Forwards Info to Close Unresolved Items Identified at 840806 Exit Meeting for NRC Insp 84-24.Current Rulemaking Should Be Concluded Prior to Conclusion That as Found Leakage Should Be Monitored
ML20098A077
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/07/1984
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20098A079 List:
References
GOVT-1-1, OL, NUDOCS 8409240269
Download: ML20098A077 (2)


Text

o 2840815030 PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.191o1 bl JOHN S. KEMPER

.....I ' " _" 5 " E..

Mr. Richard W. Starostecki Director, Division of Project and Resident Programs, Region I United States Nuclear Regulatory Ccanission 631 Park Avenue King of Prussia, PA 19406

Subject:

Limerick Generating Staticm, Unit 1 Resolution of Open Items Filer GOVr 1-1 Dear Mr. Starostecki The following information is subnitted to close the Unresolval Items frm the exit meeting held on August 6,1984 for PGC Inspection

  1. 84 SIT & ILRT.

NRC Item No.

Subject / Resolution 84-42*

Disposition of packing leaks on HV-57-103,113, 122, 125:

During the performance of the ILRT, packing leaks in theso valves were sealed by injecting a tmporary scalant material into their packing glands.

A permanent, testable fix has been developed and will be inplemented prior to fuel load (see FCR-A40572).

This itcm will be resolved upon empletion of this work.

84-42*

Programs for nonitoring "as found" Icakage and assessing IIRT during operation:

Our review of NRC requiroments and ICS ommitments regarding integrated and local leak rate tests has not uncovered a requirment for monitoring "as found" leakage.

We believe that a draft revision to 10CFR50, Appendix J recently transnitted to ACRS for review incorporates a requirertent for "as found" leakage monitoring (reference G. A. Arlotto, NRC, to R. F. Fraley, ACRS, dated May 18, 1984).

)

,Q9240269gooon2 40907 aDoca o y

=

p

,p 4

2-2840815030 The BWR Owner's Group has been studying this issue and has filed canents with the NRC staff (reference BWROG letter to D. G. Eisenhut, NRC, dated March 4, 1983).

PECo has also subnitted its connants (reference V. S. Boyer, PECo, letter to E. A. Arlotto, NRC, dated July 6,1984).

We believe that the current rulemaking should be concluded prior to a conclusion that "as found" leakage should be monitored at Limerick.

(

In the interim, we plan to inplanent the following program:

4 1)

Report pre-and post-repair leak rate test results in accordance with ANSI /ANS 56.8-1981

]

Paragraph 3.2.6, and 2) adjust ILFT test results to account for

" required local leakage rate additions" as defined in ANSI /ANS 56.8-1981 Paragraphs 3.2.1.4 and 3.2.1.5, and 3) retain " backup data" regarding local leak rate tests in accordance with ANSI /ANS 56.8 Paragraph 5.8.8(1).

Please advise us if a meeting is needed to discuss these items.

NRC Inspection Report not yet received.

-l Sincerely, L)k%_n L d