Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D1261999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With ML20216E7031999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With ML20210Q6611999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With ML20209F7901999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With ML20195H0351999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Monticello Nuclear Generatintg Plant.With ML20206N1721999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Monticello Nuclear Generating Plant.With ML20205P5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Monticello Nuclear Generating Plant.With ML20205G7391999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Monticello Nuclear Generating Plant.With ML20199F6211998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Mngp.With ML20198B2531998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Monticello Nuclear Generating Plant.With ML20195D2381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Monticello Nuclear Generating Plant.With ML20154L3471998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Monticello Nuclear Generating Plant.With ML20153B0861998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Monticello Nuclear Generating Plant.With ML20237B8461998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Monticello Nuclear Generating Plant ML20236R1941998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Monticello Nuclear Generating Plant ML20249A5861998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Monticello Nuclear Generating Plant ML20247K3971998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Monticello Nuclear Generating Plant ML20217F6431998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Monticello Nuclear Generating Plant ML20216H6481998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Monticello Nuclear Generating Plant ML20203B2821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Monticello Nuclear Generating Station ML20198P2201997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Monticello Nuclear Generating Plant ML20203J7131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20199H8181997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Monticello Nuclear Generating Plant ML20217K2081997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Monticello Nuclear Generating Plant ML20216H7771997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Monticello Nuclear Generating Plant ML20217K2741997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Monticello Nuclear Generating Plant ML20149E2921997-06-30030 June 1997 Monthly Operating Rept for June 1997 for MNGP ML20141C2841997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Monticello Nuclear Generating Plant ML20137W2621997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Monticello Nuclear Generating Plant ML20136H1671997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Monticello Nuclear Generating Plant ML20134M7071997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Monticello Nuclear Generating Plant ML20133J1401996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Monticello Nuclear Generating Plant ML20132A8771996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Monticello Nuclear Generating Plant ML20134L2761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Monticello Nuclear Generating Plant ML20128Q7831996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Monticello Nuclear Generating Plant ML20117M8161996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Monticello Nuclear Generating Plant ML20116M2991996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Monticello Nuclear Generating Plant ML20115H5651996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Monticello Nuclear Generating Plant ML20112J1921996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Monticello Nuclear Generating Plant ML20112A3121996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Monticello Nuclear Generating Plant ML20107E9831996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Monticello Nuclear Generating Plant ML20106H0591996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Monticello Nuclear Generating Plant ML20100G5031996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Monticello Nuclear Generating Plant ML20096C8061995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Monticello Nuclear Plant ML20095G0231995-11-30030 November 1995 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20094L1921995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Monticello Nuclear Generating Plant ML20093E6241995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Monticello Nuclear Generating Plant ML20092F4121995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Monticello Nuclear Generating Plant ML20087H3011995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Monticello Nuclear Generating Plant ML20086K1731995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Monticello Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2061999-10-12012 October 1999 Safety Evaluation Supporting Amend 106 to License DPR-22 ML20217D1261999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With ML20216E7031999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With ML20210Q0521999-08-0404 August 1999 Safety Evaluation Approving Relief Request 10 to License DPR-22 Per 10CFR50.55a(g)(6)(i).Inservice Exam for Relief Request 10,Parts A,B,C,D & E Impractical & Reasonable Assurance of Structural Integrity Provided ML20210Q6611999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With 05000263/LER-1999-007, :on 990610,HPCI Test Return Valve Was Unable to Close Against Max Expected Differential Pressure.Caused by Failure to Accurately Predict Valve Performance.Procedure Revised.With1999-07-0909 July 1999
