ML20097H295
| ML20097H295 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/18/1992 |
| From: | John Miller ALABAMA POWER CO., BALCH & BINGHAM (FORMERLY BALCH, BINGHAM, BAKER |
| To: | Bollwerk G, Carpenter J, Morris P Atomic Safety and Licensing Board Panel |
| References | |
| CON-#292-13028 91-626-02-CIVP, 91-626-2-CIVP, CIVP, NUDOCS 9206250331 | |
| Download: ML20097H295 (14) | |
Text
...
BALCH & BINGHAM
.,c.,._.
..m. M
.,.m,~,....s.
_. 4, sm..
io u
.. L.
m,.m.,..~.-
s.ns... u...
c ron.,c,<,.~o ecus m m. M $1 m....
... m e.~c_.
r m.wa e 4.:-. s u.Anos>.c ac.
ac.A~o.
a s*~.
5 em i.
~
..n ww e.
e.
t h
. t.%.t w
$4057C'TF2CC (,O9 3 C' t' s~3 Q '
e.aoto* w..o.
3 xst **a. r c %i., e M en r, t., % t 4 e A
o...o a e no y
- . %. v u
. t i,0~ -
- c. t 5, -
M.swv D.Ms t.e soH* #T =.au.kas a B i f4 M I N G H A M, A L A B A M A 3 5 2 01 ceaataw
' as :.% t. a
- s t. ** u amt w u.A= 4 w.*O
- w uaw I ha tut wt as 4 O t. rut a, t vs.. ' t us T b**C++dt St O.8u ipoSi Po t e.00 A 9 EO..WERT M. cod.eN5 Qf wan it s c.,crwcc,o
< Ma w *o..e.=t m.to
- g JJ 22.,..
m.~,u _.cc3., mt go. g as w s
A.~
. neua -
6hA...;.mm..m...
.m o
- cut,
- u. s o.,
. a ~,,
. o.s m.,
..m..~
s.
.., u.,.
e m o -,.~o
.. n. u.. - m m..
.twnMAS Tr T.tAGA**D JR PtVLN F CMEV C AVE NM it C C*'th f t,.*h Cw:$rv C C tX
- 4M CROJ
- I * % O' # 4 I C.HARd,m o m,S
- '* L.C.AM h C.M. *C H
- L t o. o o.", -.., m..1,, :.... w. e ~,LO.4 om%4L *.pt N
e.4et t s 6 Mqqc,C in.
cm.-
too..s..to.a w
+ m sd >
tut o 6
[
ew avea,orcmass
=o L.pr
.,ya,,,
,t,....
gg;a
,0.h,,. -e.eee c(. m *au c.-o o n.uo.,.
m sa u.w.A=o.
o.y s Au c.o.ono r.c $ ms t ires i est c h'&,p' -
,.rs~
cc,t.~ t v. t tu t
m.
,. g we...r t e r eu. ~
r.n o. 4 w uou
.o. s oscow.y c.
uv cnne 4 es.imte wtuau r coee u r ar c e om v r tc a-a t
- a. ' a c 4. =.< * = c o'.
JLAN 1 ROGL P$
sAmit O SPL *.Cf'9
,t.,
A s.* t b M H A *<C Cs s'., se II 4 M MAMPTON SQt19 ns($ A gr*r.ta u Je 400 no O t =pp ('
Wiku TAM & WRGMT IU**
Ih$ M C. W4 (MM GLAD.Ot td (205) 226+3/.?2 s( '.l'il $ WL'i [. sR wtC ACL L E.Dw #D.S t SUS 4B Efv4L m... o so a s o m.o.u 3.m=ar..
so~a. a, c.m ~c=,w m
,~4 oa c-u src c. amw x,.,g, u,,.... n M
c.,,
m.~. ~.,
SG.ON.c1, D bigNDY
. STANFDDDIh..NTDN M
J. u ne 18,,.. (A).
0.q[ 3301 5 C UP4.N
.-u,
1..
-,,,.. s.c s,,.o,.. m..a.-m.
..r
.m.. t...s-c.
.~.ma.
a o
. -.....,..o,e m t s.
.,1..:
-<m...~.
. x m.
G. Paul Bollwerk,111 James H. Carpenter Ad ninistrative Judge Administrative Judge fety and Licensing BoatJ Atomic Safety and I icensing Board ir Regulatory Commission U. S. Nuclear Regulatory Commission v.
