SS1
- 2 n
/
~
consumers
~
s Power
/
x u=-
C0m HR
/
Midland Project Office oaneral offices: 1945 West Parnell Road, Jackson, MI 49201 * (517) 788-0774 August 28, 1984 Mr John J Harrison, Chief Midland Project Section U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER y
MIDLAND DOCKET NOS 50-329, 50-330 SOILS WORK SHUTDOWN FILE 0485.16, 1300 SERIAL CSC-8013
REFERENCE:
JAMooney to JJHarrison letter, Serial CSC-7997, Dated July 26, 1984.
Per August 16, 1984 conversation between R. Wieland of CPCo and Dr. R. Landsman of NRC Region III, CPCo is performing the following work in connection with soils work shutdown.
These activities are in addition to the activities noted in our referenced letter of July 26, 1984.
1.
The surcharge on the freezewall monitoring pits is being removed.
2.
The grillage steel in the loaded pits will remain in place.
3.
The pits are being filled with loose backfill and designated as temporary fill areas.
4.
Elevation readings of utility locations crossing freezewall monitoring pits will be taken prior to temporary backfilling of the pits.
Dr. Landsman concurred with performance of this work as part of the soils work shutdown.
If you have any questions, please contact R. Wieland at 839-6757.
,(1 'klbW PDR ADOCK 05000329 8409240432 840828 JAM /RHW/klw PDR CC Administrator, Region III DSHood, NRR Project Manager, Washington Midland Project Manager, Region III Midland Resident Inspector, Midland OC0884-0004A-CN01