. MMv - - - -. _ _.~--
p, a. ogwa gg Msmng Address N{.Q" ?
9
, ' Alabama Power Company i%,
L -
600 North 18th Street
?
- [.
- Post Office Box 2641 2 W
' 7/ W I
[
Telephone 205 783-6090
.._p R. P. Mcdonald
?.W Senior Vice President-9xdh.gf h kfjh 2[ p}*
I Alabama Power
- %,Jr43 E
Nucicar Generation
'g*
Fhntridge Bwiding h fh
?
t!e sout?:r.m en it c n ue-ru August 21, 1984 TE Q E
)/gk.i
%%M L
Docket No. 50-348
/
{
f Docket No. 50-364 b
iMA Mr. D. M. Verrelli
. ?.gu U. S. Nuclear Regulatory Commission 1,.; - TJ 7
F Region II
- -W4 101 Marietta Street, N.W.
M.. [
Suite 3100 Atlanta, GA 30303 q,. $. ;
=
- .;..g
.e.
n..
SUBJECT:
J. M. Farley Nuclear Plant NRC Inspection of 7 ;A June 11 - July 10,1984 RE:
Report Numbers 50-348/84-17 h.:
50-364/84-17 l.,.c 0,
.7
.;; % ~..'
2
Dear Mr. Verrelli:
. r j.Q: ~
!, y;'<
i This letter refers to the violation, cited in the subject inspection fj reports, which states:
a,c-o E
"The following violations were identified during an
.ra inspection conducted on June 11 - July 10,1984. The
- . A "
Severity Levels were assigned in accordance with the s.c y NRC Enforcement Policy (10 CFR Part 2, Appendix C).
j ;i' n w..
Technical Specification 6.8.1 requires that written (0 i
=
procedures shall be established, and implemented for "s
=
surveillance, administrative and calibration procedures.
4 7.
=
E
- 1.i W Contrary to the above, the licensee did not adequately
-f:9 C establish and implement surveillance, administrative
%J.
- and calibration procedures as follows:
?. .- !
4
,h
.q 1)
Although FNP-0-AP-14 requires the removal of hold tags and f 0f,
repositioning of control devices in a sequence specified by a
. y tagging operations order, a systems operator positioned a
..2*l valve out of the specified sequence for tagging order number
.j'k -
84-0461-2.
,.,-e;
' i..,
y- :;%..,.
8409240487 840904 2 '.);~
PDR ADOCK 05000348 x
G PDR
- f.
J ' N,
=
.m si E
Nr. D. M. Verrelli m
August 21, 1984 Page Two 2)
FNP-1-SOP-22.0 had an inadequate system checklist in that the turbine driven auxiliary feedwater pump speed y
control was not included.
r 3)
Instrument maintenance procedures were inadequate in that f
independent verification of transmitter valve position C
upon return to service was not required.
3 4)
Instrument maintenance procedures were inadequate in that valves manipulated for transmitter calibrations were not f
identified in the procedure.
This is a Severity Level IV violation (Supplement I)."
{2
-r Admission or Denial L
The above violation occurred as described in the subject reports.
j Reason for Violation E
-g t__
1)
The first part of this violation was caused by a personnel error in that a System Operator performed a sequence on the Tagging Operations Order improperly.
2)
The second part of this violation was caused by a procedural deficiency in that the speed controller position of the turbine driven auxiliary feedwater pump was not specified by FNP-1-S0P-22.0. This case is unique in that the controller may be repositioned to slightly below the full speed position to produce rated flow as verified in an STP but upon return to service the controller needs to be returned to the full speed position in readiness for automatic operation.
3)
The third part of the violation was caused by a procedural k.
deficiency in that procedure FNP-2-IMP-206.8 failed to require i
an independent verification of the transmitter valve position.
4)
The fourth part of the violation was also caused by a procedural deficiency in that instrument maintenance procedures failed to address the second isolation valves used for double valve protection.
j' m
e
Mr. D. M. Verrelli August 21,'1984 Page Three Corrective Action Taken and Results Achieved 1)
The Tagging Order was independently verified. The affected valves were in their proper positions.
2)
Procedures FNP-1-SOP-22.0, FNP-2-SOP-22.0, FNP-1-STP-22.0, and FNP-2-STP-22.0 were changed to include turbine driven auxiliary feedwater pump speed controller position.
3)
Procedure FNP-2-IMP-206.8 was changed to require independent verifications of valve positions.
4)
Procedure FNP-0-IMP-0, which is referenced by FNP-2-IMP-206.8, was revised to define the use of the second isolation valve as an integral part of the three valve manifold.
Corrective Steps Taken to Avoid Further Violations 1)
The person who improperly performed the Tagging Order was disciplined.
2)
The procedures were changed as described above to include the speed controller position.
3)
A review of safety-related instrument maintenance procedures will be conducted to determine which procedures need to be revised for independent verification. This review is scheduled to be completed by October 31, 1984.
4)
Procedure FNP-0-IMP-0 was revised to explain the use of the second isolation valves used for double valve protection. All safety-related instrument maintenance procedures will also be revised to include these valves where necessary.
NOTE FOR 3) AND 4):
In addition to the corrective steps stated in 3) and 4) above, a complete review of all Instrument and Control administrative and technical procedures will be performed with the intent of unifying, and upgrading where required, independent inspection requirements and inspection hold-point requirements.
t l
Mr. ' D. M. Verrelli August 21, 1984 Page Four Date of Full Compliance December 31', 1985 Af firmation I affirm that this response -is true and complete to the best of my knowledge, information and belief.
The information contained in this letter is not considered to be of a-proprietary nature.
Yours very truly, l
0 R. P. Mcdonald RPM /DSM: sam l
. -. -