F D.C. 20555 Washington, D.C. 20555 M
.,1 arns
..ivu Judge
,uth Glen Road rotomac, Maryland 20S5 ?
IN Tile MATTER OF Alabama Power Company (Joseph M. Farley Nuclear Plant, Units 1 ami 2)
Docket Nos. 50 358.CivP; 50 364.CivP ASLUP No. 91626 02.CivP
Dear Administrative Judges:
Please find enclosed Alabama Power Company's updated list of exhibits in the above-styled enforcement actica.
Respectfully yours,
/.
f
{ A, f,/'.f./
t i
/
/ /
(,,
n 9206250331 920618 James H. Miller,111 PDR ADOCK 05000359 G
PDR x.. COUNSEL FOR ALABAMA POWER COMPANY
~
Enclosure cc: Certificate of Service
$O nosar,~c o, _
m i.~ sm-no r m.~
m m ce,. m
,,,, s m r u,..
DiHMFNGMAM,.t Af1AM A E/O't EUNM NOA% *i A B*^ YMO3
" W W"E M "i " 3 '"" M M N
- tLf " ^ $ W A JNM
- * ' * N U I O N D C EO'~"
si ;i 0 U:.id C UNITED STATES OF AhiERICA NUCLEAR REGULATORY COMMISSION
'92 JJ4 22 N0 32
}lEEORE THE ATON1LC SAFETY AND LICENSING BOARD;.? 1 ' oy [
49 f e
v.a-w t. t. < n In the Matter of:
)
)
Docku Nos. 50-348-CivP ALABAMA POWER COMPANY
)
50 364-CivP
)
(Joseph M. Farley Nuclear
)
Plant, Units 1 and 2)
)
ASLBP No. 91-626-02-CivP CERTIFICATE OF SERVICE I hereby certify that copies of updated " List of APCO Exhibits" iri the above-captioned proceeding has e been served by Federal Express on the fellowing as indicated by an asterisk and otherwise by deposit in the United States Mail, First Class, this 18th day of June,1992:
G. Paul Bollwerk, I!!*
James H. Carpenter' Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Washirgton, D.C. 20555 Peter A. Morris
- Eugene J. Holler, Esq.*
Administrative Judge Office of the General Counsel 10825 South Glen Road U. S. Nuclear Regulatory Commission Potomac, Maryland 20S54 Washington, D.C. 20555 Office of the Secretary (2)
Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Panel Washington, D.C. 20555 U. S. Nuclear Regulatory Commission Attn: Docketing and Service Section Washington, D.C. 20555 Adjudicatory File (2)
Office of Commission Appellate Atomic Safety and Licensing Board Panel Adjudication U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 205.55
Mr. W. G. Hairston, HI Regional Administrator
' Southern Nuclear Operating Company, U. S. Nuclear Regulatory Commission-
- Inc, Region 11
- Post Office Bo'x 1295 101 Marietta Street
= Birmingham, Alabama 35201 Suite 2900 Atlanta, Georgia 30323 James Lieberman, Director
- Office of Enforcement U. S. Nuclear Regulatory Com nission Washington, D.C. 20555
~
g$,/,.-
/.
</
(7 -/,yr
.f,
y s
James H. Miller,111
, Counsel for Alabama Power Company l
r I
i-
^_
0 9
lew, A m -we, e
v a
>ea vra~,---a.
.v.-.
c,
-,..,,m,e,-e
, e, nye,m
-.w-,e,,~,n.
,aw v,,..
u,
,,.,~w a
..a,-,-
as
.,m.,,ng,e-m-,,,p-m
--e,e e,w-,+-r-
gi :i' pnx LIST OF \\PCO EXHIB1TS (Cross referenced with corresponding staff exhibits)
'gn,a. ; wa P:
- ;inu 4, ' ! o s ID g; t,w-APCO#! STAFF #
1.
Agenda,8/26 28/87, regarding EQ seminar at Sandia APCO exhibit recel,ed luto evidence, p. 947 2.
4.