- on 990610,HPCI Test Return Valve Was Unable to Close Against Max Expected Differential Pressure.Caused by Failure to Accurately Predict Valve Performance.Procedure Revised.With
05000263/LER-1999-006-01, :on 990602,during Quarterly Surveillance Hcpi Was Declared Inoperable.Caused by Drain Pot Alarm.Revised HPCI Surveillance Test Procedure.With1999-07-0202 July 1999
- on 990602,during Quarterly Surveillance Hcpi Was Declared Inoperable.Caused by Drain Pot Alarm.Revised HPCI Surveillance Test Procedure.With
ML20209F7901999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With 05000263/LER-1999-005, :on 990508,personnel Inserted Manual Scram When Pressure Transient Closed Air Ejector Suction Isolation Valves & Tripped off-gas Sys.Caused by Recombiner Catalyst Migration.Catalyst Was Removed.With1999-06-0707 June 1999
- on 990508,personnel Inserted Manual Scram When Pressure Transient Closed Air Ejector Suction Isolation Valves & Tripped off-gas Sys.Caused by Recombiner Catalyst Migration.Catalyst Was Removed.With
ML20195H0351999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Monticello Nuclear Generatintg Plant.With 05000263/LER-1999-004-01, :on 990422,low Reactor Water Level Scram,Group 2 & 3 Isolations & Subsequent HPCI Became Inoperable.Caused by Feedwater Controller Power Supply Failure.Three Power Supplies Replaced & Connections Cleaned.With1999-05-24024 May 1999
- on 990422,low Reactor Water Level Scram,Group 2 & 3 Isolations & Subsequent HPCI Became Inoperable.Caused by Feedwater Controller Power Supply Failure.Three Power Supplies Replaced & Connections Cleaned.With
05000263/LER-1999-003-01, :on 990412,HPCI & Division 1 ECCS Equipment Were Declared Inoperable Due to Svc Water Pump Failure.Pump Shaft Was Mechanically Freed,Check Valve Was Repaired & Pump Was Successfully Tested.With1999-05-12012 May 1999
- on 990412,HPCI & Division 1 ECCS Equipment Were Declared Inoperable Due to Svc Water Pump Failure.Pump Shaft Was Mechanically Freed,Check Valve Was Repaired & Pump Was Successfully Tested.With
05000263/LER-1999-002-01, :on 990329,event Sequence That Results in Available ECCS Being Reduced to Less than That Assumed in Current Safety Analysis.Caused by Failure of Edg.Plant Operating Procedures Revised.With1999-05-11011 May 1999
- on 990329,event Sequence That Results in Available ECCS Being Reduced to Less than That Assumed in Current Safety Analysis.Caused by Failure of Edg.Plant Operating Procedures Revised.With
ML20206N1721999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Monticello Nuclear Generating Plant.With ML20205N0861999-04-12012 April 1999 Safety Evaluation Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20205P5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Monticello Nuclear Generating Plant.With ML20205C1651999-03-19019 March 1999 Safety Evaluation Supporting Amend 105 to License DPR-22 ML20204H4951999-03-18018 March 1999 SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello.Therefore Staff Concludes Licensee Adequately Addressed Action Required in GL 96-05 05000263/LER-1999-001-02, :on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With1999-03-17017 March 1999
- on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With
ML20205G7391999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Monticello Nuclear Generating Plant.With ML20202F7901999-01-25025 January 1999 1999 Four Year Simulator Certification Rept for MNGP Simulation Facility ML20199E4871999-01-0606 January 1999 SER Accepting Licensee 951116,960214 & 0524 Responses to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20199F6211998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Mngp.With ML20198P0691998-12-28028 December 1998 Safety Evaluation Concluding That NSP Proposed Alternative to Paragraph III-3411 of App III to 1986 Edition of Section XI of ASME Code Provides Acceptable Level of Quality & Safety.Alternative Authorized ML20198M8221998-12-24024 December 1998 Safety Evaluation Supporting Amend 104 to License DPR-22 ML20198M6901998-12-23023 December 1998 Safety Evaluation Supporting Amend 103 to License DPR-22 ML20198D0751998-12-10010 December 1998 Safety Evaluation Supporting NSP Proposed Change to EOPs to Use 2/3 Core Height as Potential Entry Condition Into Containment Flooding ML20198B2531998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Monticello Nuclear Generating Plant.With ML20195E3691998-11-12012 November 1998 Safety Evaluation Concluding That Licensee USI A-46 Implementation Has Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20195D2381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Monticello Nuclear Generating Plant.With ML20198J4451998-10-22022 October 1998 Rev 2 to SIR-97-003, Review of Test Results of Two Surveillance Capsules & Recommendations for Matls Properties & Pressure-Temp Curves to Be Used for Monticello Rpv 05000263/LER-1998-005-01, :on 980921,HPCI Was Removed from Service to Repair Steam Leak in Drain Trap by Pass.Caused by Localized Erosion of Valve Body.Valve Was Declared Inoperable & Was Replaced with Manual Valve1998-10-21021 October 1998
