ML20097H791
| ML20097H791 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 08/24/1984 |
| From: | Danese F NAC INTERNATIONAL INC. (FORMERLY NUCLEAR ASSURANCE |
| To: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| 24047, NUDOCS 8409200505 | |
| Download: ML20097H791 (1) | |
Text
'"
Nu 1:ar Assurance Corpor1 tion 5720 Peachtree Parkway j - 7~3 j' Norcross. Georg'a 30092 "A,
(404) 447-1144
,x
^/)y N.
Telex: 6827020 U\\
ry c y1 Wern0ergstrasse 9 h Cb. n, m.O 'l C.L) 800: Zorr):. s.w:zerland v-1-470844 Q
Telex: 67275
- y
- y u.s.recttu reuraub Mronly ny c.g'!g v
August 24, 1984 FLD/84/152/ETS
_ _. ~..
/f Wi.!
A' ',
N,]s Notification:
W/15 p.y' ca:aTo so ~ ).6 c.
Director, Region I
/
LN0
\\-}
orvo o 2. 66y. goy - z,z y b
g g 3--
U.S. Nuciear Regulatory Commission l.
3..,.,
Office of Inspection and Enforcemen S'd
'~40L 0 34 - l _Sl 631 Park Avenue N
153
/2t King of Prussia, PA 19406 O
"M N
/w/
v,y Czecun,c s s
'.%-4(N
,)
\\
\\s/ JN.
Attn:
Mr. G. C. Smith x; -O.
Dear Sir:
The Nuclear Assurance Corporation, on behalf of the Wisconsin Electric Power Company, hereby makes notification of the continuation of spent fuel shipments from the West Valley facility of West Valley Nuclear Services to the Point Beach Nuclear Station of Wisconsin Electric Power Company.
The schedule information for these continuing shipments is enclosed as safeguards information.
This is the fifteenth notification for this series of 114 shipments and is made in accordance with the requirements of 10 CFR 73.37.
Sincerely, NUCLEAR ASSURANCE CORPORATION g
Es4L s
F. L. Danese Manager, Cask Operations 7 cms =pfg?3 t.2 i:,, - (
a c4~-
~
FLD:pwh cc:
Director, Region III Material Transfer SG Licensing U.S. Nuclear Regulatory Commission Branch Office of Inspection and Enforcement Division of Safeguards 799 Roosevelt Road U.S. Nuclear Regulatory Commission Glen Ellyn, IL 60137 Washington, D.C.
20555 Attn:
Mr. Charles Hillman 8409200505 840824 PDR ADOCK 05000266 F
PDR Md17
---