Gcactic Letter to All_ Power Reactor Licenscu and Applicants from Frank J. Miraglia -
NRC, dated 04,U7/88, regarding Modified Enforcement Policy Relating to 10 CFR 50 49, 4
" Environmental Qualification of Electrical Equipment important to Safety for Nuclear Power Plants" (Generic Letter 88-07); List of Rccently Issrd Gencric Letters attached Staf f Inhibit recelsed into esidence, p. 304
' 3.
04/13/8 Pc ltion for Emergency and Remedial Action; CLI.78 6; 7 NRC 400,420 APCO eshibit receised intn esidente, p. 917 4.
IE Circular 78-0811 F. L Clayton, Jr.. APCo from Jarnes P. O'Reilly - NRC, dated 05/3198, regarding Environrnental Qualification of Safety-Related Electrical Equipment of Nuclear Power Plants; List of I.E. Circulars issued in 1978 attached APCO exhibit recclsed into esidence, p. 947 5.
10/1168 !ctter to James P. O'Reilly transmitting Farley response to IE Circular 78 08:
Qualification of Electrical Terminal Blocks; Unavailability of Test Report Due to Terminal Blocks inside Containment Associates with Containment Isolation Valves. Wide Range and Narrow Range Temperature Monitoring, and Power Operated Relief Valves APCO exhibit received into esidence, p. 947 6.
- Letter to F L Clayton, Jr. Alabama Power Co. from James P. O'Reilly dated 02.08/79 regarding !.E. Bulletin No. 79-01: Emironmental Qualification of Class IE Equipment; attachments: 1) lE Bulletin No.79-012) List of IE Bulletins issued in the Past 12 Months
- 3) List of SEP Plants.
APCO exhibit received into evidence, p. 947
- 7.
27.
Bulletin to F. L Clayton, Jr. - APCo froin James P. O'Reilly.NRC, dated 06/06R9 regarding
- Supplement 1.E. Bulletin 79 01 A; attachments: 1) IE Bulletin No. 79-Ol A 2) List of I.E.
Bulletins Issued in the Past 12 Months 3) List of SEP Plants
-StalT exhibit received into esidence, p. 889 8.
Bulletin ~ to F. L Clayton. Jr.
APCo from James P. O'Reilly -NRC, dated 01/17/80 transmitting IE Bulletin No.79-01B Regarding Environmental Qualification of Class 1.E-Equipment: Enclosures dated 01/14/80
-APCO exhibit received into evidence, p. I194 9.-
CLI.80-21 dated 05/27/80 APCO exhibit received inin evidence, p. 947 d
a-
-w,,-
rse-.---,,
---.c a
.c ene<
-m.,
e v --
APCO exhibits
- Page 2
- 10. -
Memo to Z. R; Rosztoczy from Frank Ashe, Joel Paige, William Doothe, and Maritec Slosson, dated 05/27/81, transmitting Trip Report Audit of Alabama Power Company's Test Data and/or Documentation Concerning Environmental oualification of Electrica1 Equipment Per NI1REO-0588 for Farley 2 Nuc! car Station
- APCO exhibit acccAd liito nida.cc, g. 947 11.
Letter to R. T. Mcdonald APCo from C. E. Murphy - NRC dated 01/15/8i tr::nsmitting Report Nos. 50 348/80-38 and 50-364/30-49; Special 1nspectton conducted By T. D. Gibbons on 12N2/89 to 12/05/80 APCO exhibit recched into esidence, p. 947 12.
Technical Evaluation Report entitled Environmcatal Qualificuion of Safely Related Electrical Equipment IED 79-01B Farley Unit No I prepared by N. Merriwcather on 12/10/80 APCO exhibit received into esidence, p. 947
- 13.
Letter to F L Clayton, Jr. - APCo frem Thomas M. Novak NRC dated 02/13/81 regarding Preliminaq Results of NRC Review of EQ's of Safety-Relaicd Electrical Equipment at Farley Piar.t, Unit No.1; attachment: Environmental Qualification Report APCO exhibit received into esidence, p. 947 14.
Lctier to F. L Clayton, Jr. APCo from Stever. A. Varga - NRC dated 05/21/81 transmitting NRC Safety Evaluation for the Einonmcatal Qualification of Sarcty Related Electrical Equipment at Farley Unit No.1; attachments: Safety Evaluation Report and Technical
- Evaluation Report dated 11/14/80 APCO exhibit recched into esidence, p. 947 15.
