GE Nuclear Energy cc a < m;u,
, wa.ww sre c.m.,
June 5,1992 MFN No.126-92 Docket No. STN 52-001 SLK 9276 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:
Robert C. Pierson, Director
- Standardization and Non Power Reac'nr Project Directorate 34
Subject:
Tornedo Design Features and Submittal Date for Changes This resporids to your letter of May 29,1992 in which you expressed concern regarding the impact of tne ABWR review by the five (5) day delay in our providing information regarding the design basis tornado. Further, you requested a firm date for GE to make a subnuttal detailing the design changes necessary to accommodate the revised staff position having to do with design basis tornado.
Regarding this matt-GE requested guidance from the staff on the appropriate missile spectrum to be use.d n. the ABWR design on February 27,1992. Since the tornado missile spectrum governs the wall / roof thickness for design, this guidance is critical to the evaluation of the ADWR design. The staff was unable to provide this guidance until the issue resolution meeting between GE and the staff on May 5 6,1992, some seventy five (75) days later. In light of these factors, I do not believe it justified to imply an adverse schedule impact attributable to GE's resp se time.
As you noted in your letter, GE indicated that, based on the pending design impact for the -
reactor building superstructure and the roof purlins, several sections of the SSAR Chapter 3 and its appendicesinay need to be revised. You requested that GE provide a firm submittal date for the necessary changes within five (5) days. Due to the significant impact on the y~C'c073
)
b.G0
/
- ggM8at!!1?Bejjp i o
- A:
(
v
i
'n Document Control Desk MFN No.126-92 U.S. Regulatory Commission Docket No. STN 52 001 June 5,1992 Page 2 ABWR design of the newly established tornado acceptance criteria, we hesitate to provida a
. hurried estimate of the impact of such an extensive and far reaching design change. We suggest that this matter be thoroughly discussed at the immediately approaching staff /GE
- management meeting on June 8,1992. We are prepared to fully enumerate the elements of this change at this time.
Sincerely, C
O C-Q. dd r,
l,.
S.J. Stark, Acting Manager Regulatory and Analysis Services M/C 444, (408) 925-6948 cc: N. D. Fletcher D. F. Giessing J. M. Gutierrez C. Postusny, Jr.