ML20097C326

From kanterella
Jump to navigation Jump to search
Forwards Info Required by Generic Ltr 95-05, in Order to Receive voltage-based Interim Repair Criteria for Outside Diameter Stress Corrosion Cracking at Tube Support Plate Intersections
ML20097C326
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/02/1996
From: Dennis Morey
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20097C331 List:
References
GL-95-05, GL-95-5, NUDOCS 9602080201
Download: ML20097C326 (1)


Text

..

' ~ ' '_.. _..

Southern Nucisar Op3 rating Company y

Post Office Box 1295 Birmingham, Alabama 35201

~

T@ltphons (205) 868-5131 4

Southern Nudear Operating Company

o. e morey

^

Vice President Farley Project the southern electnc System W

February 2,1996 Docket No.:

50-348 U. S. Nuclear Regulatory Commission ATfN.: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant - Unit 1 Steam Generator Tube Interim Renair Criteria Data Renort Ladies and Gentlemen:

In order to receive a voltage-based interim repair criteria for outside diameter stress corrosion cracking at tube support plate intersections, Southern Nuclear Operating Company committed to submit the information required by Generic Letter 95-05, " Voltage-Based Repair Criteria For Westinghouse Steam Generator Tubes Affected By Outside Diameter Stress Corrosion Cracking."

=

The required information is provided in the attached report.

If there are any questions, please advise.

Respectfully submitted, 9/ L#,

t Dave Morey REM /maf: iperprt. doc Attachment cc:

Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T. M. Ross Mr. T. A. Reed 080070

/

i g0(

9602080201 960202 Q

L i

PDR ADOCK 05000348

\\

P PDR

. _ _ _ _ _ _