March 1981 Safety Evaluation Report - Unit 2. Docket No. 50-364, APCo, Supplement No.
6 to NUREG-75/034 APCO exhibit recched into evidence, p. 947 16.
01/14/83 Technical Evaluation Report: Review of Licensecs' Resolution of Outstanding Issues From NRC Equipment Environmental Qualification Safety Evaluation Reports (F-11 and B.60); Farley Unit 1; prepared by The Franklin Institute APCO exhibit received into evidence, p. 947 4
17.
01/17/83 Technical Evaluation Report: Review of Licensees' Reschition of Outstanding issues from NRC Equipment Environmental Qualification Safety Evaluation Reports (F Il and B 60); Farley Unit 2; prepared by The Franklin Research Center APCO exhibit receised into esidence, p. 947 18.
Letter to F. L Clayton Jr. - APCo from Steven A. Varga NRC dated 02/U4/83 transmitting Safety Evaluation Report for Environmental Qualification of Safety Relaicd Electrical Equipment - Farley Unit No.1 APCO exhibit received into evidence, p. 947
- 19. -
- Letter to F. L Clayton, Jr. - APCo from Sicsen A. Varga - NRC dated 02/04/83 trainmitiing Safety Evaluation Report for Environmental Qualification of Safety Related Electrical Equipment - Farley Unit No. 2
- APCO exhibit recebed into esidence, p. 947
. -. - ~
- - - - -.~.
APCO exhibits Page 3
. 20.
letter to S. A. Varga. NRC from F. L. Clayton, Jr. APCo dated 02/29/84 concerning Safety Evaluation Reports and Technim! Eva!uatica Repons Noting Deficiencies Concerning Documentation of Qualification for Several Safety Related items at FNP; attachments: 1)
Summary of Each Deficiency Identified in the TER's for Units I and 2: 2) Resolutions to 1-Specific NRC Staff Comments identified at the 01/11/84 Meeting: 3) Westinghouse Affidavit Requesting Information in Supplements 1,2,3 and 4 To De Withhcid from Public Disclosure APCO exhibit recched into esidence, p. 947 21.
Safety Evaluations dated 12/13/84 for Units 1 and 2; proposed resolutions for deficiencies
-identified in Safety Evaluations dated 01/31/83 and in the 01/14/83 and 01/17/83 Franklin TER's and to your proposed that JCO's are not necessary
'APCO exhibit received into esidence, p. 947 22.
Letter to S. A. Varga NRC from R. P. McDonalJ - APCo d ted 01/28/85 transmiaing Units 1 and 2 Response to Generic !. citer 8124; Sworn Statemer.t that an EQ procram is in p; ace, the plant has at least one path to safe shutdown, and epipment is qualified or operating under JCO.
APCO exhibit recched into esidence, p. 947 23.
FNP Environmental Qualification Program Implementation: FNP# STP-4108. Revision 0 APCO exhibit received into c.idence, p.1060 24.
Execrpt from of The Lineman's' and Cableman's Handbook, section 33, entitled, " Splicing Cable' APCO exhibit received into evidence, p. 962 25, 21.-
Okonite Report No.- NQRN-3, Rev.1. June 30,1932, entitled, " Nuclear Environmental Qualification Report for Okoguard Insulated Cables and T-95 and No. 35 Splicing Tape' Staff exhibit received into esidence, p. 442
'2 61 16.
07/30/87 letter to NRC Document Control Desk from R. P. Mcdonald transmitting Farley Unit 1 Licensee Event Report No. LER 87-012-00 Staff exhibit received into esidence, p. 442 27.
NEQ Test Report 17859-02P performed by Wyle Laboratories: Qualification Test Program on Ray Chem Nuc! car Cable Splices, Okonite Tape Splices, Kerite Tapc Spilces, Scotch Tape Splices and Amp Butt Splices as Installed on Various Wire Insulations at Commonwealth Edison Companics LiSalle' Dresden and Quad Citics Generating Stations, volumes I and 2 (March _11,1987)
APCO exhibit received into esidence, p. 962
- 23, 9.
Generic Letter 86-15 entitled
- Environmental Qualification of Electric Equipment important to Safety for Nuclear Power Plants,' dated 09/22/86 StalT exhibit recelsed into esidence, p. 304 29.
