Forwards ISI Rept Refueling 13 Interval 2 Period 3 Outage 1 Jm Farley Unit 1 Nuclear Generating Plant
ML20097B645
Person / Time
Site: Farley 
Issue date: 01/29/1996
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20097B648 List:
References
NUDOCS 9602070197
Download: ML20097B645 (2)


Text

.-

(..

Southern Nuclear Operating Company Post Offica Box 1295 Birmingham, Alabama 35201 T;lephona (205) 868-5131 k

L Southern Nudear Operating Company o... uo,.y har?e?'r'$e'c"t the southern elecinc system January 29, 1996 Docket No.: 50-348 10CFR50.55a(g) 10CFR50.36 1

U. S. Nuclear Regulatory Commission ATTN: Document ControlDesk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant - Unit 1 Interval 2/ Period 3/ Outage 1 Inservice Inspection Reoort Ladies and Gentlemen:

4 Pursuant to the requirements of 10CFR50.55a(g) and 10CFR50.36, Southern Nuclear Operating Company hereby submits the Joseph M. Farley Nuclear Plant Unit 1 Interval 2/ Period 3/ Outage 1 Inservice Inspection Report. This report describes and summarizes the inservice inspection activities performed during the Unit I thirteenth refueling outage. These activities were completed October 31,1995.

Included in this report are the results of the steam generator eddy current testing conducted during this outage as required by 10CFR50.55a(g) and Section 4.4.6 5.b of the Farley Nuclear Plant Unit 1 Technical Specifications. Specifically, the results and a summary may be found in Tab B. None of the information in this report is proprietary and may be reproduced as necessary under government regulations associated with public information rights.

\\

hbl i

j jb 9602070197 960129

~

~

gd'k '

' 'l,O PDR ADOCK 05000348 w

a G

PDR

.fi -

0C00g2 S'

I f

pW ft> (D phl I

gC

-. -.-.=_ -

L j-U. S. Nuclear Regulatory Commission Page 2 Other pertinent report information is available at Farley Nuclear Plant for your review. This information includes as applicable, examination plans and schedules, examination results and reports, examination methods and procedures, evaluation results, and corrective actions and i

repairs.

i If there are any questions, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY f

)hth Dave Morey EFB/ cit:isi_rptl. doc Enclosure l

l cc:

Mr. S. D. Ebneter, Region II Administrator w/1 Enclosure Mr. B. L. Siegel, NRR Senior Project Manager w/o Enclosure Mr. T. M. Ross, FNP Sr. Resident Inspector w/o Enclosure 4

,,