Georgia Power Company 40 Inverness Center Parkway
. Pot Once Box 1295
'B rmingham Alabama 35201 I
Telephone 205 877-7122 L
C. K. McCoy Georcia Power u
Vce President Nuclear Vogtle Project the southem electric sntem January 31,1996 LCV-0136-K i
J Docket Nos.: 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 l
Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT GENERIC LETTER 89-10 CLOSE-OUT SUBMITTAL l
Georgia Power Company (GPC) requested approval to provide a submittal to facilitate the closure of the Vogtle Electric Generating Plant (VEGP) Generic Letter 89-10 program in licu of having a final inspection. The NRC subsequently approved this request in a letter dated August 25,1995. Pursuant to this approval, GPC is transmitting the VEGP Generic Letter 89-10 Close-Out Submittal, Volumes 1 and 2, to the NRC foi review.
Volume 1, entitled " Program Summary Report" provides a detailed description of the program undertaken to implement the recommendations contained in the generic letter.
Included in this report is a discussion of the engineering design review methodology, the
]
differential pressure test program which was undertaken to validate this methodology and the subsequent reconciliation of the differential pressure test results with the engineering methodology.
Volume 2, entitled " Design-Basis Capability Verification Report" outlines the basis for justifying that each of the 256 valves included in the program is capable of perfonning its design-basis function. The valves included in the program are divided into 30 groups of identical valves with capability justifications developed for each group based on in-situ differential pressure test data, EPRI Performance Prediction Program data or calculated margins.
{}.Qnn -
\\
9602080023 960131 PDR ADOCK 05000424 i
P PDR
e.
U. S. Nuclear Regulatory Commission Page 2 GPC believes that this submittal addresses all of the relevant issues associated with the VEGP GL 89-10 program in sufficient detail to facilitate the closure of the capability verification portion of the program. In addition, based on information provided at a Region II Workshop held in Atlanta on October 24,1995, GPC understands that the NRC has disassociated the issue of periodic differential pressure testing from the closure of GL 89-10. Therefore, this issue is not formally addressed in the VEGP close-out documentation.
Should you require any additional information regarding this response, please contact my office.
Sincerely, C. K. McCoy CKM et
Enclosures:
- 1. GL 89-10 Close-Out Submittal, Volume 1
- 2. GL 89-10 Close-Out Submittal, Volume 2 xc:
Georgia Power Comoany Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear.tegulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle 4
LCV-0136-K