ML20097H183

From kanterella
Jump to navigation Jump to search
Forwards McGuire Nuclear Station,Unit 2,Cycle 8 Startup Rept. Rept Submitted as Result of New B&W Fuel Used in Reload
ML20097H183
Person / Time
Site: Mcguire
Issue date: 06/15/1992
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20097H187 List:
References
NUDOCS 9206240306
Download: ML20097H183 (2)


Text

~

ll l

IUe nur Compny 1 C U wun hidhre kclear Generatwts th;artment s ur Prn&nt 1 ?03)lagm fory h%fik!iCIA)

(l04)<?5-4vn flan:erwale, hC29 49%

(ly4j8:3 t ui f u DUKEPOWER June 15,1992 U. S. Nuclear Regulatory Commission 1

Document Control Desk i

Washington, D. C. 20555

Subject:

McGuire Nuclear Station 1

Docket Nos. 50-370 Cycle 8 Startup Report for Unit 2 Ref. Tech Spec 6.9.1.1 Gentlemen:

Attached is the McGuire Nuclear Station Unit 1 Cycle 8 Startup Report for Criticality, Zero Power Physics Testing, and Power Escalation Testing as required by Technical Specification 6.91.1.

This report is submitted due to the new Babcock and Wilcox fuel used in the reload.

For questions concerning this report, please contact Kay Crane at (704) 875-4306.

Very truly yours (NMBLL T. C. McMeekin, Vice President McGuiro Nuclear Site cc:

(with attachments) l Mr. T. A. Reed, ONRR Mail Stop 9H3, OWFN Washington, D. C.

20555 Mr. S. D. Ebneter, Region il 101 Marietta Street, NW - Suite 2900 Atlanta, Georgia 30323

.v Mr. P. K. VanDoorn Senior Resident inspector McGuire Nuclear Station I

CEOu?Ji 9206240306 920615 If PDR ADOCK 05000370 0

1 P

pop j i,j &,

\\

/

~

.m.

v

a.

. June 16,1992 NRC Documer.: Contro!.

Page 2

+

xc; (W/ Attachments)

- File: MC-801.01 (Helen Froebe-WC26A)

FI;e: MNS Master File 1.3.8.1 File: MC-801.01/MNS (W/O Attachments)

R.L Gill, Jr. (WC26A)

M.T Cash (MNS)

R.H. Clark (ECO8G)

- R.O. Sharpe (MNS)

T.D. Curtis (MNS) -

K.L Crane (MNS)

K.P. Mullen (MNS) 0

.._.,,___..,r,.,,

,.v.~,..,m.,,

v.,,,.,, _,., _,...,,v.

m, s-

.-....--