Jesse E. Love resume APCO exhibit reccited into evidence, p. I191 30.
James E. Sundergill resume APCO exhibit receised irito esidence, p. I191
APCO exhibits Page 4 -
31.
General Design Criterion 4,10 CF'R Part 50, Appendix A APCO exhibit received into esidence, p. I191 32.
Regulatory. Guide 1.97, Rev. 2.
APCO exhibit received into ciidence, p. I191 33, 1
08/15/88 Notice of Violation and Proposed imposition of Civil Penalty (NRC Inspection Report Nos. 50 348,364/8725 and 50 348,364/87) transmitted to Alabama Power Company from NRC 34, 3.
08/21i'X) Order imposing a Civil Monetary Penalty at Farley Staff exhibit racched intu esidence, p. 304 35.
Regulatory Guide 1.89, Rev.1 APCO exhibit recched into esidence, p.1191 36.
IEEE Standard 3231974, Standard for Qualifying Class IE Electric Equipment for Nuclear Power Getierating Stations APCO exhibit recched into esidi nee, p.1191 37.
.lEEE 3231971, Standard for Qualifying Class IE Electric Equi,nment for Nuclear Power Generating Stations APCO exhibit recched into esidence, p. I191 38.
APCO Detail Nos. A-172389-172398: generic design details regarding terminations APCO exhibit recched into esidence, p. I191 39.
25.
Wyle Test Report 17947 01 dated 10SS/87 with Addendum I dated 11/19/88 Staff exhibit recched into evidence, p. 442 l
- APCO exhibit recched into evidence, p. 947.
'40 26.-
05/16/90 Qualification of taped splices for use in instrument circuits subject to harsh
~ environments, Waterford Steam Electric Station, Unit 3 Sta!T exhibit received into evidence, p. 442
' Circular 80-10 regarding Failure to Maintain Environmental Qualification of Equipment, 41.
dated 04/29/80 APCO exhibit recched into evidence, p I191 42.
23.
NUREG.0588, Rev.1: Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment Staff exhibit received into esidence, p. 442 43.
30.
- 09/2347 Electric Hydrogen Recombiner Splices -- Justification for Continued Operation L
Staff exhibit received into evidence, p. 304 44.
32.
WCAP.7709.L: Electrical Hydrogen Recombiner for Water Reactor Containments, produced by Westinghouse Electric Carp.
Staff exhibit recched inte esi<.ence, p. 529 4
-~
.. ~. _
~
APCO exhibits Page 5 45.
~ 29.
09/17/87 Electric Hydrogen Recombiner Splices - Justification for Continued Operation Staff exhibits recched into esidence, p. 529 46.
Lciter to APCO from Westinghouse regarding 5-to-1 terminations, dated 09/22/87 APCO exhibit received into esidence, p.1191 -
47.
31.
WCAP 9347: Qualification Testing for Model B Electric liydrogen Recombirict, produced by Westinghouse Electric Corp.
Staff exhibits received into esidence, p. 529 48.
Letter to Thomas Anderson Westinghouse from John F. Stolt.
NRC dated 06/22n8 transmitting evaulation of WCAP 7709L Re: liydrogen Recombiners APCO exhibit received into esidence, p.1191 49.
Westinghouse EIcettic liydrogen Recombiner Technical Manual APCO exhibit received into esidence, p.1191 50.
.Wyle Test Report 44354-1,' dated 03/08/79 APCO eshibit received into evidence, p.1191
- 51. =
48.
- 06/15/84 I.E. Information Notice No. 84-47; Environmental Qualification l'ests of Electrical Terminal Blocks APCO exhibit recebed into esidence, p. I191 Staff exhibit recehed into esidence, p. 779
- 52. -
APCO response to Circular 78-08 and Notice 84-47 regarding terminal blocks and loop accuracy APCO exhibit received into esidence, p.1191 53.
Excerpt from IPS-lC7:Canax Test Report IPS-107 Connection NSS3 Terminal Blocks APCO exhibit receised into esidence, p.1191 54.
Picture of CR151B terminal block taken from vendor's catalogue APCO exhibit recched into eiidence, p. I191 55.
12.
Letter to R. P. Mcdonald - APCo from J. Nelson Grace NRC dated 02/04/88 transmitting NRC Inspection Report Nos. 50-348/87-30 and 50-364/87-30
- Staff exhibit receised into esidence, p. 304 56.
