

- Severity Level IV.

(1) Georgia Power Company acknowledges the discrepancies identified in the violation.

(2) The discrepancies identified by the NRC inspector associated with Pullman /Kenith-Fortson (P/K-F) welding technique sheets are attributed to a failure to adequately control the preparation, distribution, and review of the sheets. As a result, technique sheets were not properly updated with the latest information.

It is not practical to include all the requirements of AWS D1.1 in welding procedure specifications. Welders working on the Vogtle Project are generally familiar with the standard limitations on peening; therefore, it was not considered necessary to provide guidance for peening in procedural form.

(3) The following actions have been taken to correct the discrepancies identified in the violation:

a. All P/K-F welding technique sheets have been reviewed and revised to accurately reflect the requirements of P/K-F welding procedures. Required shield gas flow rates were added to applicable technique sheets and erroneous welding current information was corrected.

8409250011 840905 gDRADOCK 05000424 PDR

+., ,

y .- .

Mr. R. C. Lewis 50-424/84-17, 50-425/84-17 Page Two

b. On July 10, 1984, in the presence of NRC Region II Inspec-tors J. L. Coley and R. W. Newsome, three test welds were performed on thin guage (#18) sheet metal. One of the welds was performed using a welding current of 50 amps, which is lower than the current specified by WPS-300 of the erroneous technique sheet. The other test welds were perfonned using a higher shield gas flow rate (65 CFH) than noted in the violation. All three test welds yielded satisfactory results. Based on the results of this test, it is highly unlikely that the use of the outdated technique sheets has had an adverse affect on the quality of sheet metal welds.
c. Welding Procedure Specification 129 is to be used in conjunction with General Weld Standard GWS-ST-1. GWS-ST-1 is being revised to provide welders with guidance for peening as required in AWS D1.1, Paragraph 3.1.

(4) To ensure that further violations do not occur, effective dates are now being applied to welding technique sheets to correspond with the effective dates on the Welding Procedure Specifications.

, When Welding Procedure Specifications are revised, the applicable technique sheets will be reviewed against the revised information, revised if r.ecessary, and redistributed ~ with a new effective date.

(5) All corrective actions will be completed and fuil compliance with applicable regulatory requirements will be achieved by September 8, 1984.

This response contains no proprietary information and may be placed in the NRC Public Document Room.

Your truly

/

< r D. O. Foster REF/D0F/tdm xc: U. S. Nuclear Regulatory Commission Attn: ' Victor J. Stello, Jr. , Director Office of Inspection and Enforcement Washington, D. C. 20555 R. J. Kelly D. E. Dutton J. A. Bailey L. T. Gucwa R. E. Conway W. F. Sanders '

0. Batum M. Malcom G. F. Head R. H. Pinson H. H. Gregory G. Bockhold J. T.' Beckham B. M. Guthrie C. W. Hayes P. D. Rice G. A. McCarley R.-A. Thomas E. D. Groover J. L. Vota W. T. Nickerson C. S. McCall

.-