- on 980921,HPCI Was Removed from Service to Repair Steam Leak in Drain Trap by Pass.Caused by Localized Erosion of Valve Body.Valve Was Declared Inoperable & Was Replaced with Manual Valve
05000263/LER-1998-004-02, :on 980909,manual Scram Was Inserted Following Pressure Transient Closed Air Ejector Suction Isolation Valves & Trips Offgas Recombiners,Occurred.Caused by Seat Leakage.Leaking Valve Seat Was Reworked1998-10-0909 October 1998
- on 980909,manual Scram Was Inserted Following Pressure Transient Closed Air Ejector Suction Isolation Valves & Trips Offgas Recombiners,Occurred.Caused by Seat Leakage.Leaking Valve Seat Was Reworked
ML20154L3471998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Monticello Nuclear Generating Plant.With ML20153F0511998-09-21021 September 1998 Rev 2 to MNGP Colr,Cycle 19 ML20153E9361998-09-0808 September 1998 Rev 1 to MNGP Colr,Cycle 19 ML20153B0861998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Monticello Nuclear Generating Plant.With ML20151T0981998-08-28028 August 1998 Safety Evaluation Supporting Amend 101 to License DPR-22 ML20237B8461998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Monticello Nuclear Generating Plant ML20236W5041998-07-21021 July 1998 ISI Exam Summary Rept - Refueling Outage 19 ML20236R1941998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Monticello Nuclear Generating Plant ML20249A5861998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Monticello Nuclear Generating Plant 05000263/LER-1998-003-01, :on 980417,transgranular Stress Corrosion Cracking Was Identified in Control Rod Drive Lines.Caused by chloride-induced Transgranular stress-corrosion Cracking. Affected Sections of Two Lines Replaced1998-05-14014 May 1998
- on 980417,transgranular Stress Corrosion Cracking Was Identified in Control Rod Drive Lines.Caused by chloride-induced Transgranular stress-corrosion Cracking. Affected Sections of Two Lines Replaced
05000263/LER-1998-002-02, :on 980415,main Steam Isolation Valve Position Setpoint Outside Allowed Range,Was Found.Caused by Previous Testing Technique & Use of Particular Switch Model.Eight New Position Switches W/Less Deadband Installed1998-05-14014 May 1998
- on 980415,main Steam Isolation Valve Position Setpoint Outside Allowed Range,Was Found.Caused by Previous Testing Technique & Use of Particular Switch Model.Eight New Position Switches W/Less Deadband Installed
ML20247K3971998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Monticello Nuclear Generating Plant 05000263/LER-1998-001-02, :on 980323,discovered Containment Isolation Valve Leakage Exceeded TS Limit.Caused by Foreign Matl Found on Valve Seat.Repaired Subject Valves & Developed Process to Ensure Cleanliness of Testing Equipment1998-04-22022 April 1998
- on 980323,discovered Containment Isolation Valve Leakage Exceeded TS Limit.Caused by Foreign Matl Found on Valve Seat.Repaired Subject Valves & Developed Process to Ensure Cleanliness of Testing Equipment
ML20217E9611998-04-20020 April 1998 Safety Evaluation Supporting Amend 100 to License DPR-22 ML20217D8731998-04-13013 April 1998 Rev 0 to MNGP Colr,Cycle 19 ML20217F6431998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Monticello Nuclear Generating Plant 1999-09-30
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE i.
l DOCKET NO.
50-263______
DATE 8-2-84_
COMPLETED BY A. L. Myrabo TELEPHONE 612/2?5-5151 MONTH _
._ JULY 7-1-84 to Continuation of 1984 refueLinq outage.
l 7-31-84 l
l l
Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
l l
LE*%
8409200198 840731 PDR ADOCK 05000263
( {\\
R PDR
AVERAGE DAILY UNIT POWER LEVEL-DOCKET NO.
50-263______
UNIT Monticello__
DATE 8-2-94 -_--
COMPLETED BY A. L. iiv e a b o TELEPHONE 612/295-5151 MONTH ______ JULY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE-DAILY POWER LEVEL (MWe-Net)
(MWe-Not) i
_a__,-__,_____
17-
_e____________
_9 18
_e 3
_9____________
19
-1____________
4
_o____________
o0
_o________-___
5
_1_________-__
? i a
6
_n_____________
no
_a
_o____________
o3
_9_________.._
e B
_n o,1
_1.._____.._.._
o.
-m_____________
oc
_a______-,__-..
-a 1o
_1____________
n_6
_n J
ji
_t____________
o ~t
_n 1o n8 13 "9
i--_______-_..
14
-2_________.__
30 15 31
-9_______
ic
-1____--_-____
i INSTRUCTIONS On thic format, list the average daily unit power levet in nue-tiet for each day in the reporting month.
Compute to the nearest whole roeoawstt.
,n.
,,,a-e-
AU(i3 l$S4 c
OPEPATING DATA REPORT DOCKET NO.
50-263.____..
DAl'E 9-2-84._.
COMPLETED BY A.
L. riy r a t.o TELEPHONE 612/295-51"i OPERATING STATUS INotes i
- 1. Unit Name.. ________________________Monticello l
l 2.