Graph representing terminal block Connectron Nss3/#16 AWG Wires, Conax Test Report IPS-107; representation of IR values over time.
APCO exhibit received into evidence, p.1191
- 5 7..
One-page illustration of Connectron terminal t-lock taken from vendor's catalogue APCO exhibit received into esidence, p. I191 58 Qualification test reports for GE CR151B terminal blocks
$9. -
11/24/87 Justification for Continued Operation Unit 1 - Terminal Blocks Used in Instrument Circuits
.~.
- -~
APCO exhibits Page 6.
60.
39.
- Raychem Report EDR 5033/Wyle report 58442 2, dated 04/81 Staff exhibit received into egidence, p. 889 s
6L Test Report 2BE 1049-3: submergence testing of Chico A/Raychem scal.
APCO exhibit receised into evidence, p. I191 62.
33.
Bechtel qualification testing of Raychem scals Stali exhibit received into esidence, p. 889 63.
40.
02MI/79 Testing and Irradiation of Four Inch Eys Condulet, performed by Southwest Research Institute Staff exhibit received into evidence, p. 889 64.
4 7. '
Letter to D..M. Vctrelli NRC from R. P. McDanald APCo dated OlMS/88 transmitting Additional Documentation Supporting Environmental QualificaRa of Ray Chem!CillCO Scalant and Terminal Blocks at Farley; at:achmento 1) Correspondence from Bechtel Eastern Power Co..to APCo Regarding Ray Ch m/ CHICO scalant Environmental Qudification Evaluation; 2) Correspondence from DiBenedetto Assocu tes, Inc. to APCo Regarding Qualification of GE and States T:tminal Blocks Sta!T exhibit receised ate tvidence, p. 779
- 65.
35.
-11/20/85 EQ Test Report of Raychem NEIS Environmental Interface Sea', Kits on Stainless Steel Pipe (EDR.6063)
Statiexhibit received into evidence, p. 889 66.
43.
- Bechtel Drawing No. A 177541: Tray and Conduit General Details and Notes.
Statiexhibit received into eiidence, p. 839 67.
54.
l Limitorque Corporation Nuclear Qualification B0058, Parts and 2 Sta!T exhibits received into evidence, p. 643 68.
52.
Limitorque Report 600198: Limitorque Valve Control Test Report Stati exhibits received into esidence, p. 643 69.
53.
Limito~ ye Report 600456: Qualification Type Test Report Staff exhibits recched into evidence, p. 643 70.
(Withdrawn) 71.
Limitorque Report B00119, Rev. I dated 11/15/82:" Qualification Type Test Report of Multi.
Point Terminal Strips for Use in Limitorque Valve Actuators for PWR Service" APCO exhibit received into evidence, p.1191 72.
55, 10/28/S3 I.E. Information Notice 83-72: Environmental Qualification Testing Experience Sta!T exhibits received into evidence, p. 643 73.
01/14/86 I.E. Information No. 86-03; Potential Deficiencies in Environmental Qualification of Limitorque Motor Vahe Operator Wiring APCO exhibit receised into evidence, p.1191
_,.,c
APCO exhibits Page 7 74.
execrpt from Texaco's 1988 " Lubricating Oil, Grease and Antifrec7c Coolant Digest" APCO exhibit received into evidence, p. I191 75.
Telecopy to Frank Watford from Thomas P. Gregory dated 06/10/76 regarding Texaco Lubricant Recommendations Per Equipment Lists APCO exhibit receised into esidence, p. 574 76.
Wyle Test Report No. 40196-1: Radiation Exposure and Accident Simulation Test Program on Texaco Greases and Oils dated 12/05/88
- APCO exhibit reccited into esidence, p. I191 77.
Chevron SRl_.2 telecopy from Sclt/Bechtel APCO cahibit received into esidence, p.1191 77a.
Robert O. Bolt resume -
- 78.
letter to W. G. Hairston,111 - APCo from Caudic A. Julian - NRC dated 1031/89 transmitting NRC Inspection Report Nos. 50 348/89-23 and 50 364 E9-23: Inspection to Review APCo's Corrective Actions n Response to Previous Ingection Firdmgs (Bates
- 57180)
APCO exhibit reccised into esidence, p. !297 79.
