ML20097F445

From kanterella
Jump to navigation Jump to search
Forwards Nonproprietary & Proprietary Versions of Rev 10 to EPIP 3.1,Rev 10 to EPIP 3.4,Rev 7 to EPIP 6.5,Rev 3 to EPIP 8.4.1 & Rev 3 to EPIP 8.4.2.Proprietary Version Withheld
ML20097F445
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/09/1992
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19311A821 List:
References
CON-NRC-92-059, CON-NRC-92-59 VPNPD-92-212, NUDOCS 9206150311
Download: ML20097F445 (1)


Text

i Wisconsin Electnc POWER COMPANY 231 w M cNgun.Po b 2046. Miwee w1532H A 221 2 W.

VPNPD-92-212 NRC-92-059 June 9, 1992 U.

S. NUCLEAR REGULATORY COMMISSION Doc'1 ment Control Desk.

Mail Station P1-137 Washington, D.

C.

20555 Gentleren:

DOCKETS 50-266 AND 50-301 EMERGENCY PJAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 ANDJ Fnclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual.

The procedures consist of changes which should be filed in your copies of the subject document in accordance with the attached instructions.

Please note that the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT_FOR PUBLIC DISCLOSURE,"

A copy of the affected procedures with names and numbers deleted is provided and is stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the Public Documents Rooms.

Sincerely,

([

c Bob Link Vice President Nuclear Power Enclosure Copies'to NRC Incident Response Center, Region III (2)

NRC Resident Inspector (without enc.)

f/

92061bbi1920609

/![6 hk

~

PDR ADOCK 05000266

/. //V[

F PDR fyjf['

i nyl' u&a,m ->anen,

s