Rsporting period: ___________________ JULY l
I
- 3. Licensed Thermal Power-(MWt)-
____________1670 l
l 4.
Ncmeplate Rating (Gross MWe):
_____________569 i
I 5..Dasign Electrical Rating (Net MWe): __ __545.4 l
l
- 6. Maximum Dependable Capacity (Gross MWe): __553 l
l
- 7. Maximum Dependable Capacity (Net MWe):
___525 1_.__..._..._......_.___.._l 8.
If Changes Occur in Capacity Ratings (Items Number 3 Throuch 71 Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted, If Any (Net MWe)
___N/A___________________
- 10. Reasons For Restrictions, If Any:
__N/A_____..__.._________________.__
I'his Month Yr,-to-Date Lumulati.-
- 11. Hours In Reporting Period
.____744
.__.. 5111
____614700
- 12. Number Of Hours Reactor Was Critical 0.0
.__ 310.5
.._ 39915.4
- 13. Reactor Reserve Shutdown Hours
_.____0.0
__.___0.0
_940.7 14 Hours Generator On-Line 0.0
___ 308.8
.. 38003.9
- $. Unit Reserve Shulduwa Hours
__0.0
....... G. 0 0.0
- 16. Gross Thermal Energy Generated (MWH)
O 897899
.i41233314
- 17. Gre,ss E lec t r ic a l Energy Generated (MWH) __
0
_. 296117
,_451850S2
- 18. Not Electrical Energy Generated (MWH)
-1218
__ 273139
..<h34?03 1'.6%
7 e..' %
- 19. Unit Service Factov 0.0%
J
- 20. Unit Availabiliiy Factor 0.0%
___ 15.8%
.___ 7c.7%
- 21. Unit Capacity Factor (Using MDC Net)
.._ -0.3%
.__ 10.2%
71.7%
- 22. Unit Capacity Factor (Using DER Net)
__ -0.3%
._. 16.0%
70.5%
- 23. Unit Forced Outage Rate 0.0%
0.0%
5.3%
- 24. Shutdowns Scheduled Over Next 12 Months (Tvpe, Date. and Duration of Eachi
...Fe b r u a r y 3, 1934 - Retuelinq Ouiage - 286 davs_.. __.. __.....
- 25. If Shut Down At End Of Report Period, Estinated Date Of Startup;_. 11-15-04_.
- 26. Units In Te.5t Statur(Prior io Commerc:ai Operation)
N/A Forecast Achir ad INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 4
o DOCKETNO. _50-263 LINIT SilUTDOWNS %ND FOWER REDUCTIONS Monticello
~
IJNIT NAME DATE '8_-2-84 COMPT.ETED gy
A.1.
Myrabo REPORT MON fit lin v TELErlf0NE 612/295-5151
~
~~
1 E 5-Licensee
[1 5%
Cause & Correenive lesse
$]!
4
- 5. i 5 Esen 3,7 p?
Aoion to E
3 f, =!
Repast =
aO
,E '
Prevent Recurecewe i
r e
d 2
2-3-84 S
744.0 C
4 N/A ZZZZ ZZZZZZ Continuation of 1984 refueling outage l
}
l l
I 2
3 4
F. fo ced Reason.
Method:
Exlubis G losisu.tions t
S Sched ule.1 A. Equipment FailureiEspinn)
I-Manual for Prepnalisnt of Data Batainterunce oi Test 2-Manual Serain.
Entsy Sheets for Licensee C Refueling 3 Auturnstic Scram.
Event Report (LERI File INUREG-D.Regulainsy Restriaion
-1Othes ( Explaini 0161I Eopentor Tsainingi 1Aenw-Luniination F-AJrninisern eve
.i G Opesassonal Esens (Esplam)
E sliibit I Saur Sout(c i
l Pit?7) 11 Other (E splaus) l i
I l
l a
y e
Northern States Power Company 414 a.conet Mau Minneapes. M nnesota 55401 Teephone (612) 330 5500 August 10, 1984 Director, Office of Resource thnagement U S Nuclear Regulatory Commission Washington, DC 20555 MONIICELLO NUCLEAR GENERATING PLAVI Docket No. 50-263 License No. DPil-22 Monthly Operating keport July, 1984 l
Attached are twelve copies of the Monthly Operating Report for j
July, 1984 for the Monticello Nuclear Gene. rating Plant.
h l
u.
(
l David Musolf l
Manager of tbelear Supe rt Services DMH/bd cc:
Regiocal Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Terman IN Attachment