Philip A. DiBenedetto resume APCO exhibit received into evidence, p.1297 80.
NRC Order dated 03/30/90: EQ civil penalty at H. B. Robinson APCO exhibit received into evidence, p.1297 81.
NUGEQ Report ' Clarification of Information Related to the Environmental Qualification of Limitorque Motorized Valve Operators," dated August 1989.
APCO exhibit receised into esidence, p.1297 82.
Vincent S. Noonan resume APCO exhibit recelsed into esidence, p.1297 83.
License Condition for Farley Unit 2
- APCO exhibit received into esidence, p. 305 84.
05/23/85 Evaluation and Status _of License Conditions for Joseph M. Farley Unit 2; transmitted from Mr Steven A. Varga to Mr. R. P. Mcdonald APCO exhibit recelsed into evidence, p. 305 85.
08/29/80 correspondence from NRC to APCO transmitting Order for Modification of License APCO exhibit received into evidence, p. 305 86.
Memo to NRC Regional Administrators Regions 15 from James Liberman dated 06/21&s i
transmitting Guidance for the Preparation of Enforcement Cases Related to EQ Violations:
l-follow up to Generic Letter 88-07 describing modified enforcement policy for environmental
~~
qualification actions APCO exhibit ieceised into evidence, p. 305 l
...--...e.
c-r...-
w
,-.-y
APCO exhibits Page 81 87.
Notice of violation for Indian Point Unit 2, dated 11/03/88 APCO exhibit received into evidence, p. 305
- 88. -
Notice of violation for Indian Point Unit 3, dated 09/21/88 APCO exhibit recched into esidence, p. 305 89.
Notice of violation for Susquchanna Units 1 and 2, dated 09/19l88 APCO exhibit recched into evidence, p. 305
- 90.
"EQ Scoreboard
- APCO exhibit received into evidence, p. 305 91.
Notice of violation for Consuucts Power Company's Palisades Nuclear Plant, dated 11/23/88
_ APCO exhibit recched into esidence, p. 3n5 92, Timeline prepared by Alabama Power Company APCO exhibit recched into evidence, p. 791 93.
TI 2515n6 Inspection hiodule, entitled,' Evaluation of Licensee's Program for Qualification of Electrical Equipment Located in Harsh Environmente APCO exhibit received into evidence, p. 336 94.
Correspondence from NRC to APCO regarding "Sunenary of Meeting Held on September 24, 1987, Between NRC Staff and APCO Representatives to Discuss Recent Problems Related to Qualification of V-Type Electrical Splices at Farley Site" dated 11/05/S7.
APCO exhibit received into evidence, p. 442 -
95.
09/28/87 correspondence from Wyle Laboratories to APCO regarding Environmental l
Qualification Test Results on Okonite and 3M Tape Splice Assemblies for the Faricy Nuclear Generating Station.
APCO exhibit received into evidence, p. 443
- 96.
Correspondence from Jackic G.raham of Southern Company Seniccs to APCO dated l
10/29/87, transmitting assessment of V-type tape splices.
[
- APCO exhibit recched into evidence, p. 451 t
97.
excerpt from Reliance Manual B 3520 8 L
APCO exhibit received luto evidente:. p. 574 98.
execrpt from Reliance Manual B 3620-19 L
APCO exhibit received into evidence, p. 574 99.
Installat_ ion and Maintenance Manual for Joy Series 1000 Axivane Direct Connected Sing!c and Two Stage Axial Flow Fans APCO exhibit recched into esidence, p. 574 L
100.
execrpt from Reliance Manual B+3628-Rev. 9 APCO exhibit received into evidence, p. 574 a
.u
~
APCO exhibits Page 9 P
101.
execrpt from Reliance Manual B 3628.Rev.10 APCO exhibit received into esidence, p. 574 102.
Physical specimen: EA-180 Seal (Cross-section of Raychem boot)
APCO exhibit received into evidence, p.1192
'103.
Phpical specimen: EA-180 Namco Limit Switch (Full version)
- APCO exhibit received into evidence, p. I192
-104.
Drawing A 177541 Rev. O, dated 07/16/82: Procedure for Applying Chico-A4 Compound o the Nipple of Namco's EA-180 Limit Switch Where Raychem Break-Out is Attached APCO exhibit received into esidence, p. 890 105.
