ML20097C538
| ML20097C538 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 02/05/1996 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9602090063 | |
| Download: ML20097C538 (1) | |
Text
......
..-~
St:tlan Cupprtt Coptrtmtnt r
= a,:-
l
- " PECO ENERGY
"-"~a< c - "'
Nuclear Group Headquarters i
965 chesterbrook Boulevard
[
Wayne, PA 19087-5691 February 5,1996 Docket Nos. 50 352 License Nos. NPF-39
-1 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Limerick Generating Station, Unit 1 Withdrawal of Request for Enforcement Discretion for Deferring Completion of Certain Technical Specifications Surveillance Requirements J
Gentlemen:
By letter dated February 3,1996, PECO Energy Company submitted a request for Enforcement Discretion (ED) to extend certain Technical Specifications (TS) Surveillance Requirements (SRs) for Umerick Generating Station (LGS), Unit 1. Specifically, PECO Energy requested that the TS SRs associated with containment leakage testing for several containment penetrations / valves be extended. Extending these SR intervals as requested would allow LGS, Unit 1, to continue operation for a short duration in support of the Pennsylvania-Jersey-Maryland Interconnection's (PJM's) declaration of a ' Cold Weather Alert" (made on Friday, February 2,1996) due to severe winter weather conditions (i.e., extreme cold) predicted for the Pennsylvania and New Jersey 4
area which was forecasted to last for several days. At the time this " Cold Weather Alert" was declared, LGS, Unit 1, had comrnenced its Sixth Refueling Outage (IR06). This requested ED would allow LGS, Unit 1, to remain operational to maintain PJM transmission system reliability and voltage stability on Monday, February 5,1996, and Tuesday, February 6,1996, due to a projected new all-time winter peak demand for PJM on Monday and Tuesday.
i Subsequently, on February 5,1996, PECO Energy was Informed by PJM that LGS, Unit 1, is no longer needed to provide electrical power based on PJM's updated load projections for its service territory. Therefore, PECO Energy is withdrawing its request for ED submitted by letter dated February 3,1996, to extend certain TS SRs for containment leakage testing.
If you have any questions or require additional information, please do not hesitate to contact us.
Very truly yours, A.o. Ap.).
G. A. Hunger, Jr.
Director - Licensing cc:
T. T. Martin, Administrator, Region I, USNRC f
N. S. Perry, USNRC Senior Resident inspector, LGS nn,
\\\\ s
\\
9602090063 960205 IV PDR ADOCK 05000352'
\\
p PDR
_