ML20097B775

From kanterella
Jump to navigation Jump to search
Amends 93 & 71 to Licenses NPF-68 & NPF-81,respectively, Adding Footnote to TS 4.6.1.2.d Stating Type B & C Tests Scheduled for Unit 1 Refueling Outage,Cycle 6 (1R6) Will Be Conducted IAW Option B of 10CFR50 App J,Per RG 1.163
ML20097B775
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/02/1996
From: Imbro E
Office of Nuclear Reactor Regulation
To:
City of Dalton, GA, Georgia Power Co, Municipal Electric Authority of Georgia, Oglethorpe Power Corp
Shared Package
ML20097B780 List:
References
NPF-68-A-093, NPF-81-A-071, RTR-REGGD-01.163, RTR-REGGD-1.163 NUDOCS 9602070237
Download: ML20097B775 (6)


Text

- - -

ut p

'4 UNITED STATES g

j NUCLEAR REGULATORY COMMISSION o

WASHINGTON, D.C. 200e84001 GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON. GEORGIA V0GTLE ELECTRIC GENERATING PLANT. UNIT 1 AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No.

93 License No. NPF-68 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment to the Vogtle Electric Generating Plant, Unit 1 (the facility) Facility Operating License No. NPF-68 filed by the Georgia Power Company, acting for itself, Oglethorpe -

Power Corporation, Municipal Electric Authority of Georgia, and City of. Dalton, Georgia (the licensees),-dated October 16, 1995, as supplemented by letter dated December 22, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9602070237 960202 '

PDR ADOCK 05000424 P

PDR Qvv

j i J

2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.

NPF-68 is hereby amended to read as follows:

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 93

, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. GPC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMISSION L-w Eugene V. Imbro, Acting Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of Issuance:

February 2, 1996 w

o.g i

1 UNITED STATES g

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 200eH001

)

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON. GEORGIA V0GTLE ELECTRIC GENERATING PLANT. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 71 License No. NPF-81 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Vogtle Electric Generating Plant, Unit 2 (the facility) Facility Operating License No. NPF-81 filed by the Georgia Power Company, acting for itself, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, andi City of Dalton, Georgia (the licensees), dated October 16, 1995, as supplemented by letter dated December 22, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

4 2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.

4 NPF-81 is hereby amended to read as follows:

Technical-Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 71 and the Environmental Protection Plan contained in i

Appendix B, both of which are attached hereto, are hereby incorporated into this license. GPC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMISSION Eugene V. Imbro, Acting Director -

e t Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of Issuance:

February 2, 1996

..m

,m

1 ATTACHMENT TO LICENSE AMENDMENT NO. 93 FACILITY OPERATING LICENSE NO. NPF-68 DOCKET NO. 50-424 AND TO LICENSE AMENDMENT NO.

71 FACILITY OPERATING LICENSE NO. NPF-81 DOCKET NO. 50-425 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page.

The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.

Remove Pace Insert Paae 3/4 6-3 3/4 6-3 i

T CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS b.

If any periodic Type A test fails to meet 0.75 L the test schedule for subsequent Type A tests shall be reviewed an8 approved by the Commission.

If two consecutive Type A tests fail to meet 0.75 L,,

a Type A test shall be performed at least every 18 months until two consecutive Type A tests meet 0.75 L, at which time the above test schedule may be resumed; c.

The accuracy of each Type A test shall be verified by a supplemental test which:

1)

Confirms the accuracy of the test by verifying that the absolute value of the supplemental test result, L,, minus the sum of the Type A and the superimposed leak, L, is equal to or less than 0.25 L,;

2)

Has a duration sufficient to establish accurately the change in leakage rate between the Type A test and the supplemental test; and 3)

Requires that the rate at which gas is injected into the containment or bled from the containment during the supplemental.

test is between 0.75 L, and 1.25 L,.

d.

Type B and C tests shall be conducted with gas at a pressure not less than P, 37 psig, at intervals no greater than 24 months

  • except for testsinvolving:

1)

Air locks and 2)

Purge supply and exhaust isolation valves with resilient material seals.

e.

Air locks shall be tested and demonstrated OPERABLE by the require-ments of Specification 4.6.1.3; f.

Purge supply and exhaust isolation valves with resilient material seals shall be tested and demonstrated OPERABLE by the requirements of Specification 4.6.1.7.2; g.

The provisions of Specification 4.0.2 are not applicable.

V0GTLE UNITS - 1 & 2 3/4 6-3 Amendment No. 93 (Unit 1)

Amendment No. 71 (Unit 2)

..