Physical specimen: V-type splice APCO exhibit received into cildence, p.1192 106.
1 Thysical specimen: 5-to-1 splice APCO exhibit received into evidence, p. I192 107.
Physical specimen: T-drain APCO exhibit received into evidence, p.1192 103.
09/30/87 correspondence from APCO to NRC regarding 09/24/87 meeting APCO exhibit received into evidence, p. 347
-109.
NUCEO Report ! Clarification ofInformation Related to the Environmental Qualification of Limitorque Motorized Valve Operators,* dated April 19S6.
110.
J. E. Love markup of Board Exhibit 1 -
APCO exhibit received into evidence, p.1223
- 11L 1 page execrpt from Sandia report: Figure 2, Phase !! Environmental Temperature Profile, Jesse Love markup.
i-APCO exhibit received into evidence, p.1223
-112-01J07/83 correspondence from APCO to NRC requesting that nine completed license conditions be closed out.
l 113.
12/28/82 internal NRC correspondence from Thomas M. Nov +k to William V. Johnston transmitting Supplement to Safety Evaluation Report for Shorel am Nuclear Power Station, Unit 1.
i 114.
05/03/91 correspondence from NRC to Connecticut Yankee Atomic Power Company, transmitting Electrical Distribution System Functional Inspection (EDSFI) of Haddam Neck, inspection Report No. 50 213/91-80 and Appendix A, Notice cf Violation.
-115.
11/21/89 telephone contact report; call from Jim Gleason, Wyle, to Mark Jacobus, Chuck Paulk, and Harold Walker, all of NRC.
w-
---m
,.,.,.-r--
v
5
- APCO exhibits-Page 10 i-116.
Westinghouse Electric Corporation-Drawing No.1366C51. Electric Heater Wire Bill and Diagram.
117.
1109/87 Farley inspector notes
^
i 118.
10/08/81 Raychem installation instructions for nuc! car cable breakout kits.
119.
U. S. Department of Labor, Occupational Safety and Health Administration, Material Safety Data Sheet filed for Chico A Scaling Compound, indicating hazardous components; prepared -
10M last revised 1/91.
120.
02/10.92 Information Notice 9212: Effccis of Cable Leakage Currents on Instrument Settings and Indications.
121.
Two pages missing from all copics of Limitorque Repo:t 600198: Limitorque vahe Control Test Report (original document introduced as APCO Exhibit 68 and Staff Exhibit 52, with
- 7 the Staff document actually received into evidence, at Tr. 643).
122.
10/13!80 correspondence from Limitorque Corporation to Bechtel Power Corporation regarding qualification standards for various actuators.
i 123.
- Joy Nuc! car Containment Axivane Fan Operators Handbook; dates within the handbook range from January 1973 to February 1975.
124.
Redacted version of IPS-107 Test Report on Electrical Terminations Subjected to Design l
Basis Accident Environment North Anna Power Stations Unit I and II; Virginia Electric Power Company Richmond, Virginia; Stone and Webster Engineering Corp. Agent 125.
Dick Wiisan inspection notes, Bates #102443 126.
Dick Wilson inspection notes, Bates #102441 127.
Dick Wilson inspection notes, Bates #102538 l
128.
Dick Wilson inspection notes, Bates #102436 129.
3-page document from Raychem telephone log confirming conversation between Dick Wilson and Ken Baker of Raychem on 05/14/92.
States ZWM terminal block, physical exhibit 131.
States NT terminal block, physical exhibit 132.
General Electric CR 151B, physical exhibit 133.
General Electric EB 25 terminal block, physical exhibit 134.
Connectron NSS 3 terminal block, phpical exhibit t
- +
7-.
- gL. c - -,
APCO exhibits Page 11 135.
1 page drawing entitled,'Connectron Inc. NSS3 terminal block assembly as built dcminsions; scale 1":l"; based on examination of existing sampic'
===================n
= = = = = = = = = = =..:= = = = = = = = = = = = =
NOTES APCO 39 and Staff 25 have been received into evidence; APCO 39 includes Addendum 1.
--Staff 32, which has been received irito evidence,is missing pages; refer to APCO 44
--Staff 27, which has been received into evidence, is missing pages; refer to APCO 7.
p.
-