ML20097J513

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Lack of Full Penetration Welds on Some Pullman Const Industries HVAC Duct Supports.Initially Reported on 840614.AE Evaluation Will Be Completed in mid- Sept 1984.Next Rept Expected by 840921
ML20097J513
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/24/1984
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GN-408, NUDOCS 8409210273
Download: ML20097J513 (1)


Text

7..-

Georg'a Power Company Route 2. Dox 299A Waynesboro Georgia 30830 Telephone 404 554-9961, Ext. 3360 DRP 404 724-8114. Ext. 360

}(( g G 30 P f.

Georgia Power D. O. Foste,

$e'n*eNa*n"a'g*e" August 24, 1984

'be southem e'ecc srstem Vogtle Project United States Nuclear Regulatory Commission Office of Inspection and Enforcement File:

X7BG03-M65 Region II - Suite 3100 Log:

GN-408 101 Marietta Street Atlanta, Georgia 30303

Reference:

Vogtle Electric Generating Plant-Units 1 and 2, 50-424; 50-425; Pullman Construction Industries Duct Support Shop Welds; GN-388, dated July 13, 1984.

. Attention: Mr. James P. O'Reilly On June 14, 1984, Mr. R. E. Folker of Georgia Power Company infomed Mr.

V.

Panciera of the USNRC of a potentially significant deficiency concerning the lack of full penetration welds on some HVAC duct supports.

In letter GN-388 dated July 13, 1984, Georgia Power Company also advised the NRC that an interim report would be submitted on or about August 29, 1984, that would furnish an expected completion date for the evaluation of this concern.

At this time, Georgia Power Company has been advised by the architect-engineer that the evaluation and review of this subject will be completed in mid-September,1984.

Georgia Power Company will notify the NRC of the results of this evaluation by September 21, 1984.

This response contains no proprietary information and may be placed in the NRC Public Document Room.

Yours truly, kOr$b D. O. Foster #

REF/D0F/tdm xc:

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555 R. J. Kelly D. E. Dutton J. A. Bailey L. T. Gucwa R. E. Conway W. F. Sanders

0. Batum M. Malcom G. F. Head R. H. Pinson H. H. Gregory G. Bockhold J. T. Beckham B. M. Guthrie W. T. Nickerson P. D. Rice R. A. Thomas E. D. Groover J. L. Vota C. S. McCall G. A. McCarley C. E. Belflower DgCIrn gg'.

e409210273 e40824 PDR ADOCK 05000424 lIlg y PDR S

JEW- - -

.