ML20097D178

From kanterella
Jump to navigation Jump to search
Forwards NRC Form 536 W/Estimates of Number of Candidates to Be Examined for Fys 96-99,per Administrative Ltr 96-01
ML20097D178
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/07/1996
From: Ray D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AL-96-01, AL-96-1, NUDOCS 9602120228
Download: ML20097D178 (3)


Text

.

Commonwealtn filison Company LaSalle Generating Station o

2(of North 21st Road i

.\\iarseilles, 11.61341-9757 Tel 815-3576761 February 7,1996 U.S. Nuclear Regulatory Commission Washington D.C. 20555 Attention: Document Control Desk As requested per Administrative Letter 96-01, Operator Licensing National Examination Schedule, I have attached a copy of NRC Form 536 with our estimates of the number of candidates to be examined for fiscal years (FYs) 1996 through 1999.

It is important to note that there are 2 exams requested in fiscal year 1997.The first exam is scheduled for 10/96 and the second for 4/97. These dates are in accordance with the National Exam Schedule for LaSalle County Nuclear Station.

LaSalle is also requesting an exam in January 1998. This date is not in accordance with the National Exam Schedule. Only one exam is requested for fiscal year 1998.

In fiscal year 1999 LaSalle is scheduling an exam for October 1998. This date is in accordance with the National Exam Schedule. Only one c:aun is requested for tiscal year 1999.

The next scheduled licensed operator requalification exams for LaSalle County I

Nuclear Station will be from April 29,1996 to June 14,1996. LaSalle will conduct the written examinations (Section A and B) and the dynamic simulator portions of the exam during this time frame. The walkthrough portion (Plant and Simulator JPMs) will be conducted in the following module oflicensed operator requalification training, June 17,1996 to August 2,1996.

If there are any questions or comments concerning this letter, please refer them to me at (815) 357-6761, extension 2212.

Respectfully, W

N p

.J. Ray Station Manager LaSalle County Station PDR ADOCK 05000373

/ (/OD 9602120228 960207 t

V

_ P,DR _ _

\\\\

A I nicom Compan)

(

cc:

H. J. Miller, Regional Administrator, Region III H. J. Simons, Acting Senior Resident Inspector, LaSalle L. D.Guthrie, Operations Manager, LaSalle B. Wallace Training file Central File l

2

t e

t ATTACHMENT 2 NRC FORM 538 U.S. NUCLEAR REOULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 (s-os)

EXMRES: 8.11/97 EstiesAfte genom Pts steransE To consPLT wlTM 1)es peFonsfion COLLECTIm RIOUEST: 1 MOUR. TIGB VOulNTARY 950A04A71m OPERATOR LICCNSING

'%,",,",, ",",,',,",,"" ",,,",n"u"u'n"'*s*u"so'a'":TimTs a

EXAMINATION DATA

= womfian ma ucmas amene:T umciute P3n. u s.

nUctim usurnet commisen.==mefm. oc asseoi ma To M PAPERwcRE REoWCTel PRS 4c7 Ot#4131L OFFICE Of maammimonos:T.wa.meTm.ac meet FACILITY NRC REGION lq$ak\\e domh NCthon 26,o1 N. 21" Road ll

%sedics, Il 6 P.A - 0 5 7

~

A. PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FY 19_h_,

FY 19 97 FY 19 98 FY 19 99 (10/01/ 9f - 08/30/h)

(10/01/h 09/30/'I7 )

(10/011,1 1 - 09/30/ @ l (10/01/_$h_ 09/30/

I 1*

ie/qg #

ga /q g i /qg I0/q g ASSIGNED DATE M$

PER oENERic LErrER at-se-03 NUMGER OF REACTOR OPERATORS NUMSER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OP SENIOR REACTOR OPERATORS - UPORADE NUMSER OF SENIOR REACTOR

{

OPERATORS - LIMITED 2*

AS$lGNED DATE PER GENERIC LETTER OL 80 03 Q

]

4 4

q NUMBER OF REACTOR OPERATORS NUMBER OP BENiom REACTOR h

OPERATORS - INSTANT NUMEER OF SENIOR REACTOR OPERATORS - WPeRADE NUMBER OP SENIOR REACTOR OPERATORe - LIMITED B. PROPOSED GENERIC FUNDA. MENTAL EXAMINATION SCHEDULE FY W diass complekd m tol 99 APRit is1q ocToneR is%

IST! MATED NUMSER OF CANDIDATES Ft n/98 in place of 10/q 1 c>n dhi emu s&ecl.

8 Gb

,,s_,,,

.