i SOUTH CAROLINA ELECTRIC & GAS COMPANY j
\\
VIRGIL C. SUMMER NUCLEAR STATION CORE OPERATING LIMITS REPORT FOR l
CYCLE 9 i
REVISION 2 JANUARY 18,1996 i
l i
9602070031 960131 DR ADOCK 0500 5
f
4 a-1 a,
i6-a wn O
Y a
LIST OF EFFECTIVE PAGES PAGE REVISION i
0 il 0
til 0
iv 0
1 0
2 2
3 0
4 0
5 0
6 0
7 0
8 0
9 0
10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
21 0
22 0
23 0
24 0
25 0
26 0
27 0
28 0
29 0
30 0
31 0
32 0
33 1
34 1
/
g O V. C. SUMMER CYCLE 9 SCEAG 2.0 Operating Limits The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the subsections which follow. These limits have been developed using the NRC-approved methodologies specified in Technical Specification 6.9.1.11.
2.1 Moderator Temperature Coefficient (Specification 3.1.1.3):
2.1.1 The Moderator Temperature Coefficient (MTC) limits are:
2.
The BOUARO-MTC shall be less positive than the limits shown in Figure 1.
The EOL/ARO/RTP-MTC shall be less negative than - 5x10-4 Ak/k/ F.
2 2.1.2 The MTC Surveillance limit is:
The 300 ppm /ARO/RTP-MTC should be less negative than or equal to -4 t x10-4 Ak/k/ F.
where: BOL stands for Beginning-of-Cycle-Life ARO stands for All-Rods-Out RTP stands for RATED THERMAL POWER EOL stands for End-of-Cycle-Life 2.2 Shutdown Rod Insertion Limits (Specification 3.1.3.5):
The shutdown rods shall be withdrawn to at least 225 steps.
2.3 Control Rod Insertion Limits (Specification 3.1.3.6):
The Control Bank Insertion Limits are specified by Figure 2.
i 2
REVISION 2