ML20097C585
| ML20097C585 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/30/1984 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 108, W3K84-2033, NUDOCS 8409170156 | |
| Download: ML20097C585 (2) | |
Text
7, 9
I~
Louisiama P OW E R & Li G H T/Waterford 3 SES/P. O. Box B/Killona, LA 70066 NuS$sysY$
August 30, 1984 W3K84-2033 Q-3-A35.07.108 iM@ M DWM >
Mr. John T. Collins j,
Regional Administrator, Region IV U. S. Nuclear Regulatory Commission N
7N 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 M
RE7ERENCE:
LP&L letter W3K84-1880 dated August 10, 1984
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 108
" Potential Failure to Comply with FSAR Safe Shutdown Commitment" Fourth Interim Report The above referenced letter indicated submittal of the Final Report to the USNRC on August 31, 1984.
At the present time,.wrification is ongoing and is scheduled to be completed in early September 1984. The Final Report is scheduled to be submitted to the USNRC on September 14, 1984.
Very truly yours, YY kstC T. F. Gerrets Corporate Quality Assurance Manager TFG:CNil:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555
.197 8409170156 040830 PDR ADOCK 05000382 B
d e
.o.
e.
- Mr. John T. Collins August 30, 1984 W3K84-2033 Page 2 cc: Director Office of' Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr. E. L.~Blake Shaw, Pittman, Potts'& Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 i
Mr. W. A. Cross 7910 Woodmont Avenue Suite 1200 Bethesda, Maryland 20814 l
4 3
f i
i
-