Southern Nucisar Op3 rating Company y
Post Office Box 1295 Birmingham, Alabama 35201
~
T@ltphons (205) 868-5131 4
Southern Nudear Operating Company
- o. e morey
^
Vice President Farley Project the southern electnc System W
February 2,1996 Docket No.:
50-348 U. S. Nuclear Regulatory Commission ATfN.: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant - Unit 1 Steam Generator Tube Interim Renair Criteria Data Renort Ladies and Gentlemen:
In order to receive a voltage-based interim repair criteria for outside diameter stress corrosion cracking at tube support plate intersections, Southern Nuclear Operating Company committed to submit the information required by Generic Letter 95-05, " Voltage-Based Repair Criteria For Westinghouse Steam Generator Tubes Affected By Outside Diameter Stress Corrosion Cracking."
=
The required information is provided in the attached report.
If there are any questions, please advise.
Respectfully submitted, 9/ L#,
t Dave Morey REM /maf: iperprt. doc Attachment cc:
Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T. M. Ross Mr. T. A. Reed 080070
/
i g0(
9602080201 960202 Q
L i
PDR ADOCK 05000348
\\
P PDR
. _ _ _ _ _ _